Mesa de Plata Resource Update.- Azure Minerals

Click to access 434107kl33rjbh.pdf

Azure Minerals Limited (ASX:AZS) (“Azure” or “the Company”) is pleased to advise that the mineral resource drill-out program of the Mesa de Plata Silver project is nearing completion. Silver mineralisation has been intersected over the full 900m length of the Mesa de Plata ridge line, with a very strong central zone hosting high silver grades over significant thicknesses.

To date, 47 of 55 planned holes have been completed and assays have been received for the first 36 holes. some of the better RC drill intercepts are shown below in Table 1, and details of all significant mineralised intercepts are shown in Table 3.

Leave a Reply