Silver Viper Hits 11.70 M @ 9.18 G/T Au And 352.0 G/T Ag Including 0.50 M @ 183.50 G/T Au And 6,850 G/T Ag While Infill Drilling At El Rubi And Expands The 5,000 M Drill Program At La Virginia Project In Sonora Mexico

Leave a Reply