us antimony reports progress on au-ag leach plant and strong zeolite sale
THOMPSON FALLS, MT / ACCESSWIRE / May 7, 2018 / United States Antimony Corporation (“USAC”, NYSE American: UAMY) reported progress on the construction of the leach plant for the Los Juarez gold-silver-antimony deposit in Queretaro, Mexico. The excavation and lining of the tailings pond is the largest and most expensive project, and it is underway. The concrete floor of the leach plant is being poured and initially no building will be necessary over the floor. Much of the equipment is being assembled in Montana and also in Mexico. Testing and shake-down of the plant is anticipated in Q4 2018.