MINERA ALAMOS DRILLS 93.5 METRES OF 0.65 G/T GOLD FROM SURFACE AT SANTANA PROJECT

0803F13B-FD76-4599-B8D53CB52C4CC3ED

Minera Alamos Inc. (the “Company” or “Minera Alamos”) (TSX VENTURE:MAI) is pleased to report the initial results from its Phase 1 drill program at the Santana gold project, Sonora, Mexico. The 2018 drill program is the first exploration drilling to be conducted at Santana since 2011. The first three holes were drilled near or within the Nicho deposit and were intended to evaluate mineralized extensions of previous exploration programs. All drill holes encountered zones of disseminated gold mineralization. Initial results support the Company’s long held belief that there are numerous exploration targets in the Santana project area that could add significantly to the ongoing development plans of a proposed heap-leach operation currently awaiting receipt of commercial-scale permits from the Mexican authorities (see release dated July 26th, 2018).

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s