DIEPPE, N.B., July 16th, 2018 (CBI: TSX-V) – Colibri Resource Corporation (“Colibri” or the “Company”) wishes to announce assay results from the last seven holes and two hole extensions completed on its Phase 1 reverse circulation (RC) drilling program on its 100% owned Pilar Gold Project in Sonora, Mexico. Highlights include an intersection of 61 meters (m) of 0.75 grams per tonne (g/t) gold (Au) which includes 17.3 g/t over Au over an intersection of 1.5 m in hole JES-18-24. (all assays in program are 1.5 m in length)