Drilling confirms further high grades at Plomosas

Click to access 20160714-CZL-Announcement-14-July-2016-FINAL.pdf

Ongoing drilling at Consolidated Zinc Limited’s (ASX: CZL; “Consolidated Zinc” or “the Company”) Plomosas project in Mexico has confirmed the extension of massive sulphide mineralisation. The further high grade discoveries come from deeper drilling below the Company’s level 7 mine development. Visual results for holes LV7DD020 to 022 and LV7023 were previously reported and subsequent assay results confirmed those observations with grades up to 50% Zn and Pb over true widths up to 5.20m. Table 1 summarises the grades and intervals returned. In addition, drill holes LV7024 and LV7026 were completed with the latter returning 8.50m (TW 3.02m) at 34.99% Zn, 15.40% Pb and 158.5 g/t Ag

Leave a Reply