Mexico’s Best Drilling Intercepts, Third Week of May 2024

Only Tocvan Ventures released results from drilling in Mexico during the third week of May 2024. Those come from the ongoing reverse circulation (RC) drilling campaign at its Pilar property in central Sonora. The news release focus on a hole in one of the three original structural trends in the project, the 4-T trend, showing the best results of drilling on that trend. A total of 1,825.4 meters has been drilled to date in 15 drill holes, with results from 11 holes still pending.

Leave a Reply