Marlin Gold Ships 10,121 Ounces Gold in January at US$290 per Ounce Total Costs at La Trinidad

http://www.stockhouse.com/news/press-releases/2017/02/06/marlin-gold-ships-10-121-ounces-gold-in-january-at-us-290-per-ounce-total-costs

VANCOUVER, Feb. 6, 2017 /CNW/ – Marlin Gold Mining Ltd. (TSX-V: MLN) (“Marlin” or the “Company”)  is pleased to provide an operating update from its wholly owned La Trinidad mine in Sinaloa, Mexico (“La Trinidad”).
Since September 15, 2016, when Marlin began consistently mining the high grade HS Zone, the Company has stacked 66,923 ounces of gold with 7,447 coming in January alone.  The tonnes stacked in January had an average grade of approximately 1.87 grams per tonne.  In addition, Marlin has built up an approximately 485,000-tonne stockpile of mineralized material with an average grade of approximately 1.37 grams per tonne.  Management expects to process grades similar to the average stockpile grade as we accelerate mining to reach the southern part of the high grade HS Zone by the third quarter of this year.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s