Plomosas Mine- Extensional Drilling Hits Massive Sulphide Mineralisation

http://www.consolidatedzinc.com.au/wp-content/uploads/2017/08/170817-Extensional-Drilling-Hits-Massive-Sulphide-Mineralisation.pdf

Consolidated Zinc Limited (ASX:CZL, “the Company”) has successfully intersected massive sulphide mineralisation and grades up to 34.7% Zn + Pb during resource expansion drilling at its high grade Plomosas Zinc Project in Mexico.
Drilling is designed to extend and infill the current JORC mineral resource at Tres Amigos and Tres Amigos North, and has continued to intersect significant zinc-lead mineralisation where predicted.
The JORC Resource upgrade and Scoping Study are on-track for release in the third quarter of 2017.
Resource Drilling Highlights
Extension drilling to the south of the 140 metre strike zone previously described between two highgrade holes has found multiple zones of massive mineralisation (LV5025 and LV5026).
The best intercepts include:
 LV5025 1.50m at 8.04 % Zn, 0.01% Pb, 7.33 g/t Ag
and 1.35m at 34.71 % Zn, 0.01% Pb, 18.80 g/t Ag
 LV5026 0.50m at 9.37 % Zn, 0.27% Pb, 13.30 g/t Ag
and 1.00m at 7.16 % Zn, 0.43% Pb, 10.70 g/t Au

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s