Gold recovery continues at Santa Elena mine

Gold recovery continues at Santa Elena mine

CABORCA, Mexico, Nov. 18, 2019 (GLOBE NEWSWIRE) — Mexus Gold US (OTCQB: MXSG) (“Mexus” or the “Company) confirmed that leaching commenced 11/12/2019 at its Santa Elena mine located in Caborca, Mexico.  Initial returns showed .48gpt but slowed due to improper Ph control.  To mitigate this problem the company installed an automated Ph/Cyanide aeration control pumping system which was tested and worked as expected.  Gold recovery has resumed as well as additional mining of new mineralized material from the Lucky Strike open pit.  Mexus President Paul Thompson states this recent correction will allow for a substantial increase in gold recovery from the 1.8gpt Au head ore.

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s