Kootenay Reports on Annual General Meeting

http://www.stockhouse.com/news/press-releases/2017/01/20/kootenay-reports-on-annual-general-meeting

VANCOUVER, Jan. 20, 2017 /CNW/ – Kootenay Silver Inc.  (TSXV: KTN) (the “Company” or “Kootenay”) reports that at its annual general meeting held on November 30, 2016, that Shareholders voted in favor of all items of business before the meeting, including the election of the following incumbent directors for the ensuing year: Kenneth E. Berry, James M. McDonald, Brian Groves, Joseph P. Giuffre, Nathaniel Jon Morda, Andrea Zaradic and Antonio Reda.

Additionally, the Company reports stock options have been granted to officers, directors and consultants of the Company to purchase up to an aggregate of 6.695 million shares at a price of $0.40 per share for a period of five years.

 

Alamos Gold Provides Notice of Fourth Quarter and Year-End 2016 Financial Results and Conference Call

http://www.stockhouse.com/news/press-releases/2017/01/20/alamos-gold-provides-notice-of-fourth-quarter-and-year-end-2016-financial

Alamos Gold Inc. (TSX:AGI)(NYSE:AGI) (“Alamos” or the “Company”) plans to release its fourth quarter and year-end 2016 financial results before the start of trading on Thursday, February 23, 2017. Senior management will host a conference call at 11:00 am ET on that day to discuss the results.

Mexus Gold Issues Santa Elena update

http://finance.yahoo.com/news/mexus-gold-issues-santa-elena-080100211.html

CARSON CITY, Nev., Jan. 19, 2017 (GLOBE NEWSWIRE) — Mexus Gold US (MXSG)(“Mexus” or the “Company”)  released an update on its Santa Elena mine.  MarMar Holdings Inc., the mine operator at the Santa Elena, is currently loading ore on the heap leach pad.  As previously stated, the equipment currently on site is insufficient to meet the scale of the project.  The time and associated costs of using this equipment is prohibitive in the long run.  MarMar is moving a larger crusher to the site that once installed will speed the loading process.  Installation of this larger crusher will allow the company to optimize and maximize its daily output of ore and lead to much faster completion of the first lift.   The cyanide leaching system will be placed on this first lift when done.

Setup and install of the recently delivered Merrill Crowe recovery plant is now finished.  The on-site crew is currently assembling the inflow and outflow pipes for this system which should be completed in short order.  The retention ponds are lined and ready for cyanide solution which will be one of the last steps prior to the production of gold commencing.

Geologix Announces Tepal Preliminary Economic Assessment: US$169M After-Tax NPV (5%) and 24% IRR Using US$1,250/oz. Gold Price and US$2.50/lb Copper Price With US$214M Initial Capex

http://www.stockhouse.com/news/press-releases/2017/01/19/geologix-announces-tepal-preliminary-economic-assessment-us-169m-after-tax-npv

VANCOUVER, BRITISH COLUMBIA–(Marketwired – Jan. 18, 2017) – Geologix Explorations Inc. (TSX VENTURE:GIX)(FRANKFURT:GF6)(BERLIN:GF6)(STUT:GF6)(MUN:GF6)(“Geologix” or “the Company”) is pleased to announce the results of a positive, independent Preliminary Economic Assessment (“PEA”) on its 100% owned Tepal Gold/Copper Project (“Tepal” or the “Project”) located in southwest Mexico. All currency values are in U.S. dollars unless otherwise indicated.

The PEA supports Tepal’s robust economic potential as an open pit operation using contract mining. Sulphides will be milled and processed via a 22,000 tonnes per day (“tpd”) copper, gold and silver (“Cu/Au/Ag”) flotation concentrate circuit combined with a secondary carbon-in-leach (“CIL”) circuit producing gold and silver (“Au/Ag”) doré. Oxides will be milled and processed via a separate 5,500 tpd CIL circuit producing Au/Ag doré.

 

Source to Exhibit at the Vancouver Resource Investment Conference and the 2017 Vancouver Roundup

http://www.stockhouse.com/news/press-releases/2017/01/19/source-to-exhibit-at-the-vancouver-resource-investment-conference-and-the-2017

THUNDER BAY, ONTARIO–(Marketwired – Jan. 19, 2017) – SOURCE EXPLORATION CORP. (the “Company” or “Source”) (TSX VENTURE:SOP) is pleased to announce that it will be exhibiting at the upcoming Vancouver Resource Investment Conference on January 22nd and 23rd and participating in Frank Holmes’ session titled Concise, Comprehensive and Compelling Stories. The Frank Holmes session is scheduled from 11:00 am to 12:00 noon on January 22nd at the Speaker Hall, Vancouver Convention Centre West.

The company will also be exhibiting at the AME BC Mineral Exploration Roundup 2017 Conference also being held in Vancouver at Canada Place from January 23rd to 26th.

Source’s management team invites current shareholders, potential investors, brokers, analysts and interested parties to visit booth 618 at the Vancouver Convention Centre West and booth 700 at Canada Place to discuss the upcoming 2017 drilling program for its flagship Las Minas property and planned maiden NI 43-101 resource estimate. The company will be displaying high-grade diamond drill hole LM-14- SC- 08, which graded 3.57 g/t Au Eq over 99.0 metres, including 24.11 g/t Au Eq over 9.60 metres.

Southern Silver Intersects 14.8m Grading 39.4g/t Ag, 0.1% Pb, and 10.2% Zn (410g/t AgEq; 11.6% ZnEq) at Cerro Las Minitas; Second Drill Mobilized to Property

http://www.stockhouse.com/news/press-releases/2017/01/19/southern-silver-intersects-14-8m-grading-39-4g-t-ag-0-1-pb-and-10-2-zn-410g-t

VANCOUVER, BRITISH COLUMBIA–(Marketwired – Jan. 19, 2017) – Southern Silver Exploration Corp. (TSX VENTURE:SSV)(FRANKFURT:SEG1)(SSE:SSVCL)(OTCQB:SSVFF) (“Southern Silver”) reported today assay results from the Fall 2016 core drilling on the Cerro Las Minitas project, Durango State, Mexico which identified a thick interval of semi-massive and massive sulphide mineralization in drill hole 16CLM-091. Highlights from 16CLM-091 include:

  • a 15.1m down hole interval (14.8m est. True Thickness) averaging 39.4g/t Ag, 0.1% Pb and 10.2% Zn (410.7g/t AgEq; 11.6% ZnEq) including a higher grade 4.8m interval (4.7m est. TT) averaging 38.7g/t Ag, 0.12% Cu, 0.1% Pb and 23.2% Zn (877g/t AgEq; 24.8% ZnEq)

Mineralization in drill hole 16CLM-091 occurs in skarn near the margin of the Central Intrusion within the Blind Shoulder target and appears to confirm the flattening of the mineralized zone in this part of the deposit. Significantly, the mineralization in 16CLM-091 contains some of the highest grade zinc intercepts drilled on the project to date by Southern Silver.

 

San Marco Discovers Copper, Gold, Moly Porphyry System

http://www.stockhouse.com/news/press-releases/2017/01/19/san-marco-discovers-copper-gold-moly-porphyry-system

VANCOUVER, BRITISH COLUMBIA–(Marketwired – Jan. 19, 2017) – San Marco Resources Inc. (TSX VENTURE:SMN) (“San Marco” or the “Company”) announces updated exploration results from the Company’s generative exploration program in Sonora state, Mexico.

Several targets have been evaluated using the GlobeTrotters /San Marco Partnership database resulting in the identification of alteration patterns ranging from porphyry to high sulphidation systems.

Of particular interest are the results of geologic traverses, prospecting and rock chip sampling on Target #1068, which has identified a nest of previously unmapped porphyritic intrusions along the northeastern contact of a much larger batholith. Preliminary geologic mapping indicates a large, zoned alteration system with a potassic (biotite-magnetite) altered core and a large phyllic (quartz-sericite) altered envelope.

 

Endeavour Silver Updates Reserves and Resources for Operating Mines

http://www.marketwired.com/press-release/endeavour-silver-updates-reserves-and-resources-for-operating-mines-nyse-exk-2189537.htm

VANCOUVER, BC–(Marketwired – January 19, 2017) – Endeavour Silver Corp. (TSX: EDR) (NYSE: EXK) reports updated NI 43-101 silver and gold reserve and resource estimates for its three producing mines in Mexico: the Guanaceví mine in Durango State and the Bolañitos and El Cubo mines in Guanajuato State, as of December 31, 2016, and restates the 2015 silver and gold resource estimates for its exploration projects. Updated mineral reserve and resource estimates for Endeavour’s Terronera and El Compas properties will be published in conjunction with their respective economic studies in March, 2017.

Proven and probable silver reserves decreased 12% in 2016 compared to 2015, reflecting mining depletion and reduction in mine development capital investments at the three mines last year due to low metal prices early in the year. Measured and indicated silver resources decreased 2% and inferred silver resources declined 18% due to reduced exploration spending at the operations and dropping the Arroyo Seco project. Exploration programs and budgets were focused on the advancement of the Terronera project, where mineral resources are expected to increase compared to 2015. An initial mineral resource estimate is also being prepared for El Compas in an upcoming preliminary economic assessment.

Bradford Cooke, CEO of Endeavour, stated, “The dip in reserves and resources at our three operating mines was a result of our reduced capital and exploration spending last year. Now that metal prices are recovering, we have resumed our investments to find and develop new reserves and resources. Our exploration efforts at the development projects last year were successful in identifying new mineralization, so we anticipate Terronera and El Compas should add to our total resources to be released in March.”

Almaden Drills Further New High Grade Mineralisation Within and Outside Amended PEA Pit, Hits 105.00 Meters of 1.20 g/t Gold, 87.1 g/t Silver and 38.60 Meters of 1.08 g/t Gold and 106.2 g/t Silver

http://www.stockhouse.com/news/press-releases/2017/01/18/almaden-drills-further-new-high-grade-mineralisation-within-and-outside-amended

ANCOUVER, BC–(Marketwired – January 18, 2017) – Almaden Minerals Ltd. (“Almaden” or “the Company”) (TSX: AMM) (NYSE MKT: AAU) is pleased to announce further assay results from Almaden’s ongoing exploration and development program at the Company’s Tuligtic project, Mexico. Results reported today are from drill holes TU-16-482 to 486, 488, 490 and 492 drilled on sections 10+575, 700, 725 and 750 East. The holes intersected significant mineralisation and veining inside or immediately outside of the Amended PEA pit including the previously defined subvertical Ixtaca North vein zone, as well as potential new zones of veining. Highlights from these drillholes include the following intercepts:

Hole TU-16-482  SECTION 10+700 EAST Az. 330, Dip -20
1.00 meter @ 2.23 g/t Au and 119.5 g/t Ag Ixtaca North Zone?
Hole TU-16-483  SECTION 10+575 EAST Az. 340, Dip -50
8.00 meters @ 1.12 g/t Au and 51.6 g/t Ag Ixtaca North Zone
34.20 meters @ 1.11 g/t Au and 72.5 g/t Ag Ixtaca North Zone
Hole TU-16-484  SECTION 10+725 EAST Az. 330, Dip -30
96.00 meters @ 0.34 g/t Au and 41.5 g/t Ag Ixtaca North Zone?
Including 5.50 meters @ 0.78 g/t Au and 144.0 g/t Ag Ixtaca North Zone?
Hole TU-16-485  SECTION 10+575 EAST Az. 340, Dip -70
38.60 meters @ 1.08 g/t Au and 106.2 g/t Ag Ixtaca North Zone
Including 7.00 meters @ 2.20 g/t Au and 253.3 g/t Ag Ixtaca North Zone
32.60 meters @ 1.39 g/t Au and 44.1 g/t Ag Ixtaca North Zone?
Including 7.50 meters @ 3.26 g/t Au and 59.6 g/t Ag Ixtaca North Zone?
Hole TU-16-486  SECTION 10+725 EAST Az. 330, Dip -70
105.00 meters @ 1.20 g/t Au and 87.1 g/t Ag Ixtaca North Zone
Including 5.00 meters @ 1.89 g/t Au and 382.2 g/t Ag Ixtaca North Zone
And 10.50 meters @ 4.70 g/t Au and 132.3 g/t Ag Ixtaca North Zone
Hole TU-16-488  SECTION 10+725 EAST Az. 330, Dip -85
40.00 meters @ 0.49 g/t Au and 79.0 g/t Ag Ixtaca North Zone?
Including 3.00 meters @ 2.24 g/t Au and 326.5 g/t Ag Ixtaca North Zone?
Hole TU-16-490  SECTION 10+725 EAST Az. 150, Dip -85
6.00 meters @ 0.50 g/t Au and 365.7 g/t Ag New Vein Zone?
Including 2.00 meters @ 1.04 g/t Au and 898.0 g/t Ag Ixtaca North Zone?
Hole TU-16-492  SECTION 10+750 EAST Az. 330, Dip -30
3.00 meters @ 0.19 g/t Au and 132.0 g/t Ag New Vein Zone?

 

Primero Achieves 2016 Revised Production and Cost Guidance

http://www.stockhouse.com/news/press-releases/2017/01/18/primero-achieves-2016-revised-production-and-cost-guidance

TORONTO, ON–(Marketwired – January 18, 2017) – Primero Mining Corp. (“Primero” or the “Company”) (TSX: P) (NYSE: PPP) today announces its preliminary fourth quarter and full-year 2016 operating results. The Company’s fourth quarter and full-year 2016 financial results will be released on March 15, 2017, and 2017 production guidance will be released in mid-February.