Drilling continues at Mexus Gold US’s Santa Elena mine

Drilling continues at Mexus Gold US_s Santa Elena mine

CABORCA, Mexico, Nov. 26, 2018 (GLOBE NEWSWIRE) — Mexus Gold US (OTCQB: MXSG)(“Mexus” or the “Company”) announced that drilling continues at its Santa Elena mine project with no delays and is now on the 7th hole.  Five holes were drilled along the Julio Vein-Shear zone for a strike distance of 250 meters with 35 to 40 meter spacing.  The purpose is to test the continuity at 25 to 30 meter depths of both the quartz vein and the shear zone that are in the main prospect area.  Drill holes proved the continuity at depth of the main quartz vein varying in width from 0.75 m up to 2.0 meters at 25 to 35 meters deep with a dip angle of 45 degrees to the East.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s