VANCOUVER, British Columbia–(BUSINESS WIRE)– Telson Mining Corporation (“Telson” or the “Company”) (TSX-V – TSN, OTC Pink – SOHFF, Frankfurt – TSGN (formerly SQ82)) is pleased to present the following update for activities at its 100% owned Campo Morado mine:
- Total mill throughput in Q2 of 162.5kt, a 9.3% increase from Q1
- 11.9 kdmt of zinc concentrate in Q2. 45.1% increase from Q1
- 1.9 kdmt of lead concentrate in Q2. 35.7% increase from Q1
- 8.6 kt of zinc in the zinc concentrate. 53.6% increase from Q1
- 0.6 kt of lead in the lead concentrate. 100.0% increase from Q1