Minera Alamos Intersects 248 Metres of 0.60 g/t Gold Ending in Mineralization From Ongoing Drilling at the Santana Gold Project, Sonora, Mexico

2020_04_30_nicho_drill_results_final

Minera Alamos Inc. (the “Company” or “Minera Alamos”) (TSX VENTURE:MAI) is pleased to report additional drill results from its Phase 2 drill program at the Santana gold project, Sonora, Mexico.  The new holes were intended primarily to evaluate the southwest and southerly extensions of the Nicho main zone as the Company works to fully define the outer limits of the proposed Nicho pit.  A deeper hole (S20-134) was also drilled to test the geological structures at vertical depths below most of the previous drilling completed at Nicho. Both objectives met with success as the Company continued to expand the known mineralization to the south-southwest while also demonstrating the depth potential of the Nicho pipe system with hole S20-134 finishing in strong mineralization at 314.7m (down hole).

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s