Mexican Gold Infill/Extension Drilling Expands El Dorado-Juan Bran Zone on Strike and Intersects High-Grade

https://www.canadianinsider.com/mexican-gold-infill-extension-drilling-expands-el-dorado-juan-bran-zone-on-strike-and-intersects-high-grade

THUNDER BAY, ONTARIO–(Marketwired – May 17, 2017) – Mexican Gold Corp. (“Mexican Gold” or the “Company”) (TSX VENTURE:MEX) is pleased to announce that the final holes for its phase 1 infill/extension drilling program at its Las Minas gold project have expanded the footprint of the El Dorado/Juan Bran mineralized zone on strike. Additionally, high-grade mineralization has been intersected in a number of holes, including both upper and lower zones in diamond drill hole LM-17-ED-38 as well as holes LM-17-ED-31, LM-17-ED-35 and LM-JB-16.

The western boundary of the mineralized zone was extended on strike by holes LM-17-JB-15, LM-17-JB-16 and LM-17-JB-18. These holes intersected strong mineralization up to 90 metres beyond the extent of mineralization defined by earlier drilling.

A total of 24 diamond drill holes were drilled as part of the infill/ extension program during the period from February 18th to April 12th, 2015.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s