Telson Resources Inc. Retains Metal Mining Consultants Inc. to Prepare Pre-Feasibility Study to NI 43-101 Standards for 500 tonne per Day Underground Mining Operation

http://www.juniorminingnetwork.com/junior-miner-news/press-releases/1592-tsx-venture/tsn/21273-telson-resources-inc-retains-metal-mining-consultants-inc-to-prepare-pre-feasibility-study-to-ni-43-101-standards-for-500-tonne-per-day-underground-mining-operation.html

VANCOUVER, BRITISH COLUMBIA / TheNewswire / June 20, 2016 – Telson Resources Inc. (TSX Venture – TSN) (“Telson” or the “Company“) is pleased to announce that it has retained Metal Mining Consultants Inc. of Highlands Ranch, CO (herein “MMC“) to complete a pre-feasibility level technical report (“PFS“) that will be written to the specifications of National Instrument 43-101 Standards of Disclosure for mineral projects. The report will take major components of an internal scoping study (“ISS”) prepared by Reyna Mining (“Reyna”) and bring it to NI 43-101 pre-feasibility disclosure requirements for a 500 tonne/day underground mining operation. Reyna is considered an insider of the Company as defined by NI 43-101 and as such their report must be validated by an independent third party in order to meet the requirements for public disclosure.

Leave a Reply