US. ANTIMONY REPORTS LOS JUAREZ PRODUCTION PLANS

http://www.usantimony.com/2017_newsroom.htm#U._S._ANTIMONY_REPORTS_LOS_JUAREZ_PRODUCTION_PLANS

July 3, 2017. Thompson Falls, Montana. United States Antimony Corporation (“USAC”, NYSE MKT “UAMY”) reported that following the milling of 400 metric tons of Los Juarez gold/silver/antimony at the Puerto Blanco mill in Guanajuato, Mexico that it will proceed with the cyanide circuit to increase the recoveries of both the silver and gold from the flotation mill tailings. Initial results of the floatation assays without the cyanide circuit are as follows:

Item Gold Silver Antimony
Heads 0.035 opmt 3.27 opmt 0.652%
Tails 0.016 opmt 1.618 opmt 0.348%
Recovered grade 0.019 opmt 1.65 opmt 0.17%
% recovery 52.8% 49.6% 31.5

(opmt = ounces per metric ton)

The flotation concentrate contained 2.52 opmt gold, 496.4 opmt silver, and 52.0% antimony. The floatation concentrates will be processed by the caustic leach circuit which is operational.

Cyanide testing of the mill tailings has indicated excellent recoveries, and the antimony recovery has been on the order of 70% at lower depths. The estimated recovery of the values after the caustic leach and cyanide circuit of the tailings is as follows:

Metal Assay Recovery Value Value /mt
Gold 0.035 opmt 90% $1,250/oz $39.38
Silver 3.27 opmt 90% $16.50/oz $48.56
Antimony 0.652% 70% $3.90/lb $39.12
Total $127.06

Construction of the cyanide leach circuit for the Puerto Blanco mill tailings will begin when the permit is approved by SEMARNAT (Mexican equivalent of the EPA). Tentatively, the plan is to leach in Mexico and handle the second part of the process in Montana which is expected to cut Capex costs significantly, reduce operating costs, and expedite the start of the circuit.

Following are the sales estimates for Q2 2017 compared to Q2 2016:

Product Q2 2017 Q2 2016 % change
Antimony pounds 505,760 732,802 -31.0
Zeolite tons 3,352 4,218 -20.5
Silver ounces 17,552.32 29,219.25 -39.9
Gold ounces 61.1552 76.09 -19.62

Marlin Gold Ships 10,121 Ounces Gold in January at US$290 per Ounce Total Costs at La Trinidad

http://www.stockhouse.com/news/press-releases/2017/02/06/marlin-gold-ships-10-121-ounces-gold-in-january-at-us-290-per-ounce-total-costs

VANCOUVER, Feb. 6, 2017 /CNW/ – Marlin Gold Mining Ltd. (TSX-V: MLN) (“Marlin” or the “Company”)  is pleased to provide an operating update from its wholly owned La Trinidad mine in Sinaloa, Mexico (“La Trinidad”).
Since September 15, 2016, when Marlin began consistently mining the high grade HS Zone, the Company has stacked 66,923 ounces of gold with 7,447 coming in January alone.  The tonnes stacked in January had an average grade of approximately 1.87 grams per tonne.  In addition, Marlin has built up an approximately 485,000-tonne stockpile of mineralized material with an average grade of approximately 1.37 grams per tonne.  Management expects to process grades similar to the average stockpile grade as we accelerate mining to reach the southern part of the high grade HS Zone by the third quarter of this year.

Marlin Gold Ships 9,924 Ounces Gold in December at US$250 per Ounce Total Costs at La Trinidad

https://www.juniorminingnetwork.com/junior-miner-news/press-releases/772-tsx-venture/mln/27948-marlin-gold-ships-9-924-ounces-gold-in-december-at-us-250-per-ounce-total-costs-at-la-trinidad.html

VANCOUVER, Jan. 4, 2017 /CNW/ – Marlin Gold Mining Ltd. (TSX-V: MLN) (“Marlin” or the “Company”)  is pleased to provide an operating update from its wholly owned La Trinidad mine in Sinaloa, Mexico (“La Trinidad”).

Since September 15, 2016, when Marlin began consistently mining the high grade HS Zone, the Company has stacked 59,456 ounces of gold with 18,431 coming in December alone.  The tonnes stacked in December had an average grade of approximately 5.17 grams per tonne.  In addition, Marlin has built up an approximately 488,000-tonne stockpile of mineralized material with an average grade of approximately 1.60 grams per tonne.  Management expects to process grades similar to the stockpile grade as we accelerate mining to reach the southern part of the high grade HS Zone later this year.

Marlin Gold Stacks 21,567 Ounces Gold in November at La Trinidad

https://www.juniorminingnetwork.com/junior-miner-news/press-releases/772-tsx-venture/mln/27339-marlin-gold-stacks-21-567-ounces-gold-in-november-at-la-trinidad.html

VANCOUVER, BRITISH COLUMBIA–(Marketwired – Dec. 5, 2016) – Marlin Gold Mining Ltd. (TSX VENTURE:MLN) (“Marlin” or the “Company”) is pleased to provide an operating update from its wholly owned La Trinidad mine in Sinaloa, Mexico (“La Trinidad”).

Since September 15th, when Marlin began consistently mining the high grade HS Zone, the Company has stacked 41,029 ounces of gold with 21,567 coming in November alone. The tonnes stacked in November had an average grade of approximately 5.26 grams per tonne. In addition, Marlin has built up an over 75,000-tonne stockpile of mineralized material at similar grades waiting to be crushed and stacked onto the leach pad.

The recoveries of gold from the leach pad have increased by approximately 33% since the end of last month, from 210 ounces per day to 279 ounces per day. Importantly, our current leach curves are confirming the SRK Consulting estimates of 75% with no apparent leach inefficiencies (please see the news release on November 2, 2016 for important technical disclosures about projected leach pad recoveries).

DynaResource, Inc. Reports October 2016 Gold Production and Results of Operations at San Jose de Gracia

http://www.otcmarkets.com/stock/DYNR/news?id=144369

RVING, TX–(Marketwired – Nov 9, 2016) – DynaResource, Inc. (OTCQB: DYNR) (“DynaUSA”, and “the Company”) is pleased to announce that Mineras de DynaResource S.A. de C.V. (“DynaMineras”), the 100% owned subsidiary of DynaUSA and the exclusive operator of the San Jose de Gràcia Property in northern Sinaloa, México (“SJG”), is reporting the delivery for sale, on October 31, 2016, of an approximate 550 Oz gold contained in concentrates (exact weights in gold and silver oz. to be determined at final settlement).

DynaMineras further reports October 2016 production of an approximate total of 1,275 Oz gold contained in concentrates (exact weights in gold and silver oz. to be determined at final settlement). DynaMineras reports the below summary of the pilot mill operations conducted during October, with assays reported in accordance with internal lab reports:

1) 4,550 Tons: Feed material processed;
2) 11.39 g/t Au: Average grade of mill feed;
3) 1,275 Oz Gold: Gold concentrates produced (exact weights in gold and silver Oz to be determined at final settlement of sale);