MEXICAN GOLD MOBILIZES DRILL RIG BACK TO EL DORADO/JUAN BRAN FOR INFILL AND RESOURCE EXPANSION DRILLING SURROUNDING HIGHGRADE MINERALIZATION INTERSECTED IN HOLE LM-17-ED-40

http://www.mexicangold.ca/_resources/news/nr-2017-11-15.pdf

Mexican Gold Corp. (“Mexican Gold ” or the “Company”) (TSX-V: MEX / OTCMKTS: SRXLF / FRA: 4QW1) is pleased to announce that it has commenced infill and resource expansion drilling to extend the three high – grade zones intersected in recently completed hole LM -17-ED -40. Hole LM-17 ED-40 was drilled as a resource expansion hole and intersected three high- grade intervals over significant widths.
The hole cut a cumulative 94.35 meters of high-grade mineralization over three zones. The main zone graded 9.24 g/t Au Eq over 38.0 metres contained within 54.0 metres grading 6.91 g/t Au Eq. The upper zone graded 5.33 g/t Au Eq over 5.0 metres contained within 19.0 metres grading 2.45 g/t Au Eq.
And the middle zone graded 3.99 g/t Au Eq over 11.35 metres contained within 21.35 metres grading 2.45 g/t Au Eq. – see press release November 14, 2017

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s