VANCOUVER, July 14, 2016 /CNW/ – GREAT PANTHER SILVER LIMITED (TSX: GPR; NYSE MKT: GPL) (“Great Panther”; the “Company”) announces production results for the second quarter (“Q2”) 2016 from its two wholly-owned Mexican silver mining operations: the Guanajuato Mine Complex (“GMC”), which includes the San Ignacio Mine, and the Topia Mine in Durango.
Second Quarter 2016 Production Highlights (Compared to Second Quarter 2015)
- Consolidated metal production decreased 5% to 1,037,728 silver equivalent ounces (“Ag eq oz”)
- Silver production decreased 17% to 536,726 silver ounces (“Ag oz”)
- Gold production increased 13%, with 6,010 gold ounces (“Au oz”) produced
- Ore processed increased 14% to 99,905 tonnes milled