Capstone Mining 2016 Second Quarter Production Results

http://www.juniorminingnetwork.com/junior-miner-news/press-releases/550-tsx/cs/22230-capstone-mining-2016-second-quarter-production-results.html

VANCOUVER, July 13, 2016 /CNW/ – Capstone Mining Corp. (“Capstone”) (TSX: CS) today announced production results for the three and six months ended June 30, 2016. Combined production totalled 28,100 and 52,700 tonnes of copper in the second quarter and year-to-date periods, respectively, with additional by-products of zinc, molybdenum, lead, silver and gold.

Q2 2016 Copper Production (tonnes)

Q1

Q2

YTD 2016

Pinto Valley

16,400

18,800

35,200

Cozamin

3,700

3,300

7,000

Minto

4,500

6,000

10,500

Total copper production (1)

24,600

28,100

52,700

 (1) Total production includes copper in concentrate and cathode production.

Leave a Reply