Alio Gold To Commence Underground Decline And Exploration Program At Ana Paula

http://aliogold.com/investors/news-releases/index.php?&content_id=354

September 18, 2017, Vancouver, BC – Alio Gold Inc. (TSX, NYSE AMERICAN: ALO) (“Alio Gold” or the “Company”), is pleased to announce the board of directors has formally approved an underground exploration decline (“decline”) and exploration program at its high grade, high margin Ana Paula Project located in Guerrero, Mexico. The Company also received the authorization to start construction of the decline from SEMARNAT (Mexico’s Secretary of Environment and Natural Resources).

Highlights

  • Initiating a $16 million underground decline and exploration program
  • Exploring the extension of the high-grade breccia mineralization and skarn target
  • Permitting of the decline approved by SEMARNAT
  • Receiving detailed bid proposals from contract miners during September 2017
  • Mobilizing of the contractor expected to commence in October 2017
  • Initiating an additional $1.8 million surface exploration program targeting a zone north of the proposed pit
  • Drilling underway to twin 11 holes (2,000 metres) for metallurgical testing

OPOSURA UPDATE AND EXPLORATION TARGET

Click to access 1715010.pdf

Azure Minerals Limited (ASX: AZS) (“Azure” or “the Company”) is pleased to report that
preparations for its first drilling program on the Oposura zinc-lead-silver project are complete and drilling will commence as soon as the Company has received the requisite permits, expected in early to mid-October.
The proposed drilling plan comprises about 100 diamond core holes for approximately 5,000 metres. At least two, and possibly three, drill rigs will be mobilised to site in order to complete the program as quickly as possible. The Company plans to use this drilling data, plus historical information, to undertake a maiden mineral resource estimate in the first quarter of 2018.
Drilling by previous explorers of 85 surface holes tested the mineralised zone over an area of approximately 1,400m (east-west) x 400m (north-south) (see Figure 1). Early drilling by Azure will twin some of these historical holes to assess whether they can be used in defining the deposit and estimating the mineral resource.

Goldcorp Provides Second Quarter 2017 Exploration Update

http://www.goldcorp.com/English/Investor-Resources/News/News-Details/2017/Goldcorp-Provides-Second-Quarter-2017-Exploration-Update/default.aspx

VANCOUVER, July 26, 2017 GOLDCORP INC(TSX: G, NYSE: GG) (“Goldcorp” or the “Company”) is pleased to provide an update on its 2017 exploration program.  Representative drill results are provided below; website links to further information including full drill results, drill coordinates, QA/QC information and relevant diagrams are provided at the end of each section.

Highlights

  • Drilling at Cerro Negro continues to return positive results; exploration budget increased. 2017 budget increased by $6 million to $26 million to accelerate testing of early stage targets with drilling planned at Silica Cap, Eureka SE, San Marcos West, San Marcos Sur and Mariana Sur.
  • Generative work at Peñasquito yields further targets; new property acquired. An additional nine targets have been added at Peñasquito and plans are underway to complete regional reverse circulation (“RC”) drilling through cover sequences. La Pinta 06 mining concession acquired for $225,000.
  • Drilling at the Coffee Project adds to resource potential. Drill results from Arabica and Supremo T8-9 confirm continuity of mineralization, infill drilling at Latte confirms geologic model and first results from Decaf confirm prospectivity.
  • Building geological team for Maricunga District in Chile. Recruitment and logistics being finalized to start geological work on the newly acquired Maricunga District, including a re-logging of core and updating the geological models for both Cerro Casale and Caspiche, as well as developing a five year exploration program.
  • Property scale exploration programs underway at Canadian operations. Field programs are underway to build a portfolio of targets at all sites as well as define drill programs for the winter season.