Canuc Announces Soil Results and Preparation of Drill Stations

http://canucresources.ca/wp-content/uploads/2017/06/06-Jun-15-Soil-Results-Drill-Stations.pdf

Canuc Resources Corporation (“Canuc” or the “Company”) (TSX-V: CDA) is pleased to
announce the results of a soil sampling program recently completed on the San Javier project. A total of 859 samples were collected and analyzed for multi-elements along the known trace of the San Javier Mineralized Corridor (SJMC). Forty-five lines, spaced fifty metres apart, were surveyed and sampled between the Polvorin mine portal and the NE end of property, a distance of 2,200 metres. The lines were between 300 m and 400 m in length, and samples were taken every 20 m along the lines.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s