Sable Intersects 461.4g/t AgEq over 14.05m including 859.5g/t AgEq over 2.0m

Sable Intersects 461.4g_t AgEq over 14.05m including 859.5g_t AgEq over 2.0m

TORONTOAug. 14, 2018 /CNW/ – Sable Resources (TSX.V: SAE) (the “Company” or “Sable”) is pleased to announce results from drillholes 7 and 8 targeting the Margarita Vein from its ongoing 12-hole drill program at the Margarita Project, Chihuahua State, Mexico. Drillhole M-DDH-18-07 is located on the same section line as previously released drillhole M-DDH-18-05 (Sable Press Release dated July 26 2018). Drillhole M-DDH-18-08 is situated on the same section line as previously released drillhole M-DDH-18-06 (Sable Press Release dated August 7 2018). Designed to test continuity at depth drillholes 7 and 8 confirm extent and grade of the Margarita structure from surface to 80 meters down dip.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s