http://aliogold.com/investors/news-releases/index.php?content_id=382
December 20, 2017, Vancouver, BC – Alio Gold Inc (TSX, NYSE MKT: ALO) (“Alio Gold” or the “Company”), is pleased to provide the final drill results from the 2,000 metre drill program to twin previous drill holes within the pre-feasibility pit for metallurgical test work samples at its Ana Paula project in Guerrero, Mexico.
Highlights
- Final drill results received from the 2,000m drill program for metallurgical sampling, confirm high-grade mineralization and lithology in the Mineral Resource Estimate (‘MRE’) dated May 16, 2017 as per the NI 43-101 Preliminary Feasibility Study
- Drill hole 17-13 intersected 112.0m (from 8.0m to 120.0m) of 3.85 g/t gold
- Drill hole 17-14 intersected 33.1m (from 116.9m to 150.0m) of 7.07 g/t gold
- Drill hole 17-15 intersected 54.6m (from 11.6m to 66.2m) of 7.19 g/t gold