ALORO MINING CORP. – (the “Company”) has completed drilling at the Los Venados (LV) Project and has received the assay results. The drilling included four drill holes for approximately 1347 meters of drilling. The four drill holes were targeting to locate and test a “blind” mineralized felsic dome structure adjacent to the Mulatos active mine’s high grade Escondida gold bearing felsic dome. This target was projected from data and mapping all acquired from the completion of 12 prior drill holes in late 2018 and more specifically by drill hole LVRC-012.