Mexus Gold.- Leaching process started at the Santa Elena mine

Leaching process started at the Santa Elena mine _ Mexus Gold US

CABORCA, Mexico, June 3rd, 2019 (GLOBE NEWSWIRE) — Mexus Gold US (OTCQB: MXSG) (“Mexus” or the “Company) announced that blast hole drilling continues on the Julio vein system at its Santa Elena mine. More than 150 holes, at depths from 4 to 8 meters, have been drilled covering 240 meters in length along the 1 to 5-meter-thick quartz vein coincident with a flat- east dipping trust structure. All holes are being hand sampled and composited in groups of 5 to 6 holes for gold and silver presence in addition to grade control. Approximately 5700 tons of high-grade quartz vein material will be broken on site and hauled to the crushing and leaching site. The estimated grade for this material is in the order of 5 to 10 g/t Au and 9 to 12 g/t Ag. In addition, Mexus is testing and pilot processing material from the adjacent shear zone which is averaging 1.8 g/t Au and 7 g/t Ag.

Leave a Reply