Colibri and Partner – Expands Main Zone by 70Metres – Returning 7.2 g/t Gold and 80 g/tSilver over 2.6 Meters Within 46.9 Meters of0.5 g/t Gold at the El Pilar Gold-Silver Project April 16, 2025 / gambusinoprospectormexico 2025-04-16_colibri and partner reports results from 3 holes ta pilar project_sonDownload Share this: Share on X (Opens in new window) X Share on Facebook (Opens in new window) Facebook Like this:Like Loading…