Sable Extends Margarita Vein Continuity to 750m Along Strike, Intersects 252.01g/t AgEq over 11.3m including 889.5g/t AgEq over 1.3m

SableResources_12092018_nr

TORONTOSept. 12, 2018 /CNW/ – Sable Resources (TSX.V: SAE) (the “Company” or “Sable”) is pleased to announce results from drillholes 9 to 12 targeting the Margarita Vein from its ongoing 12-hole drill program at the Margarita Project, Chihuahua State, Mexico. Drillholes M-DDH-18-11 and M-DDH-18-12 are a 250m step-out to the northwest from previously released holes M-DDH-18-05 and M-DDH-18-07. Hole M-DDH-18-09 is located on the same section line than previously released drillhole M-DDH-18-04. Drillhole M-DDH-18-10 is located on the same section line as previously released drillholes DDH-18-06 and 08. These latest results confirm continuity of the Margarita structure over a strike length of 750m.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s