Drilling completed at Mexus Gold US’s Santa Elena mine

Drilling completed at Mexus Gold US_s Santa Elena mine

CABORCA, Mexico, Dec. 03, 2018 (GLOBE NEWSWIRE) — Mexus Gold US (OTCQB: MXSG)(“Mexus” or the “Company”) announced that the first stage of exploration drilling has finished at the Santa Elena Project with 736 meters of core in 9 holes.  The purpose of this initial drilling program is to study a major area of geologic interest where a high-grade gold quartz vein merges with a tectonic shear zone with gold/silver values.  In the area, the shear zone outcrops with 8 to 10 meters width with a low angle dip to the East and it is cut by a steeper 0.75 to 1.5 meter wide quartz vein which has previously assayed high grades of gold.  200 core samples were collected from drilling and are being sent to ALS-Chemex labs for assays.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s