Sierra Metals reports 2016 production results and announces 2017 production and cost guidance

http://www.stockhouse.com/news/press-releases/2017/01/18/sierra-metals-reports-2016-production-results-and-announces-2017-production-and

TORONTO, Jan. 18, 2017 /PRNewswire/ – Sierra Metals Inc. (TSX: SMT) (BVL: SMT) (“Sierra Metals” or “the Company”) is pleased to report fourth quarter 2016 and full year 2016 production results as well as 2017 production and cost guidance.  Production results featured the second highest level of annual and quarterly metal production in the Company’s history. The Company was also pleased to report record annual consolidated throughput for 2016.  The fourth quarter also featured the second highest level of quarterly throughput at its Yauricocha and Bolivar Mines and the second highest quarter of metal production in the history of the Yauricocha Mine.

Results are from Sierra Metals’ three underground mines in Latin America: The Yauricocha polymetallic Mine in Peru and the Bolivar Copper mine and Cusi silver Mine in Mexico.

 

Canasil Completes First Drill Hole, Begins Second Hole at the La Esperanza Project in Durango and Zacatecas States, Mexico

http://www.stockhouse.com/news/press-releases/2017/01/18/canasil-completes-first-drill-hole-begins-second-hole-at-the-la-esperanza

VANCOUVER, Jan. 18, 2017 /CNW/ – Canasil Resources Inc. (TSX-V: CLZ, DB Frankfurt: 3CC, “Canasil”) announces that the Company has completed the first hole, ES-16-12, of the 2016-17 core drilling program at the La Esperanza silver-lead-zinc project in Durango and Zacatecas States, Mexico. The hole was drilled to a downhole depth of 394.5 metres. This hole intersected an extended interval from 345 metres to 391 metres down hole, carrying banded quartz veins, veinlets and breccias hosted within fractured and brecciated volcanic rocks. Base metal sulphides including sphalerite, galena, and chalcopyrite have been noted. The core is being logged and prepared for assaying to determine base metal and possible silver content.

A second drill hole, ES-17-13, is now in progress. It is a step-out, collared 90 metres northwest of ES-16-12 along strike, and targeted to intersect the vein structure at a similar depth. The initial 2016-17 drill program is planned for 1,500 to 2,000 metres of core drilling in 4 or 5 drill holes.

 

Mexus adds additional property to its portfolio

https://globenewswire.com/news-release/2017/01/17/906135/0/en/Mexus-adds-additional-property-to-its-portfolio.html

CARSON CITY, Nev., Jan. 17, 2017 (GLOBE NEWSWIRE) — Mexus Gold US (OTCQB:MXSG) (“Mexus” or the “Company”) announced that after careful deliberation the Company has determined to acquire the concessions comprising the San Felix Project.  Mexus has entered into land surface use agreements and concession purchase agreements for various land parcels which expired under the prior owner’s failure to pay. The agreements require a cash payment with term payments to the respective owners.  The Company also announces the execution of an agreement with MarMar Holdings Inc. whereby each company owns a 50% share of the San Felix Project and designates MarMar Holdings Inc. as the operator of the daily production activities.

Americas Silver Corporation Announces Trading on NYSE MKT to Commence January 19, 2017

http://www.stockhouse.com/news/press-releases/2017/01/17/americas-silver-corporation-announces-trading-on-nyse-mkt-to-commence-january

mericas Silver Corporation (TSX:USA)(OTCQX:USAPD) (the “Company”) is pleased to announce that its common shares have been approved for listing on the NYSE MKT stock exchange in New York (the “NYSE MKT”). Trading is expected to commence at the opening of the market on January 19, 2017, under the ticker symbol “USAS”. The Company’s common shares will continue to trade on the OTCQX until the close of the market on January 18, 2017.

“Listing on the NYSE MKT is an important milestone for Americas Silver which will create greater exposure among institutional and retail investors in the U.S. and internationally at this important time of growth for the Company,” said Darren Blasutti, President and CEO.

 

First Majestic Produces a Record 18.7M Silver Eqv. Oz in 2016 (4.4M Silver Eqv. Oz in Q4); Announces 2017 Production Outlook and Cost Guidance

http://www.stockhouse.com/news/press-releases/2017/01/17/first-majestic-produces-a-record-18-7m-silver-eqv-oz-in-2016-4-4m-silver-eqv-oz

VANCOUVER, BRITISH COLUMBIA–(Marketwired – Jan. 17, 2017) – First Majestic Silver Corp. (“First Majestic” or the “Company”) (FRANKFURT:FMV)(TSX:FR)(NYSE:AG)(BVM:AG) is pleased to announce the Company’s fourth quarter and full year 2016 production results, as well as production and cost guidance for 2017. Production costs are scheduled to be released on February 22, 2017 with the Company’s full-year and fourth quarter 2016 financial results.

Total production in 2016 reached a new record of 18.7 million equivalent ounces of silver, representing a 16% increase over 2015, consisting of 11.9 million ounces of silver, 62,436 ounces of gold, 33.2 million pounds of lead and 10.6 million pounds of zinc.

Production in the fourth quarter of 2016 totaled 4.4 million equivalent ounces of silver consisting of 2.8 million ounces of silver, 14,743 ounces of gold, 7.7 million pounds of lead and 1.2 million pounds of zinc.

As of December 31, 2016, the Company held US$129.0 million of cash in its treasury.

 

Silver Bull Provides 2016 Year-End Review and Outlines Work Program for 2017

http://www.stockhouse.com/news/press-releases/2017/01/17/silver-bull-provides-2016-year-end-review-and-outlines-work-program-for-2017

VANCOUVER, BRITISH COLUMBIA–(Marketwired – Jan. 17, 2017) – Silver Bull Resources, Inc. (OTCQB:SVBL)(TSX:SVB) (“Silver Bull”) is pleased to provide a 2016 corporate end of year review and outline the plan for 2017 going forward.

During 2016 the company completed a 590 line kilometer airborne magnetic geophysics survey over the main deposit at Sierra Mojada. This work identified a number of deep structures that are coincident with known high grade historical silver and zinc mines in the area. Strong copper anomalies are also coincident with these structures and are thought to represent hotter fluids coming up from depth.

In addition, several drill holes previously drilled in the area outlined by the geophysics survey intercepted structurally controlled sulphide mineralization including, drill hole “B11144”, which intercepted 8.45 meters at 17% zinc, 5.45% lead, and 60g/t silver starting at 193 meters. Underground mapping and sampling in the same area, identified another zone of structurally controlled sulphide mineralization with channel samples returning grades up to 690g/t silver, 15.25% zinc, 4.8% lead, and 1% copper.

 

Avino Announces Fourth Quarter and Full Year 2016 Production Results from its Avino Property

http://www.stockhouse.com/news/press-releases/2017/01/17/avino-announces-fourth-quarter-and-full-year-2016-production-results-from-its

VANCOUVER, Jan. 17, 2017 /CNW/ – Avino Silver & Gold Mines Ltd. (ASM: TSX.V, ASM: NYSE – MKT, GV6: FSE, “Avino” or “the Company”) is pleased to report its fourth quarter 2016 and full year 2016 production results from its Avino property near Durango, Mexico.

Consolidated Production Highlights for 2016 (Compared to 2015)

  • Silver equivalent production decreased 11% to 2,679,334  oz*
  • Silver production decreased 1% to 1,612,060 oz
  • Gold production increased 1% to 7,119 oz
  • Copper production decreased 11% to 4,206,585 lbs

Consolidated Production Highlights for Fourth Quarter, 2016 (Compared to Fourth Quarter, 2015)

  • Silver equivalent production decreased 7% to 707,775 oz*
  • Silver production increased 2% to 419,355 oz
  • Gold production increased 63% to 2,581 oz
  • Copper production decreased 41% to 755,645 lbs

*In 2016, AgEq was calculated using metals prices of $17.10 oz Ag, $1,248 oz Au and $2.21 lb Cu. In 2015, AgEq was calculated using $16 oz Ag, $1,150 oz Au and $3.00 lb Cu

“I would like to thank our teams in Mexico and Canada for delivering another solid year of consistent production. Despite the challenges faced during the second quarter, our production was in line with our internal projections, and we expect similar results for 2017. The year was highlighted by the declaration of commercial production at the Avino Mine, as well as the publication of new resource estimates for our operations in Mexico and Canada.  We are planning on issuing a news release in the coming days outlining our Mexico expansion plans as well as an agenda for reopening the Bralorne Mine.”

 

Timmins Gold Corp. Announces Greg Mccunn as New CEO

http://www.timminsgold.com/news/2017/index.php?&content_id=383

Vancouver, BC – Timmins Gold Corp. (TSX:TMM, NYSE MKT:TGD) (“Timmins” or the “Company”) is pleased to announce that Greg McCunn will succeed Mark Backens as the Company’s new Chief Executive Officer (“CEO”) effective February 1, 2017.  In addition to the role of CEO, Mr. McCunn will also serve as a director on the Company’s board of directors.

Mr. McCunn is a mining executive with 25 years of executive and management experience in finance, operations, project engineering, project construction and corporate development. Most recently, he was Chief Financial Officer (“CFO”) of Asanko Gold, where over his six-year tenure he oversaw the transition of the company from exploration and development to a mid-tier gold producer. Prior to Asanko, Mr. McCunn spent four years as the CFO of Farallon Mining during which time the company financed, constructed and operated the G-9 mine in Guerrero, Mexico which is proximal to Timmins’ Ana Paula project.  Farallon was acquired by Nyrstar in early 2011.  Prior to his roles as a finance executive, Greg’s background includes technical, operational and corporate development roles with Teck, Placer Dome and junior mining companies in Canada and Australia. He is a Professional Engineer and holds a Master’s degree in Business Administration as well as a Bachelor of Applied Science in Metallurgical Engineering.

Evrim’s partner First Majestic drills 11.4 grams per tonne gold over 18.0 metres at Ermitaño

http://www.newsfilecorp.com/release/24539/Evrims-partner-First-Majestic-drills-11.4-grams-per-tonne-gold-over-18.0-metres-at-Ermitao#.WH44DhvhDIU

Vancouver, British Columbia–(Newsfile Corp. – January 17, 2017) – Evrim Resources Corp. (TSXV: EVM) (“Evrim” or the “Company”) is pleased to announce initial drill results from its Ermitaño gold project in Sonora, Mexico. Exploration partner First Majestic Silver Corp. (TSX: FR) (NYSE: AG) (“First Majestic”) have received assay results from the first four holes of a ten hole diamond drill program at the Ermitaño West prospect totaling 947 metres. The Ermitaño West prospect is located approximately 3.5 kilometres southeast of First Majestic’s operating Santa Elena gold-silver mine.

Ermitaño West Drilling Highlights

Drill Hole EW16-04

  • 18.0 metres grading 11.4 grams per tonne (“g/t”) gold and 86 g/t silver including 3.3 metres grading 34.6 g/t gold and 242 g/t silver

Drill Hole EW16-03

  • 9.6 metres grading 1.8 g/t gold and 24 g/t silver including 3.1 metres grading 4.9 g/t gold and 36 g/t silver

Drill Hole EW16-02

  • 13.2 metres grading 1.1 g/t gold and 29 g/t silver including 3.0 metres grading 2.9 g/t gold and 72 g/t silver

Drill Hole EW 16-01

  • 8.8 metres grading 0.8 g/t gold and 9 g/t silver

True widths are estimated to be 70-90% of reported intervals.

Aura Silver Announces the First Tranche Closing of Non-Brokered Private Placement

http://www.stockhouse.com/news/press-releases/2017/01/16/aura-silver-announces-the-first-tranche-closing-of-non-brokered-private

OTTAWA, ONTARIO–(Marketwired – Jan. 16, 2017) – Aura Silver Resources Inc. (TSX VENTURE:AUU) (“Aura Silver” or the “Company”) announces that it has closed the first tranche of its non-brokered private placement of up to $500,000 (the “Offering”) announced on November 29, 2016. Aggregate proceeds of approximately $209,000 were raised on this first tranche for 5,977,737 units issued at $0.035 per unit.

Each unit consists of one common share of the Company and one common share purchase warrant. Each warrant entitles the holder to purchase one common share of the Company at a price of $0.05 per share for a period of 36 months following the date of issuance (“Warrants”).