VANCOUVER, July 13, 2016 /CNW/ – Capstone Mining Corp. (“Capstone”) (TSX: CS) today announced production results for the three and six months ended June 30, 2016. Combined production totalled 28,100 and 52,700 tonnes of copper in the second quarter and year-to-date periods, respectively, with additional by-products of zinc, molybdenum, lead, silver and gold.
Q2 2016 Copper Production (tonnes)
Q1 |
Q2 |
YTD 2016 |
|
Pinto Valley |
16,400 |
18,800 |
35,200 |
Cozamin |
3,700 |
3,300 |
7,000 |
Minto |
4,500 |
6,000 |
10,500 |
Total copper production (1) |
24,600 |
28,100 |
52,700 |
(1) Total production includes copper in concentrate and cathode production. |