CABORCA, Mexico, August 26th, 2019 (GLOBE NEWSWIRE) — Mexus Gold US (OTCQB: MXSG) (“Mexus” or the “Company) is pleased to announce that it has commenced leaching on an estimated 5000 tons of mineralized material that has been placed on the mines heap leach pad at a rate of 200 M3 daily. Optimal grade of the material content of 3 to 4 ppm gold is expected to flow from the pad and stabilize within a week. The Merrill Crowe Zinc Precipitation gold recovery plant should operate at 60 M3 per day, with expected production of 5 to 8 ounces of recovered gold production per day, culminating in continuous positive revenue generation.