Click to access 06-Jun-15-Soil-Results-Drill-Stations.pdf
Canuc Resources Corporation (“Canuc” or the “Company”) (TSX-V: CDA) is pleased to
announce the results of a soil sampling program recently completed on the San Javier project. A total of 859 samples were collected and analyzed for multi-elements along the known trace of the San Javier Mineralized Corridor (SJMC). Forty-five lines, spaced fifty metres apart, were surveyed and sampled between the Polvorin mine portal and the NE end of property, a distance of 2,200 metres. The lines were between 300 m and 400 m in length, and samples were taken every 20 m along the lines.