The Mining and Exploration News in Mexico: Highlights on the First Week of November, 2019.

Mn oxide-calcite fault vein-bx

By Miguel A Heredia

During the forty-five week of the year (November 4th to November 10th, 2019), at least 37 press releases were announced by companies working in Mexico, with nine communicating production and financial results, eight disclosing deals and corporate issues, six announcing financial rounds, five informing on exploration results, four reporting on resources and development of their projects, three commenting on Mexican issues, and two discussing issues on social responsibility.  ON MEXICO ISSUES, according to the Director of Mines of Zacatecas, there are five new mine projects in the state to be developed in 2020. Newmont-Goldcorp restated the dialogue process with the Cedros community on its Peñasquito mines in Zacatecas. Local communities and small local merchants expressed their support for the continuity of the Peñasquito mine. ON EXPLORATION, In Sonora, Silver Viper mobilized an exploration crew to its Virginia project to commence a drilling program at the El Rubi target area, and Oceanus reported underground and surface sampling results from its El Tigre project. In Sinaloa, Vizsla reported underground sampling from its Panuco-Copala project.  In Zacatecas, Advance Gold outlined a km long by 400-500m wide chargeability anomaly at its Tabasqueña project. In Jalisco, GoGold released drill results from 4 holes collared at its Los Ricos project.  ON MINING, Alio Gold, Argonaut, Coeur, Endeavour, Excellon, First Majestic, Hecla, Leagold, and Pan American presented Q3 2019 production and financial results from its Mexican operations.  ON FINANCING, Discovery Metals closed a non-brokered private placement for gross proceeds of $19M (Cordero project, Chihuahua). Goldplay closed a brokered private placement for $3M (San Marcial project, Sinaloa).Solaris Copper announced its intention to undertake a non-brokered private placement to raise gross proceeds of up to  CAD $5.5M (La Verde, Michoacan). Advance Gold closed the first tranche of a non-brokered private placement for gross proceeds of $113K (Tabasqueña project, Zacatecas). Orex announced that intends to undertake a non-brokered private placement to raise gross proceeds of up to $1M (Sandra-Escobar project, Durango). San Marco revised its previously announced non-brokered private placement and now intends to rise gross proceeds for up to CAD $376.6K. It also closed subscription books for unit and flow through shares private placement for gross proceeds of CAD $40K (Chunibas project, Sonora). ON RESOURCES AND DEVELOPMENT, Capstone announced high grade Cu-Ag results from 103 infill and step-out drill holes at its Cozamin mine in Zacatecas. Vizsla closed its option agreement to acquire 100% interest of Panuco-Copala project in Sinaloa. Torex extended mineralization 150m below current reserves at its El Limon Deep deposit in Guerrero. Mexus announced that its Merrill Crowe Au recover plant is complete and operational at its Santa Elena mine in Sonora. Mag Silver informed about the activities carried out at its Juanicipio project mine development in Zacatecas during Q3, 2019. ON DEALS AND CORPORATE ISSUES, Colibri received TSX approval for its acquisition of Yaque Minerals (Mezquite and Jackie projects, Sonora). Vizsla closed its option agreement to acquire 100% interest in Panuco-Copala property in Sinaloa. Great Panther announced the appointment of its VP Exploration and VP People & Culture (Topia mine, Durango). Solaris Copper announced management changes of its team (La Verde project, Michoacan). Starcore presented results from its annual general meeting of shareholders (San Martin mine, Queretaro). Mako Mining provided a corporate update and status of its Mexican operation. Compañía Minera Cuzcatlán, a subsidiary of Fortuna Silver Mines revealed that it is analyzing to invest in a new plant in Mexico (San Jose mine, Oaxaca). Minera Autlán announced its intention to raise its commitment to gold (Lluvia de Oro-La Jojoba, Sonora). ON SOCIAL RESPONSIBILITY, Agnico Eagle participated in the reconstruction of the drinking water system at Yepachi, Chihuahua, with a total investment of MXP $4M. Argonaut participated in multiple social programs related to their Mexican operations.

ON MEXICO ISSUES

  • The Secretariat of Economy in Zacatecas, through its Director of Mines, revealed that new five mines will be developed in the state in 2020, standing out Juanicipio in Fresnillo, Camino Rojo in Mazapil , and San Nicolas in Villa Garcia municipalities. Zacatecas is one of the most prolific areas for mining in the country; however, he is aware of the social problems faced by some of the mining companies which operate in the state. He informed that the local government seeks to generate the conditions for mining companies to invest safely in new projects.
  • Newmont-Goldcorp Corporation, restated the dialogue process with the community of Cedros, municipality of Mazapil on Peñasquito mine. A new agreement was signed for the community delegates, with a strong commitment of both parties, by the community not to block again the mine and from the company to attend on time the concerns and proposal from the Ejido.
  • Local communities and small local merchants, expressed their support for the continuity of Peñasquito mine. The communities of Cedros, El Rosario, La Pardita, Sábana Grande, Tanquecillos, Tecolotes, Mazapil and El Trigo said they are in favor of the Peñasquito Mine, stating that it has provided benefits to their families. At a press conference, representatives of the aforementioned communities reported that thanks to the company they have work, so they asked the state government to support them and that, through the dialogue avoids a new block. They affirmed that they are against the blockades and the definitive closure of the mine, since this one supports around 25 communities. They said the mining company has provided a source of work to the people of the communities and do not want it to disappear.

ON EXPLORATION

  • Silver Viper Minerals Corp., mobilized an exploration crew to its Virginia project in Sonora to commence a phase II drilling program at El Rubi target area, where previous drilling carried out in 2018 intersected 3.18 g/t Au and 228 g/t Ag (6.42 g/t AuEq) over 6m of true width. Phase II will test the extension of this structure along trend and at depth on 50m sections with the aim of generating enough information for maiden resource estimation at El Rubi.
  • Oceanus Resources Corporation, presented underground and surface sampling results from the Caleigh, Canon Combination and Protectora Veins at its El Tigre project in Sonora. In the Caleigh Vein, underground channel sample ETU-1007 returned 1,896 g/t Ag and 6.4 g/t Au (2,376 g/t AgEq) over a true width of 0.50m, and ETU-1006 returned 1,971 g/t Ag and 4.64 g/t Au (2,318 g/t AgEq) over a true width of 0.50m. In the Canon Combination Vein, underground channel sample ETU-1012 returned 1,794 g/t Ag and 0.25 g/t Au (1,813 g/t AgEq) over a true width of 0.50m. In the Protectora Vein, underground channel sample returned 378 g/t Ag and 2.01 g/t Au (529 g/t AgEq) over a true width of 0.50m. Surface samples collected on this vein reported 374 g/t Ag and 3.32 g/t Au over 0.7m wide; 192 g/t Ag and 0.57 g/t Au (235 g/t AgEq) over 0.5m wide; and 169 g/t Ag and 1.0 g/t Au (244 g/t AgEq) over 0.50m wide. “The results from the mapping and sampling of the underground workings and at surface present a series of high priority drill targets over a 2 kilometer strike length north of the old El Tigre Mine, which we intend to drill.”
  • Vizsla Resources Corp., reported encouraging underground sampling results from its Panuco-Copala project in Sinaloa. Highlights results from the underground sampling at the San Carlos mine are 5.65 g/t Au and 612 g/t Ag (1,120 g/t AgEq) over  6m on development level 4, including 10.5 g/t Au and 1,120 g/t Ag (1,960 g/t AgEq) over 3m; 2.55 g/t Au and 517 g/t Ag (721 g/t AgEq) over 4.5m on development level 5, including 3.51 g/t Au and 721 g/t Ag (1.002 g/t AgEq) over 3m; and 2.12 g/t Au and 298 g/t Ag (468 g/t AgEq) over 5.5m on development level 4, including 3.76 g/t Au and 591 g/t Ag (892 g/t AgEq) over 1.5m. These results are part of a mapping and sampling program to better understand mineralization at Panuco project.
  • Advance Gold Corp., completed a second phase of a 3D-IP survey and has outlined a N-S trending chargeability anomaly of 1km long by 400-500m wide on its Tabasquena project in Zacatecas. It remains open in both directions as well as at depth. A number of boreholes are now planned to intersect this anomaly.
  • GoGold Resources Inc., released drill results from 4 new holes collared at its Los Ricos project in Jalisco. Three of the 4 holes were drilled at El Troce area and significant intersections were encountered in hole LRGG-19-059 with 0.94 g/t Au and 134 g/t Ag (2.72 g/t AuEq) over 11m, including 1.95 g/t Au and 277 g/t Ag (5.65 g/t AuEq) over 3.5m; and hole LRGG-19-60 with 0.32 g/t Au and 66 g/t Ag (1.19 g/t AuEq) over 16m, including 83 g/t Au and 162 g/t Ag (2.98 g/t AuEq) over 3m. Hole LRGG-19-57 was drilled at the Main area and intersected 0.91 g/t Au and 131 g/t Ag (2.65 g/t AuEq) over 14.1m, including 2.14 g/t Au and 253 g/t Ag (5.50 g/t AuEq) over 5.3m. GoGold completed in Mid-October 2019, a phase 1 drilling program which consisted of 10,000m, and has already started a second phase of drilling, adding a third rig  machine to the program.

ON MINING

  • Alio Gold Inc., continued with processing of low grade stock pile at its san Francisco mine in Sonora, resulting in the placement of 12.8K Oz Au on the pad. The company announced that the low grade stock pile will be exhausted in Q4, 2019, after which crushing will cease, and operations will solely focus on recovery of the residual inventory ounces.
  • Argonaut Gold Inc., presented Q3, 2019 production and financial results from its Mexican operations. The company produced 44.7K Oz AuEq at a cash cost of USD $901 per Oz Au produced and sold 45.6K Oz Au at an AISC of USD $1,134 per Oz Au sold. It also reported revenue for USD $66.8, cash flow from operating activities before changes in operating working capital of USD $17.2M, net income of USD $4.9M, adjusted net income of USD $6.5M, and a net cash increase of USD $11.7M. Argonaut also reported mine by mine production results for the period Q3, 2019. At El Castillo Complex in Durango, it milled 4.8M tonnes of 0.35 g/t Au to produced 30.3K Oz AuEq. At El Castillo, 2.4M tonnes of 0.39 g/t Au were milled to produce 14.3K Oz Au and 23.3K Oz Ag. This mine sold 14.6K Oz Au and 16.3K Oz Ag in this quarterly period, at a cash cost of $1,038 per Oz Au sold. At San Agustin, 2.4M tonnes were milled with a grade of 0.32 g/t Au to produce 15.2K Oz Au and 36.9K Oz Ag. This mine sold 15.7K Oz Au and 15K Oz Ag in this quarterly period, at a cash cost of $848 per Oz Au sold. At La Colorada, Sonora, the company milled 1.45M tonnes of 0.6 g/t Au, to produced 14K Oz Au and 33.6K Oz Ag. La Colorada sold 13.8K Oz Au and 34K Oz Ag at a cash cost of $800 per Oz Au sold.
  • Coeur Mining Inc., announced Q3, 2019 production and financial results from its Palmarejo mine in Chihuahua. It milled 442,464 tons of 2.8 g/t Au and 152 g/t Ag to, with a metallurgical recoveries of 81.7% and 79.6% respectively, to produce 31.8K Oz Au and 1.72M Oz Ag. Adjusted costs applicable to sales were USD $660 per Oz Au and USD $8.95 per Oz Ag. Coeur reported cash flow from operating activities of USD $36.3M and total capital expenditures of USD $7.8M for a total free cash flow of USD $28.5M.
  • Endeavour Silver Corp., reported consolidated Q3, 2019 financial and production results from its four Mexican operations: Guanacevi mine in Durango, Bolañitos and El Cubo in Guanajuato, and El Compas in Zacatecas. The company processed 234, 196 tonnes to produce 948.5K Oz Ag and 9.7K Oz Au (1.72M Oz AgEq), at a cash cost of $11.51 per Oz Ag produced and AISC of $21.53.
  • Excellon Resources Inc., reported Q3, 2019 production and financial results from its Platosa mine in Durango. The company mined 18,167 tonnes and processed 17,235 tonnes with grades of 512 g/t Ag, 4.4% Pb, and 6% Zn, to produce 257.5K Oz Ag, 1.3M Lb Pb, and 1.65M Lb Zn (427.1K Oz AgEq), at a cash cost per Oz Ag payable of $18.18 and AISC net of by-products per Oz Ag payable of $28.46. Metallurgical recoveries were 87.2%, 77.7%, and 76.5% for Ag, Pb, and Zn respectively. Excellon reported revenues for $5.9M, a net loss of $2.9M, and a net working capital of $$9.0M.
  • First Majestic Silver Corp., presented Q3 production results from its Mexican operations. The company reported revenues for $97M, a net loss of $8.6M, operating cash flow before movements in working capital and taxes of $34.6M, cash and cash equivalent of $118.6M, and a working capital of $149.2M. The below table shows the mine by mine production results:

  • Hecla Mining Company, announced Q3 production and financial results from its San Sebastian mine in Durango. It produced 541.6K Oz Ag and 3.7K Oz Au at an AISC of $$7.21 per Oz Ag.
  • Leagold Mining Corporation, produced from its Los Filos mine in Guerrero, 40,922 Oz Au at an AISC of $1,001 per Oz Au produced, and sold 41,343 Oz Au during Q3, 2019, with associated revenue of $58.6M.
  • Pan America Silver Corp., reported Q3, 2019 production and financial results from its la Colorada, Zacatecas and Dolores, Chihuahua mines. At La Colorada, the company produced 2.1M Oz Ag and 1,200 Oz Au, at a cash cost of $2.82 per Oz Ag and an AISC of $4.03 per Oz Ag. At Dolores, it produced 1.5M Oz Ag and 33.1K Oz Au, at an AISC of $7.45 per Oz.

ON FINANCING

  • Discovery Metals Corp., closed a non-brokered private placement for gross proceeds of $19M, including $5M investment from Eric Sprott, which represents 19.9% of the interest of Discovery on a non-diluted basis. Proceeds will be used to continue the exploration programs at its exploration properties (Cordero project, Chihuahua, Puerto Rico project, Coahuila).
  • Goldplay Exploration Ltd., closed a brokered private placement financing of $3M. Gross proceeds will be used to continue resource expansion drilling including underground and surface exploration on its san Marcial project in Sinaloa.
  • Solaris Copper Inc., announced its intention to undertake a non-brokered private placement to raise gross proceeds of up to CAD $5.5M. Gross proceeds will be used to advance permitting, exploration, and drilling activities at their projects. (La Verde project, Michoacan).
  • Advance Gold Corp., closed the first tranche of a non-brokered private placement for gross proceeds of $113K. The company will use the gross proceeds to advance its Tabasqueña project in Zacatecas.
  • Orex Minerals Inc., announced its intention to undertake a non-brokered private placement to raise gross proceeds of up to $1M. Orex will use the net proceeds to maintain its 40% share of the Sandra Escobar project in Durango and fund its 40% share of the upcoming work program, and to make the necessary payments under its option to acquire 100% of the San Luis del Cordero project, Durango, and for general corporate and capital purposes.
  • San Marco Resources Inc., revised its previously announced non-brokered private placement and now intends to rise gross proceeds for up to CAD $376.6K. It also closed subscription books for unit and flow through shares private placement for gross proceeds of CAD $40K (Chunibas project, Sonora).

ON RESOURCES AND DEVELOPMENT

  •  Capstone Mining Corp., announced high grade Cu-Ag results from 103 infill and step-out drill holes from 200 hole program at its Cozamin mine in Zacatecas. Aim of this program is more than double the current reserve base. Significant drill intersection were encountered in hole CG-19-U498 with 5.02% Cu, 0.4% Zn, and 72 g/t Ag over a true width of 12.3m, including 9.02% Cu, 0.7% Zn, and 127 g/t Ag; in hole CG-18-S381 with 7.27% Cu, 0.3% Zn, and 220 g/t Ag over a true width of 5.1m; in hole CG-18-S372 with 5.53% Cu, 0.2% Zn, and 117 g/t Ag over a true width of 20.1m, including 11.32% Cu, 0.3% Zn, and 242 g/t Ag over a true width of 6.4m.
  • Torex Gold Resources Inc., reported drilling results from its 2019 exploration program at its El Limon-Guajes complex deposit in Guerrero. The drilling program has been successful in extending mineralization 150m below current reserves at its El Limon Deep deposit. Significant mineralization was encountered in hole LDUG-039 with 15.6 g/t Au over 38m; in hole LDUG-049 with 20.9 g/t Au over 12m, and in hole LDUG-056 with 15.7 g/t Au over 16.8m. El Limon Deep deposit remains open down dip and along strike.
  • Mexus Gold US, announced that its Merrill Crowe Au recovery plant at its Santa Elena mine in Sonora is complete and operational. “The plant is capable of handling Mexus’3000 ton a week mining operation and will allow for future expansion as well”.
  • Mag Silver Corp., informed about the activities carried out at its Juanicipio project mine development in Zacatecas during Q3, 2019. The company reported that “earthmoving and foundation preparation commenced for the construction of the 4,000 tpd beneficiation plant. Mill fabrication is progressing on schedule, and both the SAG and ball mills are expected to be shipped to site early 2020. Flotation cells, processing tanks and minor process equipment pieces are starting to arrive on site. Thickener tanks and drive and rakes fabrication are well advanced. Underground development has now reached 23Km of development and continues. According to the operator, Fresnillo plc, permitting for the tailings impoundments should be completed in the fourth quarter of this year and mill construction is on track for commissioning by late 2020”.

 ON DEALS AND CORPORATE ISSUES

  • Colibri Resources Corporation, received TSX approval for its acquisition of Yaque Minerals by a CAD$ 1M payment by way of a 5-years convertible debenture bearing 2.5% annual interest and carries a $0.20 per share conversion privilege. The Yaque´s acquisition includes two projects in Sonora: El Mezquite and Jackie, located less than 10Km east of the Nicho deposit owned by Minera Alamos, which is expected to start production in 2020, with initial production of 25K-30K Oz Au per year, with a mine life of more than 6 years. El Mezquite is a 2km by 1km N-S trending hydrothermal alteration zone on silicified feldspar porphyry, with a potential Au target area of at least 600m by 300m. A 3D-IP survey was carried out on this anomalous area which resulted in the identification of chargeability and resistivity anomalies underlying the surface area of potential. 321 grab samples have been collected of which 13% returned Au values oscillating from 0.1 to 3.41 g/t Au. Jackie is located 2km south of the El Mezquite but it has seen very little exploration work to date. Some prospecting work is planned for 2020.
  • Vizsla Resources Corp., closed its previously announced option agreement on November 5, to acquire 100% interest in Panuco-Copala property in Sinaloa. Vizsla confirmed that it has previously loaned USD $700K to Canam in order to satisfy the initial payment due under the terms of the options.
  • Great Panther Mines Limited, announced the appointment of its VP Exploration and VP People & Culture (Topia mine, Durango).
  • Solaris Copper Inc., announced management changes of its team, appointed its CEO, CFO, VP Corporate Affairs and Corporate Secretary, and a new member to its Board of Directors (La Verde project, Michoacan).
  • Starcore International Mines Ltd., reported results from its annual general meeting of shareholders (San Martin mine, Queretaro).
  • Mako Mining Corp., provided a corporate update and status of its Mexican operation. At its la Trinidad mine in Sinaloa, Au production is nearing conclusion, with Au sales being used to fund ongoing reclamation and severance costs. Mining and process plant equipment has been moved to USA and the lab equipment will be moved to Nicaragua soon. Mako has reported that has not been successful in receiving any insurance for damages caused by Hurricane Willa at its Trinidad mine in October, 2018. It has filed a lawsuit for over USD $7M against the Insurance Company. Mako also announced that it has reached an agreement with the primary mining contractor on the debt of approximately USD $11.3M. “Despite being ring-fenced from the rest of Mako’s corporate structure, the Company chose to settle with the contractor by making a USD $4M upfront payment and agreeing to make two additional USD $1M payments 12 months and 24 months from signing of the settlement agreement.  As this liability was being accounted for at approximately USD$11.3M, a substantial accounting gain is expected in the next quarterly report.
  • Compañía Minera Cuzcatlán , a subsidiary of Fortuna Silver Mines, analyzes to invest in a new mining plant located 40km from its San Jose mine, Oaxaca. The company asked government support to mediate between the company and the communities, since the new plant will require between USD $200-300M. The decision has to be taken next year, so they need the support of the authorities to reach a social agreement with the communities.
  • Compañía Minera Autlán, A.B .de C.V., announced its intention to raise its commitment to gold. The intention of that business and the integration towards gold was always to reach 20 to 25% of the top line and about 30 to 35% of the operating cash flow (EBITDA). In addition, the company estimates they will close this year with and investment of USD $35M to support other areas of its business, to add USD $45 M in an integrated way (Lluvia de Oro-La Jojoba, Sonora).

ON SOCIAL RESPONSIBILITY

  • Agnico Eagle Mines Limited, participated, along with the municipal presidency of Yepachi, Chihuahua, in the reconstruction of the drinking water system for this community. Yepachi is the second largest community in this area and has years of lag in terms of the supply and quality of drinking water. A total of MXP $4M will be invested, an amount that will be contributed by 50% by the municipal presidency and the other part will be borne by Agnico Eagle, which operates within the territory of the Yepachi Ejido.
  • Argonaut Gold Inc., has participated in several programs with the communities where the company operates. At La Colorada, Sonora, Argonaut signed a health collaborative agreement with the Centro de Rehabilitación Integral Teletón and hosted a cultural event with the Cultural Institute of Sonora. In Durango, participated in collaboration with the local government in an interactive learning pavilion where local attendees and families could know about the company´s mining activities and projects. It also sponsored an international forum on geological and mining heritage organized by the Universidad Autónoma de Baja California Sur, to discuss possible historical tourism and ecotourism in mining communities. Finally, Argonaut hosted students’ interactive workshops in the municipality of Dolores, Hidalgo in the village of san Anton in Guanajuato, Mexico, and hosted a soprano singer and the Latin American quartet at the Mining Cultural Centre of the Mexican chamber of commerce in Mexico City.

Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.

On the picture above, a Mn oxides-calcite fault vein-bx structure from a prospect in Chihuahua, Mexico.  Photo by Miguel A Heredia.

The Mining and Exploration News in Mexico: Highlights on the Fourth Week of October, 2019.

 

barite crystals

By Miguel A Heredia

During the forty-three week of the year (October 21st to October 27th, 2019), at least 42 press releases were announced by companies working in Mexico, with eleven disclosing deals and corporate issues, ten announcing financial rounds, seven commenting on Mexican issues, six informing on exploration results, three communicating production results, three reporting on resources and developments of their projects, and one discussing issues on social responsibility.  ON MEXICO ISSUES, Napoleón Gómez Urrutia, a mining union leader and senator for the Morena party proposed to increase the taxes to mining concessions to levels of 20-30%.  Fernando Alanís, president of the Cámara Minera de México (CAMIMEX), reported that 244 Canadian companies stopped investing in Mexico. At the AIMMGM Mining convention in Acapulco, the CONAGO (Conferencia Nacional de Gobernadores) and the federal government were at disagreement on the use of the Mining Fund. Camimex expects the “Mesa de Minería” (Mining Forum) is installed before year’s end. Newmont-Goldcorp re-started up production at its Peñasquito mine in Zacatecas. ON EXPLORATION, In Baja California Norte, One World Lithium announced the continuation and progress of the phase 3 drilling program at its Salar del Diablo project.   In Sonora, Aloro mobilized crews to sample high grade Au veins on the northwest side of its Los Venados project, and Agnico Eagle provided an exploration update of its Santa Gertrudis project. In Chihuahua, Radius Gold and Pan American Silver commenced the phase 3 drilling program at its Amalia project. In Zacatecas, Galore reported the completion of 1,667.20m of core drilling at its Dos Santos project.  In Jalisco, GoGold reported drill results from six new holes from its Los Ricos project. ON MINING, Agnico Eagle, Fresnillo, and Excellon reported Q3, 2019 production and financial results from their Mexican operations. ON FINANCING, Galore closed a first tranche of a private placement for gross proceeds of CAD $187K and implemented a shares for services agreement on its drill contract (Dos Santos project, Zacatecas). One World Lithium reported that its previously announced non-brokered private placement (Sept 05, 2019), will be replaced by a non-brokered private placement for gross proceeds of $1M (Salar del Diablo project, Baja California Norte).  VVC closed a non-brokered private placement for gross proceeds of CAD $2M (Kaity project in Samalayuca, Chihuahua). Silver Viper closed a private placement financing to raise gross proceeds for $4M (La Virginia project, Sonora). Orla entered into a commitment letter for up to USD $125M project finance facility (Camino Rojo project, Zacatecas). Vista Gold received the third option payment from Prime Mining for the Guadalupe de Los Reyes property in Sinaloa. Newmont-Goldcorp declared a quarterly dividend of $0.14 per share of common stock (Peñasquito mine, Zacatecas). Gold Resource increased 100% its instituted annual dividend from $0.02 to $0.04 per common share (Arista mine, Oaxaca). ON RESOURCES AND DEVELOPMENT, Golden Minerals outlined progress at its Velardeña and Rodeo properties in Durango. Minera Peñoles informed that is to start operations at its Capela mine in Guerrero. Endeavour reported infill drill results from its Parral project in Chihuahua.  ON DEALS AND CORPORATE ISSUES, Alien Metals appointed Novum Securities Ltd as its joint corporate broker with immediate effect (San Celso project, Zacatecas). Defiance Silver appointed a couple of OreQuest consultants as technical advisors to work on its San Acacio project in Zacatecas. Impact granted stock options to directors, officers, and employees (Zacualpan mining district, State of Mexico).   Oroco announced special general meeting of its shareholders to be held on December 19, 2019 (Santo Tomas project, Sinaloa). Vangold announced changes on its board of Directors and appointed its corporate secretary (El Pinguino mine, Guanajuato). Tamino Minerals was invited to list on the Mexican Stock Exchange (El Volcan project, Sonora). Torex responded a recent letter to its shareholders and stakeholders (Limon-Guajes, Guerrero). Sonoro advanced discussions with China-based companies to develop and finance its Cerro Caliche project in Sonora. Magellan entered into an option agreement with Golden Minerals to acquire 100% interest in Santa Maria project in Chihuahua. Santacruz Silver appointed a new director to its Board (Veta Grande, Zacatecas). Ternium received from PROFEPA, the certification as a clean industry (Tecomán plant in Colima).  ON SOCIAL RESPONSIBILITY, In Aconchi, Sonora, the Orquesta La Caridad from Grupo Mexico offered a concert to 250 attendees by 110 children and young people, the first on its Rio Sonora tour. Doctor Vagón, the Health Train of Fundación Grupo México, arrived in San Pedro, Coahuila from October 23 to 26 to give medical attention to the residents of the municipality.

ON MEXICO ISSUES

  • Napoleón Gómez Urrutia, a mining union lider and senator by Morena proposed to increase the taxes to mining concessions to levels of 20 to 30%, sustaining that countries like Peru, Bolivia or Chile are at those levels. That declaration was done while he was defending the federal government intention to use the Mining Fund to other means that what it was imposed for: helping develop mining communities. The leader of the Morena senators is to present an integral initiative for the mining sector. Why don’t we raise the taxes to mining, to the rights on mineral exploitation, to the mining concessions taxes?, asked Gómez Urrutia. Ricardo Monreal, a presidential hopeful considered the proposal to be correct, and asked for its formalization.
  • Fernando Alanís, Camimex (Cámara Minera de México) president said that 244 Canadian companies stopped investing in Mexico. Camimex is fighting for the 100% deductibility of exploration expenses, as it is a strong deterrent on exploration investment, where the most risk of the industry is concentrated.
  • At the AIMMGM Mining convention in Acapulco, the CONAGO (Conferencia Nacional de Gobernadores) and the federal government were at disagreement on the use of the Mining Fund. While the governors fight for the said funds to remain on the states and municipalities, the federal government proposed that 85% of the resources are directed to the Secretaria de Educación Pública (SEP), by reforming the Ley Federal de Derechos (Federal Law on Duties) starting on 2020. The federal proposal allows full discretionally use of the where the funds are used, even in areas where no mining is conducted. In 2018 alone, $3,840 M pesos (about US$202 M) were accrued on the Mining Fund.
  • Camimex expects the “Mesa de Minería” (Mining Forum) is installed before year’s end, and can start to work with the federal government, so the mining sector is heard and doubts and misunderstandings can be cleared. Subjects to address include the social, the environment, regulation of the investment compromise, and the fiscal issues. Camimex stressed the mining in Mexico pays about 46 percent in taxes.
  • Newmont-Goldcorp, re-started up production at its Peñasquito mine in Zacatecas, following the lifting of the illegal blockade on October 8, 2019. “With the support of the State and Federal governments, including an ongoing police presence, the Company has commenced an approximately 10-dayprocess of bringing back the operation to full production”.

ON EXPLORATION

  • One World Lithium Inc., announced the continuation of the phase 3 drilling program at its Salar del Diablo project in Baja California Norte. Four boreholes are planned for a total of 2,400 meters (about 8,000 feet) of exploration drilling. The company reported that the first borehole reached a depth of 220m. Target depths of up to 600 meters are expected to be achieved.
  • Aloro Mining Corp., is to sample high-grade gold veins on the northwest of the Los Venados property in Sonora. In this area lies a 3.5 km vein system up to 400 m in width that has been partially mapped. Results from early sampling have results of up to 32 g/t Au and 49 g/t Ag.
  • Agnico Eagle Mines Limited, provided an update of the exploration program carried out at its Santa Gertrudis project in Sonora. Drilling at Santa Gertrudis has extended the Amelia deposit in the Trinidad zone to 800m strike length, with highlight intercepts of 6.4 g/t Au over 7m and 9.6 g/t Au over 6m.
  • Radius Gold Inc., and Pan American Silver Corp., commenced the phase 3 drilling program at its Amalia project in Chihuahua. Pan American is now operating the project and expects to drill a minimum 2,500m of core drilling.
  • Galore Resources Inc., reported the completion of 1.667.20m of core drilling at its Dos Santos project in Zacatecas. Drilling results are still pending to be released.
  • GoGold Resources Inc., reported results from six new diamond drill holes including four from the San Juan zone, the first step out hole testing the El Troce area, and one from the Main area at its Los Ricos project in Jalisco. At San Juan, hole LRGG-19-050 intersected 0.39 g/t Au and 76 g/t Ag (1.41 g/t AuEq) over 45.3m, including 1.01 g/t Au and 242 g/t Ag (4.23 g/t AuEq) over 6.2m,and hole LRGG-19-051 intersected 0.4 g/t Au and 86 g/t Ag (1.55 g/t AuEq) over 24m. At El Troce, hole LRGG-19-053 intersected 1.53 g/t Au and 164 g/t Ag (3.72 g/t AuEq) over 10.1m, including 5.22 g/t Au and 489 g/t Ag (11.75 g/t AuEq) over 2.8m. At the Main area, hole LRGG-19-055 intersected 0.58 g/t Au and 75 g/t Ag (1.59 g/t AuEq) over 14.4m.

ON MINING

  • Agnico Eagle Mines Limited, reported Q3, 2019 production and financial results from their Mexican operations. At Pinos Altos mine, Chihuahua, it processed 519K tonnes of 2.22 g/t Au to produce 34.8K Oz Au at a total cash cost of USD $745 per Oz Au produced. At Creston Mascota mine in Chihuahua, the company processed 284K tonnes of 0.78 g/t Au to produce 9,596 Oz Au at a total cash cost of USD $668 per Oz Au produced. At La India mine, Sonora, Agnico processed 1.1M tonnes of 0.77 g/t Au to produce 18.4K Oz Au at a total cash cost of USD $872 per Oz Au produced.
  • Fresnillo plc, presented Q3 2019 production results from their Mexican operations. Consolidated production results for the Q3, 2019 reached 13.3M Oz Ag (including Silverstream for 659K Oz Ag), 209.7K Oz Au, 34.9M Lb Pb, and 56.8M Lb Zn. At Fresnillo mine, Zacatecas, the company processed 648,646 tonnes of 183 g/t Ag, 0.99 g/t Au, 1.24% Pb, and 2.14% Zn, to produce 3.4M Oz Ag, 15.6K Oz Au, 15.8M Lb Pb, and 22.9M Lb Zn. At Saucito mine, Zacatecas, it processed 703K tonnes of 207 g/t Ag, 1.22 g/t Au, 0.84% Pb, and 1.38% Zn, to produce 4M Oz Ag, 21K Oz Au, 11M Lb Pb, and 14.9M Lb Zn. At Pyrites Plant, Fresnillo processed 38,572 tonnes of 314 g/t Ag and 2.44 g/t Au, to produce 285K Oz Ag and 954 Oz Au. At Cienega mine, Durango, it processed 335,493 tonnes of 1.78 g/t Au, 151 g/t Ag, 0.81% Pb, and 1.35% Zn, to produce 17.8K Oz Au, 1.4M Oz Ag, 4.1M Lb Pb, and 6.2M Lb Zn. At San Julian mine in Chihuahua-Durango border, the company processed 321,798 tonnes of 1.39 g/t Au and 108 g/t Ag, to produce 13,711 Oz Au and 1M Oz Ag from veins, and 559,693 tonnes of 0.07 g/t Au, 130 g/t Ag, 0.41% Pb, and 1.35% Zn, to produce 523 Oz Au, 2M Oz Ag, 4M Lb Pb, and 12.8M LB Zn from the disseminated ore body. At the Herradura mine, Sonora, Fresnillo processed 5,591,746 tonnes of 0.71 g/t Au and 3 g/t Ag, to produce 102,439 Oz Au and 412K Oz Ag. At the Noche Buena mine, Sonora, it processed 3,215,167 tonnes for a total volume hauled of 11,447,273 tonnes with grades of 0.58 g/t Au and 0.25 g/t Ag to produce 37,570 Oz Au and 14K Oz Ag.
  • Excellon Resources Inc., announced Q3, 2019 production results from its Platosas mine, Durango. Excellon milled and processed 17,235 tonnes of 512 g/t Ag, 4.4% Pb, and 6% Zn to produce 257.5K Oz Ag, 1.3M Lb Pb, and 1.65M Lb Zn, with metallurgical recoveries of 87.2%, 77.7%, and 76.5% respectively.

ON FINANCING

  • Galore Resources Inc., closed a first tranche of a private placement for gross proceeds of CAD $187K.The company also implemented a cash + shares for services agreement with COMEFIN S DE RL DE CV, to conduct the diamond core drilling programs at Galore’s 100% owned El Alamo and Los Gemelos projects (Dos Santo project, Zacatecas).
  • One World Lithium Inc., reported that its previously announced non-brokered private placement (Sept 05, 2019), will be replaced by a non-brokered private placement of unsecured convertible notes for gross proceeds of $1M (Salar del Diablo project, Baja California Norte).
  • VVC Exploration Corporation, closed a non-brokered private placement for gross proceeds of CAD $2M. The proceeds of the Financing will be used for exploration and development on the Kaity Property in Mexico, including diamond drilling, land use permits and associated costs, metallurgical bench testing of the copper mineralization, and investigation, evaluation and implementation of the Gloria Pilot Mining Project (Kaity project in Samalayuca, Chihuahua).
  • Silver Viper Minerals Corp., closed a private placement financing to raise gross proceeds for $4M. Net proceeds will be used to continue exploration and development of its La Virginia Au-Ag in Sonora and for general corporate and working capital purposes.
  • Orla Mining Ltd., entered into a commitment letter with Trinity Capital Partners Corporation, with respect to a secured project finance facility of USD $125M for the development of its Camino Rojo project in Zacatecas.
  • Vista GoldCorp., received the third $1.5M option payment from Prime Mining Corporation for the Guadalupe de Los Reyes project in Sinaloa.
  • Newmont-Goldcorp, declared a quarterly dividend of $0.14 per share of common stock, payable on December 27, 2019 to holders of record at the close of business on December 5, 2019.
  • Gold Resource Corporation, announced it has increased 100% its instituted annual dividend from $0.02 to $0.04 per common share. This increases the monthly dividend to one-third of a cent per common share for October 2019 payable on November 25, 2019 to shareholders of record as of November 12, 2019 (Arista mine, Oaxaca).

ON RESOURCES AND DEVELOPMENT

  • Golden Minerals Co. informed it is working on a new PEA on its Velardeña properties in Durango, to reflect better metal prices and new metallurgical processes. At Rodeo, also in Durango, Golden plans to initiate a small drilling program to provide better definition on its 46 K Oz Au resource. At Yoquivo, in Chihuahua, Golden has the permits to initiate a drill program to test several epithermal veins early in 2020.
  • Minera Peñoles informed that is to start operations at its Capela mine in Guerrero. The Capela mine is a US$340 M investment that is to generate 1,000 direct jobs and at least 1,400 indirect ones. Mining generates more than 10 thousand direct jobs and 50 thousand indirect jobs, making it the second most relevant economic activity in the state.
  • Endeavour Silver Corp., reported infill drill results from 10 underground holes collared on the Veta Colorada vein at its Parral project in Chihuahua. Every hole intersected strong Ag mineralization below the lowest mine level. Recent drilling highlights include 308 g/t Ag over 11.6 m true width n hole VCU-16. “Several drill holes intersected two mineralized zones, the Veta Colorada and the HW Veta Colorada in the hanging wall, with a total true width of mineralization up to 16.5 m in hole VCU-17, with 226 g/t Ag over 7.6m true width, including 593 g/t Ag over 0.5m true width, and 254 g/t Ag over 8.9m true width, including 1,355 g/t Ag over 0.5m true width”.

ON DEALS AND CORPORATE ISSUES

  • Alien Metals Ltd., appointed Novum Securities Ltd as its joint corporate broker with immediate effect (San Celso project, Zacatecas).
  • Defiance Silver Corp., appointed a couple of OreQuest consultants as technical advisors to execute the ongoing exploration program at its san Acacio project in Zacatecas.
  • Impact Silver Corp., granted stock options to directors, officers, and employees for the purchase of 2M shares in its capital at the above market price of $0.36 per share (Zacualpan mining district, State of Mexico).
  • Oroco Resources Corp., announced that its special general meeting for shareholders will be held on December 19, 2019 to consider and vote on a resolution to approve the Company’s option to acquire Altamura Copper Corp.(Santo Tomas project, Sinaloa).
  • Vangold Mining Gold, informed about changes on its Board of Directors and expanded the role in the company of its CFO to become in its corporate secretary (El Pinguico mine, Guanajuato).
  • Tamino Minerals, has been invited to list on the Mexican Stock Exchange. If Tamino can achieve the listing, it may have a solution to combat its shortage of investment capital and advance their exploration projects (El Volcan, Sonora).
  • Torex Gold Resources Inc, responded a recent letter to its shareholders and stakeholders to confirm its long-term strategy to develop a sustainable, multi-asset, mining business by executing operationally to generate strong free cash flow from its Limon-Guajes mine in Guerrero, de-risking and bringing Media Luna project, Guerrero into production, and delivering the full potential of its innovative Muckahi Mining System to the benefit of all Torex shareholders.
  • Sonoro Metals Corp., continued advancing its discussions with China-based engineering, procurement and construction companies regarding plans to develop and finance a proposed heap leach pilot operation for its Cerro Caliche project in Sonora.
  • Magellan Gold Corp., entered into an option agreement with Golden Minerals Company to acquire 100% interest in the Santa Maria project in Chihuahua by making a cash payment of USD $1M to Golden at closing, and pay Golden a 6.5% NSR based royalty from all production until a total of USD $3M has been paid under the royalty agreement, the royalty is then reduced to a 3.0% NSR based royalty for the balance of the property life.
  • Santacruz Silver Mining Ltd., appointed a new director to its Board (Veta Grande, Zacatecas).
  • Ternium, received from PROFEPA, a certification as a clean industry for the 6th consecutive year, established by the Mexican Standard, NMX-AA-162-SCFI 2012, Regulation of the General Law of Ecological Balance and the Protection of the Environment in matters of Self-Regulation and Environmental Audits. The certification was granted to the Alzada pelletizing plant and Tecomán station, both located in Colima.

ON SOCIAL RESPONSIBILITY

  • In Aconchi, Sonora, the Orquesta La Caridad from Grupo Mexico offered a concert to 250 attendees by 110 children and young people from Nacozari, the first on its Rio Sonora tour.
  • Doctor Vagón, the Health Train of Fundación Grupo México, arrived in San Pedro, Coahuila from October 23 to 26 to give medical attention to the residents of the municipality. The Health Train will offer general consultations, dermatology, pediatrics, dentistry, chiropractic and physical rehabilitation, Comprehensive service for women (mastography, colposcopy), comprehensive diabetic patient clinic, comprehensive service for women, nutrition, psychology, optometry, family planning, geriatrics, audiometry, laboratory tests and cabinet studies, all for free.

 Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.

On the picture above, barite crystals in a rhyolite tuff from a prospect in Chihuahua, Mexico.  Photo by Miguel A Heredia.

Silver Viper Closes $4 Million Private Placement and Appoints Investor Relations Firm

190924_silver_viper_pp_close_and_ir

Vancouver, BC – Silver Viper Minerals Corp. – (TSXV: VIPR) (“Silver Viper” or the “Company”) is pleased to announce that it has closed a private placement financing (the “Offering”) to raise gross proceeds of $4.0 million from the sale of 16,000,000 units at a price of $0.25 per unit (“Units”). Each Unit consists of one common share of the Company (each a “Common Share”) and one-half of one share purchase warrant (each, a “Warrant”), with each whole warrant entitling the holder thereof to purchase one Common Share at a price of $0.35 per share for a period of two years.

Magellan Gold Corporation Announces Agreements to Enhance Balance Sheet and Shareholder Update

Magellan Gold Corporation_081019_nr

Reno, NV —- Magellan Gold Corporation (OTCQB:MAGE) (“Magellan” or the “Company”) today announced agreements effective September 30, 2019 (the “Agreements”) with its primary secured creditors and largest shareholder to convert an aggregate of $2.45 million of outstanding debt obligations (including a secured line of credit, outstanding promissory notes and advances) into a newly-created series of Preferred Shares of the Company (“Preferred Shares”). The Preferred Shares will carry a $2.45 million liquidation preference, subject to adjustments, be convertible into common stock at $1.00 per share and bear a 10% annual dividend payable in kind at the option of the Company. The Agreements release and reduce liens on certain assets of the Company and convert portions of both its secured and unsecured debt holdings to Preferred Shares in order enhance the balance sheet and facilitate new financing arrangements.

The Mining and Exploration News in Mexico: Highlights on the Fourth Week of September, 2019.

Quartz vein displaying lattice  bladed texture

By Miguel A Heredia

During the thirty-nine week of the year (September 23th to September 29th, 2019), at least 21 press releases were announced by companies working in Mexico, with seven informing on exploration results, six disclosing deals and corporate issues, three announcing financial rounds, two communicating production results, one reporting on resources and development of their projects, one commenting on Mexican issues, and one notifying on social responsibility.  ON MEXICO ISSUES, Los Gatos mine was inaugurated in San José del Sitio, Chihuahua with an investment of USD $366M.  ON EXPLORATION, In Baja California Norte, One World Lithium announced the continuation of the phase 3 drilling program at its Salar del Diablo project. In Sonora, Ridgestone released historical assays results from its Rebeico project. In Chihuahua, Kootenay reported drilling results from its Columba project.  In Durango, Canasil reported high grade sampling results from its Nora property. In Jalisco, GoGold released drill results from its Los Ricos project. In Veracruz, Mexican Gold announced 3,000m of drilling and its exploration plan for the remainder 2019 on its Las Minas project, and Azucar Minerals released drilling results from its El Cobre project. ON MINING, Mexus Gold provided an update on its Santa Elena mine in Sonora. Azure also provided an update on the first phase small-scale mining program at its Oposura project in Sonora. ON FINANCING, Aztec Minerals applied to the TSX to extend the term of 2,551,250 common share purchase warrants (Cervantes project, Sonora). Silver Viper closed a private placement for gross proceeds of $4M (La Virginia project, Sonora). Gold Resource declared its monthly dividend for September 2019 to shareholders (Arista mine, Oaxaca).  ON RESOURCES AND DEVELOPMENT, Prime informed that the company completed a formal visit to its Los Reyes property in Sinaloa, to attend meetings with local stakeholders, to secure surface access and begin site preparation, and to initiate exploration and engineering work for the planned production phase. ON DEALS AND CORPORATE ISSUES, Advance Gold announced that a geophysical adviser was added to its exploration team (Tabasquena project, Zacatecas). Colibri Resources entered into a property option agreement with Tocvan Ventures Corp., on its Pilar property in Sonora. Consolidated Zinc completed the acquisition of a 100% interest of the Plomosas mine in Chihuahua. Vizsla entered into a definitive share purchase agreement to acquire an option on the Panuco-Copala mining camp in Sinaloa. Ridgestone entered in an agreement to acquire a 100% interest in 10 mining concessions adjacent to its Rebeico project in Sonora. ON SOCIAL RESPONSIBILITY, Fortuna Silver, through its subsidiary Minera Cuzcatlán, has invested MXP $177.2M in social programs in Oaxaca, Mexico.

 ON MEXICO ISSUES

  • Los Gatos mine was inaugurated in San José del Sitio, Chihuahua. The governor of Chihuahua State, Javier Corral, participated in the inauguration of the Los Gatos mines, located in San Jose del Sitio, Chihuahua. The mine was built with an investment of USD$ 366M among the Japanese company Dowa Mining and the American Sunshine Silver Mining company, for an estimated daily production of 2,500 tons of ore, which will be processed in the same plant with state-of-the-art technology, to obtain concentrates of Ag, Pb, and Zn. Governor Javier Corral celebrated the alliance of Japanese and American capital that occupied 1,800 people in construction and will give permanent employment to another 510 on its operation.

ON EXPLORATION

  • One World Lithium, announced the continuation of the phase 3 drilling program at its Salar del Diablo project in Baja California Norte. The phase three will consists of 3 holes adjacent to previously partly drilled holes 1, 9, and 11, and 1 hole located 50km to the south, for a total of 2,400m. Each hole has planned depths of 600m. Each hole will be drilled with a mud rotary rig that will set casing to 200 meters and then core drilled to the planned total depth of 600 meters. Objectives of the drilling program are “to determine the presence of aquifers that may contain concentrations of lithium in brines at depth; to collect representative, depth-specific groundwater samples for chemical analysis of major elements, including Li; to obtain drill core samples for analysis for drainable porosity that will assist in resource estimations; and to use borehole lithologic descriptions to identify hydrogeologic units and the stratigraphy of the basin; to help calibrate existing and future geophysical surveys; and to create a hydrogeologic model to develop a potential future Li resource”.
  • Ridgestone Mining Inc., released historical assays results from its Rebeico project in Sonora. These assays are from rock chip samples obtained by the Servicio Geológico Mexicano (SGM) at El Cobre, Tres Hermanos, Amargosa I and II, La Amargosita, and Campo Seco old workings. At El Cobre, two samples taken on the vein reported 0.8 g/t Au, 39 g/t Ag, 1.67% Cu, and 0.12% Mo over 1.18m, and 0.7 g/t Au, 50 g/t Ag, 0.51% Cu, and 0.18% Mo over 1.12m. In addition, two dump samples returned 0.5 g/t Au, 102 g/t Ag, 2.41% Cu, and 0.30% Mo, and 0.35 g/t Au, 38 g/t Ag, 2.07% Cu, and 1.22% Mo. At Tres Hermanos, highlights include 14.6 g/t Au and 23 g/t Ag over 1.30m; 8.13 g/t Au and 17 g/t Ag over 1.20m; 3.4 g/t Au, 23 g/t Ag, and 0.14% Cu over 1.90m; and 1.4 g/t Au, 137 g/t Ag, and 2.72% Cu over 1.0m. At La Amargosa I and II, 10 g/t Au and 3.48% Cu over 0.7m; 5.86 g/t Au and 1.85% Cu over 0.68m; and 2.66 g/t Au and 0.55% Cu over 0.71m. At La Amargosita, 17 g/t Au, 73 g/t Ag, and 0.45% Cu over 1.30m and one dump sample with 0.1 g/t Au, 777 g/t Ag, and 1.56% Cu. At Campo Seco, 0.1 g/t Au, 18 g/t Ag and 7.49% Cu over 0.55m.
  • Kootenay Silver Inc., reported drilling results from three holes drilled on the F Vein and five holes drilled on the I Vein at its Columba project in Chihuahua. Significant drill intersections were encountered in hole CDH-19-011 with 133 g/t Ag, 0.04% Pb, and 0.15% Zn over 11.0m, including 245 g/t Ag, 0.13 g/t Au, 0.1% Pb, and 0.3% Zn over 5.0m, and including 648 g/t Ag, 0.63 g/t Au, 0.2% Pb, and 0.6% Zn over 1.0m, on the F Vein, and 228 g/t Ag, 0.1% Pb, and 0.6% Zn over 1.2m and 102 g/t Ag, and 0.1% Zn over 1.68m on the foot wall vein; in hole CDH-19-012 with 184 g/t Ag, 0.2 g/t Au, 0.1% Pb, and 0.4% Zn over 11.0m, including 476 g/t Ag, 0.66 g/t Au, 0.3% Pb, and 1% Zn over 3.15m, including 476 g/t Ag, 0.66 g/t Au, 0.3% Pb, and 1% Zn over 3.15m, and including 755 g/t Ag, 1.16 g/t Au, 0.5% Pb, and 1.7% Zn over 1.75m on the F Vein, and three intersections on the hanging wall of 113 g/t Ag, 0.1% Pb, and 0.1% Zn over 1.35m, 699 g/t Ag, 0.4% Pb, and 0.8% Zn over 2.1m, and 113 g/t Ag, 0.1% Pb, and 0.1% Zn over 0.6m; in hole CDH-19-013 with 273 g/t Ag, 0.1% Pb, and 0.2% Zn over 4.15m on I Vein, including 697 g/t Ag, 0.15% Pb, and 0.3% Zn over 0.65m, and 328 g/t Ag, 0.1% Pb, and 0.2% Zn over 2.65m; in hole  CDH-19-014 with 261 g/t Ag, 0.3% Pb, and 0.6% Zn over 5.01m on the I Vein, and 894 g/t Ag, and 0.4% Zn over 0.42m on the hanging wall; in hole CDH-19-015 with 1,005 g/t Ag, 0.4% Pb, and 0.7% Zn over 0.3m on the I Vein; and in hole CDH-29-016 with 357 g/t Ag on the I Vein. “Drilling continues at the property with a total of 24 holes completed to date and the program being expanded from 3000 meters to approximately 4500 meters. It is anticipated that a total of 35 to 40 holes will be completed by early November with assay results continuing into December”.
  • Canasil Resources Inc., reported high grade results from 21 surface samples taken along the Candy vein, 31 samples collected from adjacent country rocks, and 12 dump samples at its Nora project in Durango. The Candy vein, an epithermal Au-Ag target, has not been previously drilled. There has been limited, historical mining of the Candy vein, and small mineralized waste dumps are present. Average of the 21 samples collected along the Candy vein is 1.69 g/t Au, 140 g/t Ag, 0.4% Cu, 1.6% Pb, and 0.6% Zn over 0.68m, with the highest Au value of 12.55 g/t Au, 12 g/t Ag, 1% Cu, 2.7% Pb, and 0.7% Zn over 0.40m, and the highest Ag value of 605 g/t Ag, 3.72 g/t Au, 0.97% Cu, 1.2% Pb, and 0.4% Zn over 1.0m. The average grade of the 12 dump samples is 1.40 g/t Au, 86 g/t Ag, 1.1% Cu, 3.4% Pb, and 1.6% Zn. These results will be interpreted to identify possible locations for subsequent drilling.
  • GoGold Resources Inc., released drilling results of four new holes drilled at Los Ricos Main Area and three new holes drilled at San Juan Area from its Los Ricos project in Jalisco. Significant drill intersections at Los Ricos Main Area were encountered in hole LRGG-19-038 with 0.72 g/t Au and 165 g/t Ag (2.92 g/t AuEq) over 21.2m, including 1.33 g/t Au and 302 g/t Ag (5.36 g/t AuEq); in hole LRGG-19-040 with 0.4 g/t Au and 115 g/t Ag (1.93 g/t AuEq) over 17.5m, including 0.89 g/t Au and 281 g/t Ag (4.64 g/t AuEq) over 4.5m; in hole LRRGG-19-041 with 1.14 g/t Au and 115 g/t Ag (2.68 g/t AuEq) over 23.3 m, including 4.6 g/t Au and 398 g/t Ag (9.91 g/t AuEq) over 5.5m; and in hole LRGG-19-042 with 0.47 g/t Au and 69 g/t Ag (1.40 g/t AuEq) over 29.2m, including 1.65 g/t Au and 224 g/t Ag (4.63 g/t AuEq) over 6.7m. At San Juan Area, the most significant drill intersections were encountered in hole LRGG-19-045 with 0.59 g/t Au and 34 g/t Ag (1.04 g/t AuEq) over 20m, including 2.92 g/t Au and 91 g/t Ag (4.123 g/t AuEq) over 3.5m; and in hole LRGG-19-046 with 0.36 g/t Au and 62 g/t Ag (1.19 g/t AuEq) over 36m, including 1.3 g/t Au and 220 g/t Ag (4.24 g/t AuEq) over 5.5m.
  • Mexican Gold Corp., announced an aggressive exploration plan for the remainder of 2019 at its Las Minas project in Veracruz, including a drill program of 3,000m. The company plans to drill test the Pueblo Nuevo, Cinco Señores TEM anomaly, Las Minillas, and El Dorado targets, and test the conceptual targets of Sub-Sill and the Mancuerna Dike Swarm for potential skarn mineralization.
  • Azucar Minerals Ltd., reported results from its ongoing drilling program at its El Cobre project in Veracruz at Norte, Villa Rica, Porvenir and Suegro targets. The most significant intervals were encountered at the Norte Target, where the hole EC-19-077 intersected 0.26 g/t Au and 0.11% Cu over 43.50m, including 0.53 g/t Au and 0.21% Cu and the hole EC-19-082 intersected 0.25 g/t Au and 0.12% Cu over 237.30m, including 0.63 g/t Au and 0.27% Cu over 44.45m, and another interval of 1.01 g/t Au and 0.33% Cu over 12.75m. At El Porvenir target, hole EC-19-078 intersected 82 g/t Au and 0.02% Cu over 12m, including 20.6 g/t Au and 0.01% Cu over 1.0m.

ON MINING

  • Mexus Gold US, provided an update on its Santa Elena mine in Sonora. The compnay informed that all systems are working properly but the Merrill Crow Au recovery plant currently in use is running at 30 gpm and producing 3Oz Au per day. Mexus is moving a new plant to Santa Elena which will have the capacity to run up to 500 gpm. This new equipment is expected to be operational in October, which allows the company to reach its long term production goal.
  • Azure Minerals Limited provided an update on the first phase small-scale mining program at its Oposura project in Sonora. Azure extracted and stockpiled an estimate of 6,100 tons of 13.4% Zn and 10.7% Pb from open pit, including 2,100 tonnes of 24% Zn and 18.3% Pb. Tonnages and grades exceed significantly the mineral resource estimate for this part of the deposit. Ore processing will start in the December quarter and will continue for 2-3 months. “Azure will produce separate Zn and Pb-Ag concentrates and expects to sell them on the spot market to locally-based metals traders or smelters, several of which have expressed strong interest in these products”.

ON FINANCING

  • Aztec Minerals Corp., applied to TSX to extend the term of an aggregate of 2,551,250 common share purchase warrants by one year from October 21, 2019 to October 21, 2020. “Each warrant entitles the holder to acquire one common share in the capital of the company at an exercise price of $0.25 per common share until the current expiry date of October 21, 2019. An aggregate of 23,750 warrants have been exercised to date and 550K warrants are held, directly or indirectly, by insiders of the company. The extension of the term of the warrants for an additional year is subject to the acceptance of TSX” (Cervantes project, Sonora).
  • Silver Viper Minerals Corp., closed a private placement for gross proceeds of $4M. Net proceeds will be used to continue exploration and development of its la Virginia project in Sonora, and for general corporate and working capital purposes.
  • Gold Resource Corporation, declared its monthly dividend of 1/6 of a cent per common share for September 2019, payable in October 23, 2019 to their shareholders (Arista mine, Oaxaca).

ON RESOURCES AND DEVELOPMENT

  • Prime Mining Corp., informed that the company completed a formal visit to its Los Reyes property in Sinaloa, to attend meetings with local stakeholders, to secure surface access and begin site preparation and to initiate exploration and engineering work for the planned production phase. The company has initiated a 5,000m trenching and surface sampling program on mineralized structures to provide valuable assay data to be used in conjunction with down drill data to update resource estimation. “The current trenching program will provide greater confidence in the conversion of these blocks to indicated resources for the upcoming resource estimate”.

ON DEALS AND CORPORATE ISSUES

  • Advance Gold Corp., announced that a geophysical adviser with over 40 years of international mining exploration experience was added to its exploration team (Tabasquena project, Zacatecas).
  • Colibri Resources Corporation, entered into a property option agreement with Tocvan Venture Corp., on its 100% owned Pilar project in Sonora. Tocvan has been granted a 60 days exclusivity period to complete a due diligence by paying Colibri $25K. If the due diligence is positive and Tocvan decide to continue the option agreement, it will have the option to earn 51% of the property over a 5 years period by issuing 2M common shares, paying CAD $100K to Colibri, 60 days after signing the final agreement, and performing CAD $250K of exploration expenditures at Pilar property during the first year. On year 2, Tocvan will pay CAD $ 50K to Colibri and will perform CAD $350K of exploration expenditures. On year 3, Tocvan will pay CAD $75K and issue 1M common shares to Colibri, and perform CAD $400K of exploration expenditures. On year 4, Tocvan will pay CAD $75K and issue 1M common shares to Colibri, and perform CAD $500K of exploration expenditures. On year 5, Tocvan will pay CAD $75K and issue 1M common shares to Colibri, and perform CAD $500k of exploration expenditures. Upon completion of these terms Tocvan will be granted a 6 month option to purchase the remaining 49% of Pilar in exchange for CAD $2M and a 2% NSR on the project, of which 1% could be sold by Colibri for a price of CAD $1M. Tocvan will operate the project during the option period.
  • Consolidated Zinc Limited, completed the acquisition of a 100% interest of the Plomosas mine in Chihuahua by acquiring the remaining 10% interest from Retec Guaru S.A. de C.V.
  • Vizsla Resources Corp., entered in a definitive share purchase agreement to acquire an option over the consolidated mineral rights, infrastructure and processing facilities comprising the large scale Panuco-Copala mining camp in Sinaloa. Vizsla has agreed to acquire all of the outstanding shares of Canam Alpine Ventures Ltd. Vizsla will acquire Canam for a total staged consideration of 18M common shares of Vizsla by issue 6M common shares on closing of the acquisition, 6.5M common shares upon definition of a resource greater than 200K Oz AuEq, and 5.5M common shares upon exercise of the option. Also, Vizsla will pay USD $700K on signing, USD $450K in the first anniversary of signing, USD $5,184,500 and work commitment of USD $3,423,000 in the second anniversary of signing, USD $6,846,000 in the third anniversary of signing, USD $8,557,500 in the fourth anniversary of signing, USD $9,269,000 in the fifth anniversary of signing, and USD $11,907,425 in the sixth anniversary of signing.
  • Ridgestone Mining Inc., entered in an agreement to purchase a 100% interest in 10 mining concessions adjacent to its Rebeico project in Sonora. These 10 mining concessions cover an area of 3,292 hectares and contain numerous artisanal old workings and mineralized outcrops. Terms of the acquisition include a cash payment of USD $83K and the issuance of 5M common shares of Ridgestone to the vendor.

ON SOCIAL RESPONSIBILITY

  • Fortuna Silver Mines Inc., through its subsidiary Minera Cuzcatlán has invested MXP $172.2M in San Jose del Progreso, Oaxaca and surrounding communities, since it started operations in 2011. One of the most outstanding projects to date is the breeding and fattening of lambs in the community of El Cuajilote. This has been successfully promoted by Compañía Minera Cuzcatlán since 2016. The company contributes with inputs and technical advice, while producers provide labor. Additionally, the suppliers of inputs are 100% local, also benefiting companies in the region. Currently 70% of 400 square meters of productive infrastructure have been installed. The amount of sheep bellies, of a target of 90, has been increased by 45% by keeping them in the feeding and reproduction program. Likewise, the percentage of births has increased from 80% to 125%. In this way, Compañía Minera Cuzcatlán makes a difference for families benefiting from this and other programs, since they receive financial support by providing inputs for food by the company and training according to the productive or reproductive season.

Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.

On the picture above, quartz vein with stibnite and displaying lattice  bladed texture in a prospect in San Luis Potosi, Mexico.  Photo by Miguel A Heredia.

VVC Announces Extended Closing for Private Placement Financing

VVC Announces Extended Closing for Private Placement Financing

TORONTO, Sept. 16, 2019 (GLOBE NEWSWIRE) — VVC Exploration Corporation (“VVC” or the “Company”) (TSX-V:VVC) announces the following:

Private Placement Financing

As previously announced on July 30, 2019, VVC is raising up to CA$2.5 million in a non-brokered private placement of units of the Company at a price of CA$0.05 per Unit. Each Unit consists of one common share and one-half of one common share purchase warrant entitling the holder to purchase one additional common share of the Company for a period of three years, at an exercise price of CA$0.06 per share. The Company will pay a Finder’s Fee, not to exceed 7% of the aggregate amount raised by the Finder, to be paid by the issuance of up to 3,500,000 common shares and 1,750,000 warrants.

MEXICAN GOLD ANNOUNCES MANAGEMENT APPOINTMENTS AND PROVIDES A CORPORATE UPDATE

nr-2019-09-03

Mexican Gold Corp. (the “Company” or “Mexican Gold”) (TSXV: MEX) announces that it has made significant additions to its management team. Along with the financing closed in July, the Company is now in a strong financial and corporate position to explore and advance the Las Minas gold-copper resource in Veracruz, Mexico and to create value for shareholders.

The Mining and Exploration News in Mexico: Highlights on the Fifth Week of August, 2019.

 

Flow -banded rhyolite

By Miguel A Heredia

During the thirty-five week of the year (July 26th to September 1st, 2019), at least 22 press releases were announced by companies working in Mexico, with seven disclosing deals and corporate issues, six announcing financial rounds, four communicating production results, three reporting on resources and development of their projects, and two informing on exploration results.  ON MEXICO ISSUES, no relevant news.  ON EXPLORATION, In Chihuahua, Kootenay reported drilling results from four holes drilled at its Columba project. In Jalisco, GoGold reported drilling results from ten new holes drilled at its Los Ricos project. ON MINING, Argonaut extended El Castillo mine life with zero-cost collar gold price protection program. Mexus Gold commenced leaching of 5K tonnes of mineralized material at its Santa Elena mine in Sonora.  Telson processed 2,166 tonnes of concentrates from its Tahuehueto project in Durango and announced significant metallurgical recoveries. Santacruz reported Q2, 2019 production and financial results from their Mexican operations.  ON FINANCING, Excellon completed an $11.5M bought deal financing (La Platosa mine, Durango). First Mexican Gold announced consolidation and private placement for gross proceeds of $0.5M (Guadalupe property, Sonora). Sable announced a strategic investment with Osisko Gold Royalty for potential proceeds of $12.58M (Margarita project, Chihuahua). Silver Spruce closed a private placement for gross proceeds of $261,250 (Pino de Plata project, Chihuahua). New Gold closed a bought deal financing for gross proceeds of CDN $150M (Cerro San Pedro mine, San Luis Potosi).  Gold Resource declared monthly dividend to shareholders (Arista deposit, Oaxaca). ON RESOURCES AND DEVELOPMENT, Santacruz updated mineral resource estimate at its Veta Grande project in Zacatecas. Impact Silver reported results of the successful dense media separation (DMS) study at its Capire project in Mexico State. SilverCrest released in-fill drilling results from its Las Chispas project in Sonora.  ON DEALS AND CORPORATE ISSUES, Prize Mining reported results from its annual general meeting of shareholders (Manto Negro project, Coahuila). SilverCrest announced that the company will begin trading on TSX (Las Chispas project, Sonora).  Golden Minerals received continued listing standard notice from New York Stock Exchange (Santa María project, Chihuahua). Azure revealed that it has regained 100% of the Alacran Au-Ag project from Teck. Consolidated Zinc announced that the Federal Court of Mexico has ruled in its favour on the land use agreement dispute with the landowner. Minera Alamos announced the closing of the Guadalupe de los Reyes option and the acquisition of common shares of Prime Mining. Newmont Goldcorp announced successful completion of consent solicitation for its 5.875% notes due 2035 (Peñasquito mine, Zacatecas).  ON SOCIAL RESPONSIBILITY, no relevant news.

 ON MEXICO ISSUES

  • No relevant news

ON EXPLORATION

  • Kootenay Silver Inc., released drilling results from four new holes drilled at its Columba project in Chihuahua. Significant drill intersections were encountered in hole CDH-19-009 with 516 g/t Ag and 0.2% Zn over 2.90m, including 1,070 g/t Ag and 0.4% Zn over 0.90m; hole CDH-19-008 with 112 g/t Ag over 33.5m, including 408 g/t Ag, 0.7% Pb, and 1.1% Zn over 4.85m; and hole CDH-19-007 with 417 g/t Ag and 0.1% Zn over 1.68m and other interval of 693 g/t Ag, 0.4% Pb, and 1.13% Zn over 1.55m. The ongoing drilling program has showed that the F vein has returned high grades over good widths, the known veins have excellent continuity along strike and to depth, and the newly discovered veins in the hanging wall also contain high grades. Kootenay has drilled 16 holes to date of a planned first phase 25-30 holes program.
  • GoGold Resources Inc., announced drilling results from ten new holes drilled at its Los Ricos project in Jalisco: three at the Los Ricos main area and seven on the Cerro Colorado target located 1.5Km to the south of the main area. The most significant drill intersections were encountered in hole LRGG-19-028 located at the Los Ricos main area, with 1.21 g/t Au and 133 g/t Ag (2.99 g/t AuEq) over 27.5m, including 2.93 g/t Au and 294 g/t Ag (6.85 g/t AuEq) over 11m, and on the Cerro Colorado target in hole LRGC-19-004 with 1.28 g/t Au and 107 g/t Ag (2.71 g/t AuEq) over 11.5m. The drilling program has now been expanded for additional testing along 3.2Km of the Los Ricos mineralized zone while at the Cerro Colorado target it has showed that the quartz vein system has good grades over a strike length of at least 500m.

ON MINING

  • Argonaut Gold Inc., extended El Castillo mine life as it entered into a series of zero-cost collar option contracts. The contracts cover 145K Oz Au through mid-2022. The floor price of the monthly gold collars has been set at $1,450/Oz with the ceiling price of the collars ranging from $1,630/Oz in Q4, 2019 to $1,760/Oz for H1, 2022.
  • Mexus Gold US, commenced leaching of 5K tonnes of ore material at its Santa Elena mine in Sonora, and expects to recover from 5 to 8 Oz Au per day. The ore material has been tested and is returning values as high as 54.74 g/t Au.
  • Telson Mining Corporation, processed 2,166 tonnes of concentrate with average grades of 5.32 g/t Au, 38 g/t Ag, 1.7% Pb, 3.2% Zn, and 0.24% Cu from its Tahuehueto project in Durango, to produce 82.9 tonnes of Au rich Pb concentrate grading 101 g/t Au, 702 g/t Ag, 38.8% Pb, and 5.29%Cu, and 130.8 tonnes of Zn concentrate grading 40.8% Zn, 12.02 g/t Au, and 94 g/t Ag. Telson has achieved the highest recoveries to date at 86% Au, 85% Ag, 86% Pb, 77% Zn, and 84% Cu.
  • Santacruz Silver Mining Ltd., reported Q2, 2019 production and financial results from their Mexican operation in Zacatecas and San Luis Potosi. Consolidated mining operations generated a gross profit of $251, including gross profit from Rosario mine in San Luis Potosi of $54, and gross loss from Veta Grande mine in Zacatecas of $691 plus mine services gross profit of $888. Net loss after taxes was $1,137, cash cost per Oz AgEq of $16.07 and an AISC of $18.37. Santacruz processed 37,156 tonnes at Veta Grande to produce 240.2K Oz AgEq, at a cash cost of $17.68 per Oz AgEq produced and an AISC of $19.70 per Oz AgEq. At El Rosario, it processed 20.789 tonnes to produce 133.1K Oz AgEq at a cash cost of $14.23 per Oz AgEq produced and an AISC of $16.81 per Oz AgEq.

ON FINANCING

  • Excellon Resources Inc., completed its previously announced bought deal offering for $11.5M. Gross proceeds will be used to fund exploration and capital expenditures at its Platosa project in Durango, and its Evolution project in Zacatecas. In connection with the offering, insiders purchased an aggregate of 1,015,000 units for a total consideration of $1M.
  • First Mexican Gold Corp., announced consolidation of its common shares on a ten for one basis, and proposes to close a private placement for gross proceeds of $0.5M. The closing of the offering is anticipated to take place on or about September 30, 2019, or such other later date as the Company may agree (Guadalupe project, Sonora).
  • Sable Resources Ltd., announced a strategic investment with Osisko Gold Royalty for potential proceeds of $12.58M. This financing will provide Sable with the funding to progress its exploration objectives over its entire portfolio for the next 4 years. In connection with the financing, Osisko will have a right of first refusal over any royalty, stream or similar right in Sable properties, equity participation right to maintain pro-rata ownership interest so long as Osisko owns more than 5% of the outstanding common shares of Sable, and the right to nominate one person to Sable´s board of directors so long as Osisko owns more than 5% of the outstanding common shares of Sable. Additionally, Sable granted Osisko the right to acquire 1% NSR on properties controlled by Sable´s wholly subsidiaries in Mexico for $5M. The NSR will extend to any additional properties acquired by Sable within a period of 4 years from the closing of the NSR agreement. Sable also has granted Osisko the right to acquire an additional 1% NSR for $5.5M on all minerals produced from initial and future properties control by Sable until the expiration of the NSR agreement (Margarita and Vinata projects, Chihuahua).
  • Silver Spruce Resources Inc., closed a private placement for net proceeds of $261,250. Funds will be used to conduct due diligences and exploration activities (Pino de Plata project, Chihuahua).
  • New Gold Inc., closed a bought deal financing for gross proceeds of CAD $150M (Cerro San Pedro mine, San Luis Potosi).
  • Gold Resource Corporation, declared its August dividend of 1/6 of a cent per common share payable on September 23, 2019 to shareholders (Arista deposit, Oaxaca).

ON RESOURCES AND DEVELOPMENT

  • Santacruz Silver Mining Ltd., updated mineral resource estimate at its Veta Grande project in Zacatecas. Considering a cut-off of 100 g/t Ag, the inferred resources is 3,954,729 tonnes of 136 g/t Ag, 0.14 g/t Au, and 0.11% combined Pb+Zn (153 g/t AgEq) to contain 47M Oz AgEq.
  • Impact Silver Corp., reported results of the successful Dense Media Separation (DMS) study at its Capire open pit VMS deposit located within the Zacualpan mining district in Mexico State. “These preliminary tests indicate that it may be possible to pre-concentrate crushed run of mine material using a low cost Dense Medium Separation (DMS) plant prior to milling and mineral processing, thereby reducing the overall cost of processing at Capire and potentially bringing it back into economic production”. An initial test showed that 25% of the sample retained over 99% of Ag, Pb, and Zn minerals, and over 97% of Cu and Au in a heavy liquid separation (HLS) concentrate. A second test showed that over 42% of the sample retained 93% of Ag and Pb minerals and 79% to 92% of Cu, Au, and Zn in an HLS concentrate. “These results suggest that the addition of a DMS pre-concentration plant to the Capire process flow sheet could unlock some significant operating cost improvements that would subsequently allow a lowering of cut off grade and access to otherwise uneconomic areas of the Capire deposit”.
  • SilverCrest Metals Inc., released in-fill drilling results of 33 holes from the Babi Sur vein within its Las Chispas project in Sonora. The in-fill drilling has increased the confidence of resources and high-grade continuity in the vein. The most significant drill intersections were encountered in hole BAS19-63 with 8.51 g/t Au and 717 g/t Ag (1,355 g/t AgEq) over 3.1m of true width; hole BAS19-57 with 3.1 g/t Au and 305 g/t Ag (536 g/t AgEq) over 8.8m; and hole BAS19-49 with 5.32 g/t Au and 374 g/t Ag (773 g/t AgEq) over 3.8m. “The Babi Sur Vein and Babi Sur HW Vein are still open to depth and down plunge to the southeast. Unnamed veins are under review for possible continuity and announcement(s) of additional vein discoveries. Approximately 25 to 35 additional in-fill and expansion holes, for a minimum of 7,000 metres, are planned for the Babi Sur veins in H2, 2019”.

ON DEALS AND CORPORATE ISSUES

  • Prize Mining Corporation, reported results from its annual general meeting of shareholders. It also plans to change the name of the company to Boundary Gold and Copper Mining Ltd, and a consolidation of its common shares on a five for one basis. Change name is subject to the approval of the TSX (Manto Negro project, Coahuila).
  • SilverCrest Metals Inc., announced that it will begin trading on the Toronto Stock Exchange (TSX) following its graduation from the Toronto Stock Exchange Venture (TSXV) (Las Chispas project, Sonora).
  • Golden Minerals Company, received continued listing standard notice from the New York Stock Exchange. Specifically, the company is not in compliance with section 1003 (a) (iii) since it reported stockholder´s equity of less than $6M as of June 30, 2019 and losses from continuing operations and/or net losses in its five most recent fiscal years. In order to maintain its listing on the NYSE, Golden was asked to submit a plan of compliance no later than September 18, 2019 advising how the company intends to regain compliance with section 1003 (a) (iii) of the company guide by February 19, 2021 (Santa Maria project, Chihuahua).
  • Azure Minerals Limited, revealed that it has regained 100% of the Alacran Au-Ag project in Sonora from Teck. Alacran project host global resources of 32.2M Oz Ag and 150K Oz Au, being 27.4M Oz Ag at Loma de Plata deposit and 4.8M Oz Ag and 150K Oz Au at Loma Bonita deposit. “Azure accepted a first offer proposal to lock-in all Teck’s rights and interest in the project by issuing Teck more than 27.5 million shares – effectively bumping Teck’s stake in Azure to 19.9%”. Teck also will retain a 0.5% NSR over Alacran project.
  • Consolidated Zinc Limited, announced that the Federal Court of Mexico has ruled in its favour on the land use agreement dispute with the local ranch owner, cancelling the prior appeal Court of Chihuahua which had ruled in favour of the landowner. The company continues to operate freely at its Plomosas mine and in accordance with the agreement.
  • Minera Alamos Inc., announced the closing of the Guadalupe de Los Reyes option in Sinaloa, and the acquisition of 9.45M of common shares of Prime Mining Corp. It represents 16.1% of the outstanding common shares of Prime. Following the transaction, Minera Alamos also acquired warrants to purchase up to 3.35M additional common shares of Prime with the closing date being December 28th, 2019.
  • Newmont Goldcorp Corporation, announced successful completion of consent solicitation for its 5.875% notes due 2035. “Holders of approximately $575,330,000 (95.89%) in aggregate principal amount of the outstanding notes had validly delivered (and not validly revoked) their consent to the amendments. The company will pay, a cash payment equal to $33.33 per $1,000 aggregate principal amount of the notes for which holders had validly delivered (and not validly revoked) their consent to the amendments on or prior to the expiration date (August 23, 2019). The company intends to pay the consent fee on August 28, 2019”.

ON SOCIAL RESPONSIBILITY

  • No relevant news

Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.

On the picture above, flow-banded rhyolite in a prospect in Guanajuato, Mexico.  Photo by Miguel A Heredia.

 

The Mining and Exploration News in Mexico: Highlights on the Fifth Week of July, 2019.

Cervantite crystals in jasperoids

By Miguel A Heredia

During the thirty one week of the year (July 29th to August 4th, 2019), at least 37 press releases were announced by companies working in Mexico, with twelve communicating production results, nine disclosing deals and corporate issues, six announcing financial rounds, five reporting on resources and development of their projects, two informing on exploration results, and one commenting on Mexican issues.   ON MEXICO ISSUES, Mexican president, Andres Manuel Lopez Obrador, declared that the mining sector will face several legislative and state government proposals to tighten environmental restrictions and raise taxes.   ON EXPLORATION, In Jalisco, GoGold released drilling results from four new holes at its Los Ricos project, and Silver Spruce confirmed high grade Au mineralization at its Cocula project. ON MINING, Alamos Gold, Americas Silver, Azure, Capstone, Consolidated Zinc, Excellon, Fresnillo, Leagold, McEwen, Newmont Goldcorp, Santacruz, and Starcore reported production and financial results from their Mexican mining operations. ON FINANCING, Avino, Chesapeake, Great Panther, Millrock, Sonoro and VVC announced financial rounds. ON RESOURCES AND DEVELOPMENT, Capstone provided an update on the development of its one-way ramp system at Cozamin mine in Zacatecas, to increase Cu output by the end of 2020. It also initiated a large in-fill drilling program to reserve conversion. Goldplay announced drilling results from the first hole drilled at the Faisanes target, adjacent to the western edge of its San Marcial NI43-101 resource in Sinaloa.  Pan American Silver announced results from the exploration drilling completed over the past three months at its La Colorada mine in Zacatecas. Silver Bull provided results from five new holes drilled to test possible extensions at depth to the main deposit at its Sierra Mojada project in Coahuila. Sonoro filed a technical report on its Cerro Caliche project in Sonora, to present an estimate of mineral resources. SSR Mining commented that is reviewing drill programs and engineering studies to identify additional zones and continuity of high-grade mineral resources at its Pitarrilla project in Durango. ON DEALS AND CORPORATE ISSUES, Starcore entered into an agreement covering the sale of its processing facility in Matehuala, San Luis Potosi. Aztec Minerals completed the terms of its earn-in and exercised its option to acquire 65% interest in the Cervantes project in Sonora.   Bacanora Lithium provided an update on the strategic investment by Ganfeng Lithium (Sonora Lithium project, Sonora).  Discovery Metals completed the acquisition of Levon Resources (Cordero project, Chihuahua).  One World Lithium announced the engagement of Montgomery and Associate to assist them as consultant on its Salar del Diablo project in Baja California Norte. Sierra Metals announced management changes (Bolivar mine, Chihuahua). Gold Resource declared July monthly dividend to its shareholders (El Aguila mine, Oaxaca). Peñoles stock sinked more than 10% in the Mexican Stock Exchange.

 ON MEXICO ISSUES

  • Mexican president Andres Manuel Lopez Obrador, declared that the mining sector will face several legislative and state government proposals to tighten environmental restrictions, raise taxes, regularize rights payments and give greater voice and vote to communities where companies have or intend to establish extraction projects. Fernando Alanis Ortega, president of CAMIMEX and general director of Industrias Peñoles commented that “there have been complicated initiatives that show a deep ignorance of what our sector is. It is important to have more executive work within the legislature to have a better coordination in the initiatives”.

ON EXPLORATION

  • GoGold Resources Inc., released drilling results of new four holes from the ongoing drilling program at its Los Ricos project in Jalisco. To date, 41 holes have been drilled for a total of 5,522m. Significant intersections were encountered in hole LRGG-19-18 (the deepest hole to intersect Los Ricos vein to date) with 21.4m of 0.81 g/t Au and 170 g/t Ag (3.08 g/t AuEq), including 12.9m of 1.24 g/t Au and 262 g/t Ag (4.74 g/t AuEq), including 7.5m of 1.78 g/t Au and 342 g/t Ag (6.35 g/t AuEq); hole LRGG-19-019 with 4.5m of 1.5 g/t Au and 197 g/t Ag (4.13 g/t AuEq, followed by 2.2m of open stope, to continue with 13.8m of 0.63 g/t Au and 86 g/t Ag (1.78 g/t AuEq), including 4.2m of 1.52 g/t Au and 198 g/t Ag (4.17 g/t AuEq); hole LRGG-19-020 with 14.9m of 1.78 g/t Au and 106 g/t Ag (3.2 g/t AuEq), including 7m of 3.48 g/t Au and 156 g/t Ag (5.55 g/t AuEq); and hole LRGG-19-021 with 7.5m of 0.09 g/t Au and 18 g/t Ag (0.33 g/t AuEq), followed by 6m of open stope, to continue with 15.6m of 1.15 g/t Au and 113 g/t Ag (2.67 g/t AuEq), including 6.5m of 2.38 g/t Au and 236 g/t Ag (5.54 g/t AuEq). GoGold plans to complete 10,000m of drilling at the property.
  • Silver Spruce Resources Inc., received results from a first set of fifteen RC drilling samples and from a second set of eight surface samples and four RC samples for due diligence purposes to confirm grades reported previously by Timmins Gold (now Alio Gold) at the advanced Au Cocula project in Jalisco. Re-assays showed a good correlation with those results reported previously by Timmins.

ON MINING

  • Alamos Gold Inc., presented production and financial results for the period Q2, 2019 from their Mulatos and Chanate mines in Sonora. At its Mulatos mine, the company processed 2,107,590 tonnes of 0.94 g/t Au to produce 36.3K Oz Au and sold 40.12K Oz Au. Sale cost per Oz Au produced was $725 for an AISC of $1,257 per Oz Au. At its Chanate mine (transitioned to residual leaching in October, 2018), Alamos produced 4,400 Oz Au and sold 4,376 Oz Au. Production cost was $1,234 USD per Oz Au for an AISC of $1,257 per Oz Au. The company expects to produce 150K-160K Oz Au at Mulatos mine and over 15K-25K Oz Au at El Chanate during 2019.
  • Americas Silver Corporation, announced Q2, 2019 production and operating cost results from its Cosala mine operation in Sinaloa. It processed 156,998 tonnes of 49 g/t Ag to produce 145.4K Oz Ag, 11.15M Lb Zn, and 4M Lb Pb (1.3M Oz AgEq), at a cash cost of $18.27 per Oz Ag and AISC of 11.66 per Oz Ag.
  • Azure Minerals Limited, reported that during Q2, 2019 over 1,200 tonnes of ore have been mined and stockpiled from its Oposura project in Sonora, with an estimated grade to be between 10-15% combined Zn+Pb. Ore will be processed under a toll treatment agreement through the nearby San Javier sulphide flotation processing facility. Ore transport will start in August and processing is expected to start in September.
  • Capstone Mining Corp., released production and financial results for the period Q2, 2019 from its Cozamine mine in Zacatecas. Capstone milled 284K tonnes of 1.48% Cu, 0.96% Zn, and 45 g/ton Ag to produce 8.72M Lb Cu, 3.84M Lb Zn, and 323K Oz Ag. Metallurgical recoveries were 94.1% for Cu, 64.2% for Zn, and 77.3% for Ag. Site operating cost was $47.71 per tonne milled, with cash cost of $1.06 per Lb Cu produced. The company reported revenue of $24.3M for an EBITDA of $9.3M.
  • Consolidated Zinc Limited, reported Q2, 2019 production and financial results from its Plomosas mine in Chihuahua. It mined 15,881 tonnes of 14.8% Zn, 6.7% Pb, and 35 g/t Ag, and processed 10,273 tonnes of 13.2% Zn, 4.7% Pb, and 35 g/t Ag, for a total of 3M Lb Zn, 1M Lb Pb, and 11.6K Oz Ag contained. From this total metal contained, only 1.3M Lb Zn, 334K Lb Pb, and 4KOz Ag was sold with cash cost of $0.78 per Lb Zn produced. 742 tonnes of Zn concentrate and 246 tonnes of Pb concentrate were stockpiled and will be available for sale at June 30, 2019.
  • Excellon Resources Inc., presented Q2 and H1, 2019 production and financial results from its La Platosa mine in Durango. It processed 19,964 tonnes of 514 g/t Ag, 5% Pb, and 7.4% Zn during Q2, 2019 for a total of 38,183 tonnes of 523 g/t Ag, 5% Pb, and 7.7% Zn in H1, 2019. Total production in Q2, 2019 was 276.8K Oz Ag, 1.8M Lb Pb, and 2.8M Lb Zn (583K Oz AgEq), for a total of 537.2 Oz Ag, 3.14M Lb Pb, and 4.5M Lb Zn (1M Oz AgEq) during the period H1, 2019. Excellon reported a production cost of $304 and $204 per tonne for Q2 and H1, 2019 respectively. Cash cost per Oz Ag produced was $9.18 and 10.06 for the periods Q2 and H1, 2019 respectively, with an AISC per Oz Ag payable of $16.89 and $19.82 respectively. The company had revenues for $8.67M and $13.85M for the periods Q2 and H1, 2019 respectively.
  • Fresnillo plc., announced consolidated production and financial results for the period H1, 2019 from their Mexican operations. Fresnillo produced 27.56M Oz Ag (including a Ag stream production of 1,548 Oz Ag), 432.4K Oz Au, 56.4M Lb Pb, and 95M Lb Zn. Adjusted revenue of USD $1,069M were reported with an EBITDA of USD $307.9M for a total profit for the period of USD$ 70.9M. The company also presented production results by mine for H1, 2019. At Fresnillo mine, Zacatecas, 1,194,199 tonnes were processed with grades of 187 g/t Ag, 0.86 g/t Au, 0.85% Pb, and 1.5% Zn for a total of 6.4M Oz Ag, 25K Oz Au, 19.6M Lb Pb, and 26.8M Lb Zn. At Saucito mine, Zacatecas, Fresnillo processed 1,327,673 tonnes of 243 g/t Ag, 1.14 g/t Au, 0.9%Pb, and 1.6% Zn to produce 8.8M Oz Ag, 36.7K Oz Au, 23.4M Lb Pb, and 33.7M Lb Zn. At its Pyrites Plant, it processed 87K tonnes of 305 g/t Ag and 2.31 g/t Au to produce 638K Oz Ag and 2,315 Oz Au. At Cienega mine in Durango, the company processed 650,107 tonnes of 1.55 g/t Au, 163 g/t Ag, 0.6% Pb, and 1% Zn to produce 29.7K Oz Au, 2.9M Oz Ag, 5.2M Lb Pb, and 8.6M Lb Zn. At the San Julian mine in Chihuahua-Durango border, Fresnillo processed 661,680 tonnes of 1.74 g/t Au and 120 g/t Ag from San Julian Veins to produce 35.3K Oz Au and 2.3M Oz Ag, while 1,107,875 tonnes were processed from the San Julian Disseminated Ore Body with grades of 0.08 g/t Au, 137 g/t Ag, 0.4% Pb, and 1.4% Zn, to produce 1,143 Oz Au, 4.2M Oz Ag, 8.1M Lb Pb, and 25.9M Lb Zn. Total production at San Julian was 36.4K Oz Au and 6.5M Oz Ag. At its Noche Buena mine in Sonora, the company processed 6,575,328 tonnes of 0.53 g/t Au and 0.2 g/t Ag to produce 65.4K Oz Au and 29K Oz Ag.
  • Leagold Mining Corporation, reported production and financial results from its Los Filos mine in Guerrero for the period Q2, 2019. Leagold reported Au production and sales for 44.9K Oz Au and 47K Oz Au respectively, at a cash cost of USD $853 per Oz Au sold and AISC of USD $978 per Oz Au sold for an associated revenue of USD $59.9M. Au production and sales were 108.9K Oz Au and 112.9K Oz Au respectively for the period H1, 2019, for revenue of USD $144.1M and AISC of USD $846 per Oz Au sold.
  • McEwen Mining Inc., announced production and financial results from its El Gallo mine in Sinaloa for the period Q2, 2019. The company produced 5.4K GEOs (Au Eq ounces) at cash cost of USD $967 per Oz Au and AISC of USD $989 per Oz Au produced. Total production in H1, 2019 reached 23K GEOs at cash cost of USD $724 per Oz Au and AISC of USD $776 per Oz Au produced.
  • Newmont Goldcorp Corporation, announced Q2, 2019 production and financial results from its Peñasquito mine in Zacatecas. It produced 165K GEOs, 245M Lb Zn, 180M Lb Pb, and 25M Oz Ag at cash cost of USD $820 per Oz Au and AISC of USD $1,095 per Oz Au produced.
  • Santacruz Silver Mining Ltd., presented Q2, 2019 production results from their Veta Grande mine in Zacatecas and El Rosario mine in San Luis Potosi. At Veta Grande mine, Zacatecas, it processed 37,156 tonnes of 101 g/t Ag, 0.21 g/t Au, 1.1% Pb, and 2.1% Zn, to produce 73K Oz Ag, 138 Oz Au, 826.5K Lb Pb, and 1.36M Lb Zn for a total of 240.2K Oz AgEq. At El Rosario mine in San Luis Potosi, the company processed 20,789 tonnes of 74 g/t Ag, 0.28 g/t Au, 0.4% Pb, and 2.1% Zn to produce 46.1K Oz Ag, 116 Oz Au, 194.9K Lb Pb, and 844.5K Lb Zn for a total of 133.1K Oz AgEq.
  • Starcore International Mines Ltd., reported year end dated April, 30, 2019 production and financial results from its San Martin mine in Queretaro. Starcore milled 301.9K tonnes with grades of 1.63 g/t Au and 86 g/t Ag with metallurgical recoveries of 86.2% and 58.4% respectively, to produce 13.7K Oz Au and 224.5K Oz Ag at an operating cost of USD $58 per tonne and USD $1,081 per Oz Au produced. Total revenues of CAD $32.8M were obtained, including CAD $5.7M of purchased concentrate processing revenue.

ON FINANCING

  • Avino Silver & Gold Mines Ltd., closed a bought deal financing for aggregate gross proceeds of CAD $6M. Net proceeds will be used to advance the exploration and development of its Avino mine in Durango.
  • Chesapeake Gold Corp., announced that it entered in a bought deal private placement financing for gross proceeds of $12M. In addition, Chesapeake also entered into a non-brokered private placement for gross proceeds of $3M (Metates project, Durango).
  • Great Panther Mining Limited, entered in a bought deal financing agreement for gross proceeds of approximately $15M. In addition, Great Panther granted an over-allotment option for gross proceeds of $2.25M (Topia mine, Durango).
  • Millrock Resources Inc., closed the first tranche of a non-brokered private placement for gross proceeds of $1M (Guadalcazar project, San Luis Potosi).
  • Sonoro Metals Corp., completed a non-brokered private placement for gross proceeds of $750K (Cerro Caliche project, Sonora).
  • VVC Exploration Corporation, announced a non-brokered private placement to intend to raise up to CAD $2.5M. Proceeds will be used to pay for exploration and development of its Samalayuca project in Chihuahua, land use permits and associated costs, metallurgical bench testing of copper mineralization, and proposed pilot mining investigation and evaluation process.

 ON RESOURCES AND DEVELOPMENT

  • Capstone Mining Corp., announced that the development of the one-way ramp system is on schedule for completion by the end of 2020, which is expected to increase copper output by 30% to between 40 to 45M Lb per annum. In addition, Cozamin initiated a large in-fill definition drilling program during the quarter that will target resource to reserve conversion to support a doubling of Cozamin’s mine life.
  • Goldplay Exploration Ltd., reported results from the first hole drilled at the Faisanes target, immediately adjacent to the western edge of its San Marcial NI43-101 resource in Sinaloa. Hole SM-19-01 intersected 1m of 204.6 g/t Au and defined a new Au mineralized zone close to surface. Goldplay is actively focused on surface and drilling exploration along the 600 m long Faisanes zone.
  • Pan American Silver Corp., provided results from the exploration drilling completed over the last three months at its la Colorada mine in Zacatecas. The drilling program covered an area of 600m by 300m and delineated skarn/manto zones that are still open laterally and at depth. Four drill rigs operating underground and three drill rigs on surface have completed 11,300m of infill and step-out drilling in the last three months, bringing the total meters drilled to date to 31,000m. Significant drill intersections were encountered in hole U-51-19 with 109 g/t Ag, 0.38% Cu, 1.7% Pb, and 3.8 % Zn over 114m, including 158g/t Ag, 0.59%Cu, 2.6% Pb, and 5% Zn over 58.2m ; hole  U-46-19 with 55 g/t Ag, 0.22% Cu, 3.8% Pb, and 6.6% Zn over 126m, including 74 g/t Ag, 0.44% Cu, 5.4% Pb, and 10.3% Zn over 32.9m; hole U-42-19 with 40 g/t Ag, 0.17% Cu, 1.2% Pb, and 2.8% Zn over 214.2m, including 75 g/t Ag, 0.33% Cu, 3.4% Pb, and 3.5% Zn over 38.3m; hole U-37-19 with 28 g/t Ag, 0.11% Cu, 1.9% Pb, and 3.9% Zn over 45.8m, including 36 g/t Ag, 0.08% Cu, 3.2% Pb, and 3.7% Zn over 18.1m; hole U-35-19 with 41 g/t Ag, 0.3% Cu, 0.9% Pb, and 4% Zn over 82.6m; hole U-29-19 with 67 g/t Ag, 0.23% Cu, 1.5% Pb, and 4.5% Zn over 18.8m; hole U-22.19 with 42 g/t Ag, 0.05% Cu, 0.8% Pb, and 3.9% Zn over 104.7m and 64 g/t Ag, 0.28% Cu, 2% Pb, and 5.8% Zn over 15.1m. Pan American plans to complete 50,000m of drilling and review 12,000 km magnetotellurics geophysics survey to better define the skarn footprint limits.
  • Silver Bull Resources Inc., provided results from five holes drilled to test possible extensions at depth of its Sierra Mojada deposit in Coahuila. Significant intersections were encountered in hole B19005 with 9% Zn, 2.1% Pb, and 16 g/t Ag over 13.25m of massive sulphide mineralization, including 11.9% Zn, 2.8% Pb, and 24 g/t Ag over 5.85m: hole B19004 with 8.1%Zn, 1.8% Pb, and 27 g/t Ag over 46.23m, including 8.1% Zn, 1.8% Pb, and 27 g/t Ag over 0.87m: hole B19006 with 7.2% Zn, 1.2% Pb, 195 g/t Ag, and 0.13% Cu over 0.85m. These drill holes are part of an 8,000m surface drilling program to test extensions of the main deposit at Sierra Mojada, Coahuila.
  • Sonoro Metals Corp., filed a NI43-101 technical report on its Cerro Caliche project in Sonora in which reported inferred resources of 11,470,000 tonnes of 0.49 g/t Au and 4 g/t Ag (or 0.55 g/t AuEq) to contain a total of 183K Oz Au and 1.6M Oz Ag (or 201K Oz AuEq). “The estimate of mineral resources is based on a total of 21,091 meters of RC drilling in 200 holes. Of these, 10,328m in 96 holes were drilled by Sonoro, plus 7,725m in 86 holes were drilled by Corex Gold and 3,038m in 18 holes were drilled by Paget Southern, both previous operators of the Cerro Caliche project”.
  • SSR Mining Inc, informed that is reviewing drill programs and engineering studies to identify additional zones and continuity of high-grade mineral resources at its Pitarrilla project in Durango. It is also evaluating contractors to extend the existing underground access and drill these areas.

 ON DEALS AND CORPORATE ISSUES

  • Starcore International Mines Ltd., entered in an agreement to cover the sale of its subsidiary Altiplano Goldsilver SA de CV, which owns the processing facility in Matehuala, San Luis Potosi. Terms of the transaction includes a deposit of USD $0.5M; a payment of USD $0.5M on August 31, 2019; a payment of USD $200K on November 30, 2019; a payment of USD $200K on February 28, 2020; and a final payment of USD $200K on May 31, 2020. In addition, Starcore informed that reduced its staff by 125 people at its San Martin mine in Queretaro. It will incur in severance cost of USD $600K related to the staff reduction.
  • Aztec Minerals Corp., completed the terms of its ear-in and exercised its option to acquire 65% interest in the Cervantes project in Sonora from Kootenay Silver Inc. Both companies expect to finalize the terms of the JV agreement shortly and form a management committee to review the exploration results to date and approve the next exploration program and budget at Cervantes.
  • Bacanora Lithium plc., provided an updated on the strategic investment by Ganfeng Lithium (GFL) to participate at the Sonora Lithium operation. GFL will acquire 29.99% of Bacanora, and 22.5% of the Sonora Lithium project in Sonora.
  • Discovery Metals Corp., completed the acquisition of Levon Resources Ltd. Based on the agreement, the shareholders of Levon received 0.55% of a common share of Discovery. “Effective on the closing of the Arrangement, there were approximately 168M Discovery shares issued and outstanding (including the conversion of the Subscription Receipts, as described below, and the issuance of 64,412,929 Discovery Shares issued to Levon shareholders pursuant to the Arrangement), and Discovery’s market capitalization is approximately $66M, based on Discovery’s closing price on the TSX Venture Exchange on August 1, 2019”.
  • One World Lithium Inc., announced the engagement of Montgomery and Associates to consult with the company on its exploration program at its Salar del Diablo project in Baja California Norte.
  • Sierra Metals Inc., announced management changes after the departure of its COO (Bolivar mine, Chihuahua).
  • Torex Gold Resources Inc., amended and restated a USD $400M debt facility with bank institutions.  This debt facility is comprised of USD $185M term loan, and USD $150M revolving loan facility. All conditions precedent to the initial advance under the debt have been satisfied as of July 30, 2019, and at that date, the full amount of the term facility and USD $100M of the revolving facility is outstanding ( El Limon-Guajes Mining Complex, Guerrero).
  • Gold Resource Corporation, declared July monthly dividend of 1/6 of a cent per common share to its shareholders (El Aguila mine, Oaxaca).
  • Industrias Peñoles SA de CV, informed that its stock plummeted 58 % in the Mexican Stock Exchange after reporting losses in Q2, 2019 due to the fall of metal prices and production cost increase. The company’s operating flow collapsed 58.4% in said period 2019 against the same period of 2018. Metal operations showed a decrease in volumes: Pb production fell 13.8%, Au 8.8 %, and Ag 4.5%. The exception was Zn, where production grew 15.1%.

Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.

On the picture above, cervantite crystals after stibnite in jasperoids in a prospect in Durango, Mexico.  Photo by Miguel A Heredia.