The Mining and Exploration News in Mexico: Highlights on the Fourth Week of May, 2021

By Jorge Cirett

During the 21st week of the year (May 24th to May 30th, 2021), at least 33 press releases were announced by companies working in Mexico. To note, seven companies posted exploration advances on their properties, three presented mining related news, seven posted on financing (C$6M, $60 M, C$5 M, C$10 M, $2.6 M, $C$11.5 M) and one on share distribution, six more on project development or resource definition and two posted on corporate issues. ON MEXICO ISSUES, CanCham complained on the lack of clear policies and opacity on the rule of law that are affecting Canadian investments in Mexico.  The push from the Mexican government to create an institution to manage the lithium industry from the optics of sovereignty sees opposition from the mining industry, and reality. Camimex released a list of mining investments to be realized in the next few years, amounting to several billion dollars. ON EXPLORATION, in Sonora, Ridgestone Mining applied for drilling permits at Rebeico. Tocvan Ventures released results from drilling at Pilar. In Chihuahua, Kootenay Silver released high-grade results from drilling at Columba. In Durango, Mithril Resources, updated on drilling at Copalquin. In Sinaloa, Riverside Resources released surface sample results; Vizsla Silver informed on geophysical results supported by drilling, and more surveys to come; Brigadier Gold discovered bulk tonnage copper mineralization in trenching of soil anomalies. ON MINING, Impact Silver and Telson Mining presented Q1 2021 results. Magna Gold informed it has exceeded 3 M man-hours of work without lost-time incidents. ON FINANCING, Silver Bull Resources is to distribute 34.2 M shares of Arras Minerals among its shareholders. Six companies informed on financing rounds: Silver Viper Minerals (C$6 M), Vizsla Silver ($60 M), Reyna Silver (C$5 M), Sable Resources (C$10M, Defiance Silver (C$11.5 M) and Mammoth Resources ($2.58 M). ON RESOURCES AND DEVELOPMENT, Prime Mining released drilling results from Los Reyes. GR Silver Mining reported near surface drill results from Plomosas. GoGold Resources released drilling results from the Casados deposit at Los Ricos North. Discovery Silver released results from 12 drill holes targeting high-grade vein trends at Cordero. Sailfish Royalty filed a technical report with a new resource estimate for Gavilanes. Discovery Silver updated on exploration at Cordero, with 75,000 m of drilling completed on 178 holes, and four drills continuing the phase 2 program. Golden Tag announced the discovery of a shallow zone of epithermal mineralization at San Diego.   ON DEALS AND CORPORATE ISSUES, Mexus Gold informed Fresnillo PLC is reviewing its Santa Elena mine. Riverside Resources announced BHP is funding a third year of generative work in Sonora. ON SOCIAL RESPONSIBILITY, Peñoles and Fresnillo PLC informed on their policies and programs to aid in education on a wide range of communities. Minera San Xavier informed Cerro San Pedro in San Luis Potosi has been declared as “Cyanide Free Site” by the International Cyanide Management Institute.

ON MEXICO ISSUES

  • CanCham (Cámara de Comercio de Canadá en México) pointed out that the lack of clear policies and the opacity on rule of law is affecting Canadian investments, which show an 18% decrement in the last year, holding the investment of thousands of millions (Mexican number notation) of dollars in the energy, mining, pharmaceutical and agricultural sectors. These remarks were expressed by Enrique Zorrilla, Cancham’s president, in the meeting between the Commerce ministers of Mexico, Canada and the United States.
  • Mexico is preparing its strategy to develop the lithium market. The federal government intends to become a lithium producer by controlling several deposits, Bolivia’s advice and a commerce treatise to facilitate establishing an electric battery factory. The current government senate fraction is preparing a proposal to create the Instituto Nacional del Litio. (Lithium National Institute) and to declare lithium as Nation’s exclusive property (Note. – This federal initiative push misses the point that so far there is not a single lithium mine in Mexico, that its lithium in brines potential is limited at best, and that the economics of lithium extraction from clays -like in the Bacanora Lithium’s deposit in Sonora- is not yet clear).
  • Fernando Alanís, president of Camimex (Cámara Minera de México) informed that lithium deposits in Mexico have a very low grade, and lack the technology for its extraction, reason for which the country is far from becoming a world power in lithium production. Lithium presents in three kind of deposits: hard rock (pegmatites), brines (from salt lakes) and clays. Rock and brine lithium extraction accounts for 100% of the world production, whereas the extraction of lithium from clays is very energy intensive and expensive, not having a single producing mine in the entire planet.
  • Camimex released a table with the Mexican Mining Developments programmed for the next few years, same that reach US$7,820 Million in investment (Mexican number notation, equivalent to US$7.8 billion).

ON EXPLORATION

  • Mithril Resources Ltd. provided an update on drilling at its Copalquin project in Durango. The current program main focus is to extend the Refugio ore shoot down dip (presently 600 m along strike, 200 m down dip, 5 m in width), maiden drilling at Los Pinos target, extend three holes and deep exploration drilling at La Soledad and extend near-surface intercepts at El Cometa.
  • Ridgestone Mining Inc. commenced permitting for drill programs at Guadalupe y Calvo, Chihuahua, and Rebeico, Sonora.
  • Riverside Resources Inc. reported surface sample results from its La Silla project in Sinaloa. The highlighted samples from the El Ciruelo and El Roble targets returned 6.1 gpt Au, 80 gpt Ag; 5.6 gpt Au, 81 gpt Ag; 4.4 gpt Au, 35 gpt Ag; 3.5 gpt Au, 26 gpt Ag; 3.3 gpt Au, 20 gpt Ag; 2.6 gpt Au, 41 gpt Ag, on quartz veining, gossanous breccia and strongly oxidized andesite. El Ciruelo target extends for at least 1 km with a 1-5 m wide chalcedonic vein zone. El Roble vein extends for at least 300 m, reaching up to 2 m in width, with mineralization occurring also in the host rock.
  • Vizsla Silver Corp. provided an update on the recently completed geophysical survey completed at Panuco, in Sinaloa. A fixed loop electromagnetics (FLEM, or EM) was trialed and detected massive sulfide mineralization on the Napoleon and Josephine veins, proved with three massive sulfide intercepts in the latter. The Josephine vein has no known surface expression and runs parallel to the west of the main Napoleon trend. Mineralization at Tajitos is not related to massive sulfides and was not detected with EM. Vizsla is planning a property wide airborne EM-magnetic survey at Panuco.
  • Kootenay Silver Inc. announced high-grade results from the 5,000 m core drill program currently underway at Columba, Chihuahua. Highlighted core length intervals in the Hanging-Wall, F, and Footwall veins comprise 1.55 m @ 189 gpt Ag, 0.1%Pb, 0.2% Zn; 1.0 m @ 104 gpt Ag, 0.1% Zn; 2.44 m @ 217 gpt Ag, 0.1% Pb, 0.1% Zn; 2.94 m @ 321 gpt Ag, 0.2% Pb, 0.6% Zn (including 1.94 m @ 428 gpt Ag, 0.3% Pb, 0.7% Zn); 8.0 m @ 130 gpt Ag, 0.1% Pb, 0.2% Zn (including 2.9 m @ 265 gpt Ag, 0.1% Pb, 0.5% Zn); 1.95 m @ 104 gpt Ag, 0.1% Pb, 0.1% Zn; 9.0 m @ 354 gpt Ag, 0.1% Pb, 0.4% Zn (including 2.63 m @ 809 gpt Ag, 0.3% Pb, 0.4% Zn); 30.0 m @ 86 gpt Ag (including 2.37 m @ 425 gpt Ag, 0.2% Zn).
  • Brigadier Gold Ltd. announced the discovery of bulk tonnage type copper mineralization at its Picachos project in Sinaloa. Fifty meters on trenching of historic copper anomalies has returned XRF copper values ranging from 0.05 to 1.34% Cu and 20 to 284 ppm Ag. Brigadier has also completed mapping and sampling of the historic La Gloria mine, where a drill hole intercepted 1.0 m @ 6.26 gpt Au.
  • Tocvan Ventures Corp. released results for the first three holes of its phase-II drill program at Pilar, in Sonora. The drill program consists of 2,900 m of reverse circulation drilling in 17 holes, of which 14 are pending results. Highlighted down-hole intercepts comprise 29 m @ 0.71 gpt Au (including 6.1 m @ 1.9 gpt Au); 24.4 m @ 0.56 gpt Au (including 9.2 m @ 1.3 gpt Au, 14 gpt Ag); 6.1 m @ 0.48 gpt Au, 4 gpt Ag; 4.6 m @ 0.50 gpt Au, 11 gpt Ag.

ON MINING

  • Impact Silver Corp. presented its financial and operating results of Q1 2021. During the period 36.4 K tonnes were processed @ 162 gpt Ag to produce 156.9 K Oz Ag. “continued exploration on the north and south extensions of the Veta Negra Mine, trenching on the bulk tonnage gold target at Manto America in the central part of the district and exploration on the northwest (Pachuqueno) extensions of the Guadalupe Mine”.
  • Magna Gold Corp. has exceeded 3 M man-hours of work without lost-time incidents within all its operations, including contractors and suppliers. The last lost-time incident was in 2018, and the mine has not had a fatal accident in its 11 years history.
  • Telson Mining Corp. presented its first quarter 2021 financial and operating results. At Campo Morado in Guerrero, 174.4 K tonnes were processed to produce 11,013 tonnes Zn (74% Zn recovery), 1,908 tonnes Pb at cash cost $0.70 per Lb Zn and AISC of $0.90 per Lb Zn. During the period gross revenue was $21.2 M (Q1 2020: $19.0 M) and mine operating profit $5.25 M (Q1 2020: $0.26 M loss).

ON FINANCING

  • Silver Bull Resources Inc. announced its intent to distribute 34.2 M shares of Arras Minerals Corp. to Silver Bull shareholders. Silver Bull transferred mineral properties in Kazakhstan and received 36 M shares of Arras in return, making Arras an approximately 88%-owned subsidiary of Silver Bull (Sierra Mojada, Coahuila).
  • Silver Viper Minerals Corp. intends to undertake a non-brokered private placement financing to raise aggregate gross proceeds of up to C$6 M (La Virginia, Sonora).
  • Vizsla Silver Corp. entered into an agreement with Canaccord Genuity Corp. on behalf of a syndicate of underwriters to buy units of the company for gross proceeds of $60 M (Panuco, Sinaloa).
  • Reyna Silver Corp. entered into an agreement with Eight Capital and Red Cloud Securities Inc. in connection with a private placement intended to raise up to C$5 M (Guigui and Batopilas, Chihuahua).
  • Sable Resources Ltd. entered into an agreement with Sprott Capital Partners LP and Eight Capital in connection with a bought deal private placement financing to raise up to C$10 M (Vinata, Chihuahua).
  • Mammoth Resources Corp. Announced a non-brokered private placement financing aiming to raise up to $2 M, same that by the next day had been increased to $2.58 M (Tenoriba, Chihuahua).
  • Defiance Silver Corp. has increased the size of its previously announced private placement with Red Cloud Securities Inc. for gross proceeds of up to C$11.5 M (Bolañitos and Pinguico, Guanajuato).

ON RESOURCES AND DEVELOPMENT

  • Prime Mining Corp. released additional results from its ongoing 15,000 m drill program at Los Reyes, Sinaloa. The Highlighted true width intercepts are from the Guadalupe East, Zapote South and the Estaca vein: 11.6 m @ 8.12 gpt Au, 725 gpt Ag; 5.6 m @ 11.95 gpt Au, 1,221 gpt Ag; 2.1 m @ 21.63 gpt Au, 1,960 gpt Ag; 2.0 m @ 11.17 gpt Au, 909 gpt Ag; 2.4 m @ 2.00 gpt Au, 121 gpt Ag; 1.4 m @ 10.50 gpt Au, 300 gpt Ag; 3.9 m @ 0.45 gpt Au, 37 gpt Ag; 0.6 m @ 93.80 gpt Au, 829 gpt Ag.
  • GR Silver Mining Ltd. reported near surface drill results from the Plomosas mine area in Sinaloa. Highlighted true width intervals comprise 11.9 m @ 84 gpt Ag, 2.3% Pb, 2.7% Zn, 0.1% Cu; 16.7 m @ 7 gpt Ag, 0.22 gpt Au, 0.1% Pb, 0.3% Zn; 10.8 m @ 3 gpt Ag, 0.20 gpt Au, 0.1% Pb, 0.4% Zn; 4.2 m @ 10 gpt Ag, 0.09 gpt Au, 0.1%Pb, 0.6% Zn, 0.1% Cu; 2.1 m @ 350 gpt Ag, 1.0% Pb, 0.4% Zn; 1.9 m @ 348 gpt Ag, 0.3% Pb, 0.3% Zn; 1.3 m @ 26 gpt Ag, 0.19 gpt Au, 3.3% Pb, 3.3% Zn; 1.0 m @ 128 gpt Ag, 1.00 gpt Au, 9.0% Pb, 9.7% Zn, 0.2% Cu; 2.6 m @ 45 gpt Ag, 0.60 gpt Au, 3.0% Pb, 0.9% Zn; 4.7 m @ 187 gpt Ag, 0.18 gpt Au, 2.2% Pb, 1.2% Zn, 0.1% Cu; 2.0 m @ 277 gpt Ag, 0.22 gpt Au, 0.2% Pb, 0.4% Zn; 1.9 m @ 283 gpt Ag, 0.82 gpt Au, 0.3% Pb, 1.0% Zn, 0.1% Cu.
  • GoGold Resources Inc. released results of nine holes on the Casados deposit at the Los Ricos North project in Jalisco. Highlighted core length intersects comprise 29.9 m @ 0.25 gpt Au, 70 gpt Ag; 15.5 m @ 0.27 gpt Au, 67 gpt Ag; 34.4 m @ 0.17 gpt Au, 67 gpt Ag; 5.3 m @ 0.65 gpt Au, 305 gpt Ag; 9.2 m @ 0.24 gpt Au, 109 gpt Ag (including 1.9 m @ 0.61 gpt Au, 442 gpt Ag); 60.5 m @ 0.21 gpt Au, 44 gpt Ag; 2.1 m @ 0.57 gpt Au, 322 gpt Ag; 54.1 m @ 0.37 gpt Au, 92 gpt Ag; 28.5 m @ 0.43 gpt Au, 100 gpt Ag (including 1.8 m @ 2.09 gpt Au, 418 gpt Ag); 14.0 m @ 0.46 gpt Au, 134 gpt Ag (including 5.3 m @ 1.04 gpt Au, 304 gpt Ag); 2.6 m @ 2.93 gpt Au, 610 gpt Ag.
  • Discovery Silver Corp. released results from 12 diamond drill holes testing the Josefina and Todos Santos high-grade vein trends at the Cordero project in Chihuahua. Highlighted intercepts on the Josefina vein trend comprise 41.5 m @ 97 gpt Ag, 0.04 gpt Au, 1.0% Pb, 2.5% Zn (including 4.1 m @ 520 gpt Ag, 0.11 gpt Au, 3.0% Pb, 9.8% Zn and 3.3 m @ 182 gpt Ag, 0.09 gpt Au, 3.4% Pb, 7.1% Zn); 13.1 m @ 112 gpt Ag, 0.13 gpt Au, 1.3% Pb, 2.2% Zn; 36.4 m @ 66 gpt Ag, 0.10 gpt Au, 0.3% Pb, 1.0% Zn; 87.4 m @ 38 gpt Ag, 0.06 gpt Au, 0.2% Pb, 1.0% Zn; 3.6 m @ 343 gpt Ag, 0.11 gpt Au, 1.7% Pb, 2.7% Zn; 19.3 m @ 40 gpt Ag, 0.06 gpt Au, 0.7% Pb, 1.4% Zn); 22.4 m @ 156 gpt Ag, 0.10 gpt Au, 1.7% Pb, 2.3% Zn (including 3.7 m @ 299 gpt Ag, 0.16 gpt Au, 3.9% Pb, 5.7% Zn). The Josefina vein trend includes two subparallel veins that run for 1.5 km, and has been tested to 370 m depth and remains open. The Todos Santos vein trend consists of two closely spaced veins, extends for at least 1.5 km along strike and 400 m of depth in old workings and drill holes. Highlighted intercepts comprise 62.0 m @ 19 gpt Ag, 0.28 gpt Au, 0.1% Pb, 2.0% Zn; 21.4 m @ 46 gpt Ag, 0.07 gpt Au, 0.8% Pb, 1.3% Zn; 1.9 m @ 113 gpt Ag, 0.04 gpt Au, 2.4% Pb, 3.2% Zn; 3.7 m @ 96 gpt Ag, 0.07 gpt Au, 1.8% Pb, 3.0% Zn; 2.1 m @ 160 gpt Ag, 0.27 gpt Au, 3.3% Pb, 3.6% Zn.
  • Sailfish Royalty Corp. filed a NI-43-101 technical report and estimate of mineral resources for the Gavilanes project in Durango.
  • Discovery Silver Corp. updated on its Cordero project in Chihuahua and informed that by the end of the first quarter 2021 had cash and cash equivalents for $94.7 M. At Cordero 75,000 m of drilling were completed in 178 holes in phase 1 drilling, providing information to be used in the bulk-tonnage preliminary economic assessment (PEA) underway. Phase 2 drilling continues with four rigs, focused on reserve definition, resource expansion and high-grade vein delineation. Bulk tonnage targeted drilling has returned up to 128.2 m @ 65 gpt Ag, 0.05 gpt Au, 1.2% Pb, 1.3% Zn; 131.6 m @ 48 gpt Ag, 0.09 gpt Au, 0.5% Pb, 1.1% Zn (including 37.1 m @ 119 gpt Ag, 0.22 gpt Au, 1.0% Pb, 1.2% Zn); 110.0 m @ 37 gpt Ag, 0.04 gpt Au, 0.8% Pb, 1.0% Zn; 85.6 m @ 53 gpt Ag, 0.05 gpt Au, 1.4% Pb, 1.7% Zn. Drilling on high-grade veins has returned up to 4.1 m @ 520 gpt Ag, 0.11 gpt Au, 3.0% Pb, 9.8% Zn in the Josefina vein; 4.0 m @ 377 gpt Ag, 0.28 gpt Au, 7.1% Pb, 3.4% Zn in the Todos Santos vein and 4.4 m @ 246 gpt Ag, 0.39 gpt Au, 6.5% Pb, 0.4% Zn on the Parcionera vein.
  • Golden Tag Resources Ltd. discovered a new zone of epithermal mineralization at the San Diego project in Durango. The new drill hole intercepted 10.0 m @ 0.55 gpt Au, 628 gpt Ag, 1.1% Pb, 3.6% Zn, 0.12% Cu, in a zone where previous drilling had returned 2.0 m @ 0.33 gpt Au, 161 gpt Ag, 0.3% Pb, 0.2% Zn, 0.04% Cu; 3.75 m @ 0.32 gpt Au, 125 gpt Ag, 1.5% Pb, 4.0% Zn, 0.12% Cu. “The hole intersected a series of epithermal breccias and quartz-carbonate veins within the Central Diorite intrusion from 73.0 to 92.70 m which are characterized by cavity filling banded quartz and carbonate veins with fluorite and associated sulfides comprised primarily of pyrite, sphalerite, galena, boulangerite, and arsenopyrite”.

ON DEALS AND CORPORATE ISSUES

  • Mexus Gold US. informed personnel from Fresnillo PLC is reviewing its Santa Elena mine in Sonora. The geologists are checking the potential for a disseminated deposit, as well as the quartz vein currently worked by Mexus.
  • Riverside Resources Inc. announced BHP and Riverside “have agreed on moving forward with a third year of generative funding for copper exploration in Sonora. The new budget is US$1.3 M for generative exploration work.

ON SOCIAL RESPONSIBILITY

  • Peñoles and Fresnillo PLC informed on their policies and programs to aid on education in a widespread communities.
  • Minera San Xavier has been declared as “Cyanide Free Site” by the International Cyanide Management Institute. Cerro San Pedro is the first mine in the world that has realized the dismantling process of the 110 m high heap that covers 102 hectares (1 square kilometer).

Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group. On the image below:  Quartz-tourmaline breccia from a project in Sinaloa. Picture by Jorge Cirett.

The Mining and Exploration News in Mexico: Highlights on the Second Week of June, 2019

IMG_1079 - copia

By Jorge Cirett

During the 26th week of the year (June 24th to June 30th, 2019), at least 43 press releases were announced by companies working in Mexico. ON MEXICO ISSUES, a resolution by the Supreme Court is awaited to learn how the Mining Fund resources are to be allocated, if for social and environmental infrastructure (as planned) or as direct allocations to the people of the communities, the preferred method of the president (a method the opposition denounces as vote buying). In Sonora a local congressman introduced a bill for a new state tax on dirt extracted from open pits, a measure that if implemented is to pose a further weight in the already heavy fiscal load for mining companies in Mexico. Furthermore, the Economy Secretariat (Secretaria de Economia) published a letter stating that the “Protocol of Good Practice of Mining for the Public Consultation” (Protocolo de buenas practicas de la Minería para la consulta pública) is under review by the agency. It is not possible to underrate the importance of the review of this protocol, because if it is implemented incorrectly the result would impact fast and catastrophically the Mexican exploration industry. One of the more pressing issues is the fact that placing the consultation process before exploration takes place, would end most exploration in one swipe. If in doubt, just take a look to Oaxaca, where, although not being in the law you have to make the community consultation process before exploring, and the result is that hardly any exploration work is nowadays conducted in one of the states with the best mineralization potential in Mexico. Trust is hard to earn, let’s not throw it away so carelessly. ON EXPLORATION, In Zacatecas, Galore continues to drill at Dos Santos; Alien Metals updated on its exploration of Donovan 2 and Los Campos. ON MINING, Alien Metals released its financial results for 2018. ON FINANCING, Santacruz signed an agreement to extend the payment of a US$2.3 M loan. Galore is making a $1.5 M financing. Goldplay closed an oversubscribed financing for $1.37 M. Leagold completed a debt refinancing for a $200 M term loan and a $200 M revolving credit facility. ePower intends to conduct a private placement for Cdn$6 M. Sable granted 2.8 M incentive stock options. Alien Metals raised £350 K.  ON RESOURCES AND DEVELOPMENT, Mexus Gold  is to start leaching at Santa Elena, in Sonora. Telson reported significant underground channel sample results at Tahuehueto. Orla presented the result of the FS on Camino Rojo. Premier Gold presented results of its 42,000 m drilling campaign at Mercedes. Southern Silver file a technical report with updated resources on Cerro Las Minas. Santacruz presented results of drilling at Veta Grande. GoGold released results of drilling at Los Ricos. SilverCrest informed the decline has intersected the Babicanora vein at Las Chispas. Minera Alamos informed on the permitting of Santana. Almaden updated on permitting and legal issues at its Ixtaca project in Puebla. ON DEALS AND CORPORATE ISSUES, Millrock sold its Sonoran portfolio to Riverside. ePower Metals entered into a definitive agreement with Minera Alamos to acquire the Los Reyes project in Sinaloa. Silver Viper renegotiated much better terms on the lease of two properties within its La Virgina project in Sonora. Golden Minerals entered into an agreement under which Minera Autlan is to buy its Velardeña properties. Bacanora Lithoum signed an investment agreement and an offtake agreement with Ganfeng Lithium on its Sonora lithium project. Canasil and Pan American agreed on terms for the acquisition of Pan American of the Sandra Escobar project in Durango.

ON MEXICO ISSUES

  • The Economy Secretariat is awaiting the resolution of the Supreme Court on the change of rules to apply the Mining Fund, which this year is anticipated to be amounting to 3.2 billion pesos (3,200 millones) or approximately US$168.4 M. The proposal by the present Federal government (ie.- the president) is to deliver the resources directly to the people to “augment the capacities” of the mining communities. The aim would be to organize the community and the service providers to be part of the service chain for the mining industry. The resources on the Mining Fund to date are to be funneled according with the current rules, until a resolution by the Supreme Court clarifies the issue.
  • In Sonora, local congressman Carlos Navarrete from the Encuentro Social party (allied to the Morena party) introduced a bill for a new State tax on dirt extracted from open pits (includes waste, sand, dimension stone, clays, limestone, lime, among others). The US$0.63 tax per cubic metre of material would be split 80/20 between the municipalities and the State. The resources would be utilized in physical investments and infrastructure with social impact, in the environment and urban development (The bill intends to use the resources thus gathered in the same way that those of the Mining Fund were supposed to be used, and for which a 7% federal royalty tax was imposed on mining a few years ago. Now that the current president Andrés Manuel Lopez Obrador intends to use the resources of the Mining Fund for his preferred programs, allied politicians are trying to make the mining industry pay even more taxes).
  • The Economy Secretariat published a letter on the “Protocol of Good Practice of Mining for the Public Consultation”. In the letter the Economy Secretariat states that the protocol is under review by the agency. On the Letter: The consultation process is to be applied to all communities that can be impacted by the mining activity. Also, both exploration and exploitation should be consulted before their realization. The responsible authority is to be the Economy Secretariat, with aid by the Instituto Nacional de los Pueblos Indigenas and other authorities (SEMARNAT, CONAGUA, CFE, local municipal and state governments), as well as the state and federal Human Rights Commissions.

ON EXPLORATION

  • Galore Resources Inc. informed its 2,500 m diamond core drilling program at the El Alamo target of its Dos Santos project in Zacatecas continues to progress well. The first hole “intersected multiple zones of alteration and brecciation …… silicified and brecciated limestone similar to those observed on the surface over a much wider zone than was anticipated”.
  • Alien Metals Ltd. updated on its exploration activities at its Zacatecas properties Donovan 2, Los Campos and Don Celso. Sampling and mapping at Donovan 2 has resulted in high grade mineralisation in historic workings open along strike, and channel sample assays of up to 1.15% Cu and float samples of up to 0.45 gpt Au. Planned work includes a ground induced polarisation (IP) geophysical survey before the first phase of drilling. Surface mapping and sampling will be undertaken at Los Campos and Don Celso properties, as well as underground sampling and a geophysical survey at Los Campos.

ON MINING

  • Alien Metals Ltd. released its audited financial results for 2018. The company owns the Donovan 2, Los Campos, San Celso and La Africana projects in Zacatecas. The company held US$0.7 M in cash and cash equivalents by the end of the period.

ON FINANCING

  • Santacruz Silver Mining Ltd. reached an agreement to amend the repayment terms of the US$2.3 M short-term loan that it has borrowed from a private Bolivian mining company. The principal balance of US$2.3 million is now to be repaid by January 30, 2020. As consideration for the extension on the date of repayment Santacruz is to increase the issue of 2 M warrants to 2.5 M warrants (Veta Grande, Zacatecas).
  • Galore Resources Inc. is to commence a non-brokered private placement to raise gross proceeds of up to $1.5 M (Dos Santos, Zacatecas).
  • Goldplay Exploration Ltd. closed its over-subscribed previously announced financing, for gross proceeds of $1.37 M. A total of $28.9 K was paid and 231 K warrants were issued as a finder’s fee payment (San Marcial, Sinaloa).
  • Leagold Mining Corp. completed the debt refinancing with a syndicate of lenders that includes a $200 million term loan and a $200 million revolving credit facility. These loans have been used to replace $238 million of existing short-term debt, and will aid in the development of the Bermejal underground complex, the Guadalupe open pit and the CIL plant construction at it Los Filos mine in Guerrero.
  • ePower Metals Inc. intends to conduct a non-brokered private placement to raise up to Cdn$6 M (Los Reyes, Sinaloa).
  • Sable Resources Ltd. granted 2.8 M incentive stock options to certain officers, directors, employees and consultants of the company. Such options are exercisable at a price of $0.15 for a period of five years (Margarita and Vinata, Chihuahua).
  • Alien Metals Ltd. raised £350 K through the placement of shares (Donovan 2, Los Campos, Zacatecas).

ON RESOURCES AND DEVELOPMENT

  • Mexus Gold US. is to start leaching at its Santa Elena mine in Sonora (not to mistake for First Majestic’s Santa Elena mine, also in Sonora). Leaching is programmed to start on June 27th, with ore grading 1.8 gpt Au, 8 gpt Ag, to later on add ore @ 4 gpt Au, 12 gpt Ag. By September the company expects to be mining 3,500 tonnes per week.
  • Telson Mining Corp. reported significant channel sample assay results for underground mine development at its Tahuehueto project in Durango, where a 1,000 tonne per day mine is under construction. Highlighted results include: 2.42 m @ 5.76 gpt Au, 129 gpt Ag, 1.44% Cu, 3.8% Pb, 6.2% Zn; 5.50 m @ 3.31 gpt Au, 57 gpt Ag, 0.32% Cu, 0.9% Pb, 3.5% Zn; 5.38 m @ 4.41 gpt Au, 44 gpt Ag, 0.38% Cu, 1.5% Pb, 3.6% Zn; 7.0 m @ 5.12 gpt Au, 40 gpt Ag, 0.29% Cu, 1.0% Pb, 3.2% Zn; 6.45 m @ 5.69 gpt Au, 51 gpt Ag, 0.21% Cu, 2.3% Pb, 5.6% Zn; 4.42 m @ 8.70 gpt Au, 59 gpt Ag, 0.18% Cu, 1.7% Pb, 2.2% Zn; 4.08 m @ 9.27 gpt Au, 69 gpt Ag, 0.19% Cu, 0.6% Pb, 1.0% Zn; 3.56 m @ 7.95 gpt Au, 76 gpt Ag, 0.25% Cu, 3.3% Pb, 4.6% Zn. Individual assays are often above 5 gpt Au, and up to 28 gpt Au.
  • Orla Mining Ltd. presented the results of a feasibility study on its Camino Rojo Oxide project in Zacatecas. The main points include 18 K tonnes per day operation, with 44 M tonnes of ore to be put on the leach pad @ 0.73 gpt Au, 14.2 gpt Ag, containing 1 M Oz Au, 20.1 M Oz Ag. The expected recovery is 64% Au, 17% Ag, with an annual gold production of 97 K Oz Au at by-product cash cost $515 per Au Oz and an AISC of $576 per Au Oz. The after tax net present value (5%) is $142 M, with an after tax internal rate of return of 28.7% and a payback period of three years, all this in the case scenario of $1,250 per Au Oz price. The proven and probable mineral reserves stand at 44 M tonnes @ 0.73 gpt Au, 14.4 gpt Ag, whereas the measured and indicated resources amount to 353.4 M tonnes @ 0.83 gpt Au, 8.8 gpt Ag, containing 9.46 M Oz Au, 100.4 M Oz Ag. Inferred mineral resources are 60.9 M tonnes @ 0.87 gpt Au, 7.4 gpt Ag, containing 1.70 M Oz Au, 14.5 M Oz Ag.
  • Premier Gold Mines Ltd. presented exploration results of its 42,000 m drilling program at its Mercedes mine in Sonora. New mineralised veins have been confirmed at San Martin, opening the area 600 m to the west of the Lupita deposit. Drilling at San Martin returned multiple intercepts, including 7.2 m @ 4.64 gpt Au, 30 gpt Ag; 1.4 m @ 5.56 gpt Au, 38 gpt Ag. Ongoing delineation at Lupita includes intercepts of 3.9 m @ 10.3 gpt Au, 88 gpt Ag and 1.5 m @ 23.9 gpt Au, 71 gpt Ag. Exploration is to be activated at La Mesa area, adjacent to Agnico Eagle’s Santa Gertrudis project.
  • Southern Silver Corp. filed a NI-43-101 report with an updated mineral resource estimate for its Cerro Las Minas project in Durango (previously disclosed). The indicated resources amount to 11.1 M tonnes @ 105 gpt Ag, 0.1 gpt Au, 0.16% Cu, 1.2% Pb, 3.7% Zn, containing 37.5 M OZ Ag, 35 K Oz Au, 40 M Lb Cu, 303 M Lb Pb, 897 Lb Zn, Inferred mineral resources comprise 12.8 Mt @ 111 gpt Ag, 0.07 gpt Au, 0.27% Cu, 0.9% Pb, 2.8% Zn, containing 45.7 M Oz Ag, 31 K Oz Au, 76 M Lb Cu, 253 M Lb Pb, 796 M Lb Zn. “The overall objective of the 2019-20 exploration program is to continue to increase the existing resource base and to identify and drill test new epithermal vein systems within the larger claim package.”
  • Santacruz Silver Mining Ltd. released results from phase 1 of the current drilling program on the Veta Grande, Armados and Navidad veins on its Veta Grande project in Zacatecas. Highlighted true width intercepts comprise 0.55 m @ 761 gpt Ag, 0.2 gpt Au, 0.86% Pb, 1.84% Zn, 0.04% Cu; 1.94 m @ 65 gpt Ag, 0.75 gpt Au, 1.23% Pb, 3.84% Zn, 0.03% Cu at the Navidad vein; 2.40 m @ 227 gpt Ag, 0.88 gpt Au, 2.71% Pb, 2.64% Zn, 0.19% Cu; 1.59 m @ 280 gpt Ag, 0.61 gpt Au, 3.60% Pb, 3.24% Zn, 0.22% Cu.
  • GoGold Resources Inc. released results from two more diamond drill holes at its Los Ricos property in Jalisco. Highlighted intervals comprise 5.0 m @ 0.52 gpt Au, 161 gpt Ag; 6.3 m @ 2.14 gpt Au, 337 gpt Ag and 32.0 m @ 0.80 gpt Au, 179 gpt Ag, including 11.3 m @ 1.46 gpt Au, 348 gpt Ag. The 10,000 m HQ diamond drill program “is focused on defining the mineralized halo around the historical high grade ore shoots as defined by the underground workings and the 65 historical RC drill holes on the property”.
  • SilverCrest Metals Inc. informed the decline has intersected the Babicanora vein at the Las Chispas project in Sonora. The decline intersected the Babicanora vein and the newly identified Baby Vista vein, the first with 3.6 m true width and the second with 1.5 m true width. Additional highlighted infill results of the area 51 of the Babicanora vein include 7.6 m @ 26.6 gpt Au, 2,676 gpt Ag; 3.5 m @ 32 gpt Au, 3,417 gpt Ag; 5.6 m @ 13.6 gpt Au, 1,154 gpt Ag. The 51 in-fill drill holes totaling 18,488 m reported in this news release were “generally targeting mineralization on the outer edges of the current block model” have a weighted average true width of 2.2 m @ 7.17 gpt Au, 753 gpt Ag. An additional 40,000 to 50,000 m of infill and expansion drilling with 15 drill rigs on site focused on expanding mineralization and improving resource confidence. To date over 203,000 m of drilling have been sunk in the property. Ongoing work includes the Feasibility study expected in H1, 2020 development of the Babicanora Vein in Area 51 zone, stockpiling of high-grade material, an extensive metallurgical test program, geotechnical work and permitting for project development.
  • Minera Alamos Inc. received notification by SEMARNAT (Mexican environmental agency) confirming the successful completion of the technical review phase of the application (Estudio Tecnico Justificativo – “ETJ”) for the change of land use to allow the construction of mining and processing facilities at the Santana project area in Sonora. Phase 2 exploration will continue on the coming months, focusing to “demonstrate the potential of the project to host multiple “Nicho-style” mineralized systems that could be combined to supply feed material for an expanded regional production facility”.
  • Almaden Minerals Ltd. current focus at its Ixtaca property in Puebla relates to permitting and financing activities. “Review by Mexican authorities of Almaden’s environmental permit application (Manifestación de Impacto Ambiental, or “MIA”) continues in the normal course, and recently SEMARNAT, Mexico’s environmental authority, completed its public information meeting in the town of Santa Maria”. Almaden is engaged with several potential financing parties to secure funds for the development of the project. Regarding a decision by a lower court in Puebla State concerning Mexico’s mineral title system, Mexico’s Federal Congress, Senate, and Ministry of the Economy each filed appeals against the decision, as well as Almaden.

ON DEALS AND CORPORATE ISSUES

  • Ridgestone Mining Inc. entered into an agreement to acquire 100% interest in ten mining concessions adjacent to its Rebeico project in Sonora. The concessions cover 3,292 ha west of the Ridgestone claims, in an area with “numerous artisanal workings and mineralized outcrops”. Ridgestone has to make a $83 K payment and issue 5 M shares to the vendor.
  • Millrock Resources Inc. entered into an agreement to sell the La Union, Los Cuarentas, El Pima, El Valle and Llano del Nogal claim blocks to Riverside Resources Inc. The Santa Rosalia option from the Los Cuarenta project will also be transferred. The deal, that includes a geological database and exploration equipment, involves Riverside paying $35 K and issuing 150 K shares to Millrock, as well as a 0.5% net smelter royalty (NSR) on the El Pima and El Valle claims, and in the Santa Rosalia option.
  • ePower Metals Inc. entered into a definitive agreement with Minera Alamos Inc. and Vista Gold Corp. under which ePower has the right to earn 100% interest in the Los Reyes project in Sinaloa. In connection with the Transaction, the Company intends to change its name to “Prime Mining Corp.”, and will focus its resources on the immediate development of Los Reyes. ePower has to complete a $1.5 M cash payment to Minera Alamos, and assume the remaining option payments to Vista Gold of US$1.5 M on October 2019 and US$1.5 M on October 2021, as well as issuing Minera Alamos 9.45 M post-consolidation shares and 3.35 M warrants. ePower has to consolidate its common shares capital on a two-for-one basis and complete a financing of at least Cdn$6 M. The Los Reyes project has an historical estimate of 427.2 K Oz Au, 7.5 M Oz Ag in indicated resources and 196.7 K Oz Au, 4.8 M Oz Ag of inferred resources.
  • Silver Viper Minerals Corp. renegotiated the terms of the Rubi-Esperanza option agreement to purchase three mineral concessions within its La Virginia project in Sonora. The overall agreement reduced the total cash payments from $4.49 M to $3 M, augmented in one year the term of the option and crucially reduced the amount on the first three payments by $1.46 M, enabling Silver Viper to direct maximum expenditures to advancing the project. According to the new agreement the company has to pay US$50 K on June 2019 (paid), US$75 K on June 2020, US$100 K on June 2021, US$200 K on June 2022 and US$2.575 M on June 2023. A 2% NSR can be purchased for US$2 M within 5 years of the original agreement remains unchanged. “Surface geochemistry and prospecting have identified targets to the north, south and east of the El Rubi discovery (6 m TW @ 3.16 gpt Au, 228 gpt Ag) which will be tested during the next phase of drilling. In addition, Silver Viper has contracted Geotech Ltd. to conduct a 720 line-kilometer magnetic and radiometric survey over the El Rubi and La Gloria targets for a total coverage of 4,900 hectares”.
  • Golden Minerals Co. entered into an agreement to sell its Velardeña properties to Compañía Minera Autlán S.A.B. de C.V. for $22 M. The deal comprises the Velardeña properties, including the Velardeña and Chicago mines (currently in care and maintenance) and other adjacent exploration properties, and the lease agreement under which Golden Minerals has the oxide plant with Hecla thorough 2020. The proposed transaction also would include the sale of the Rodeo and the Santa Maria project concessions. Upon execution of this agreement, Autlan paid a deposit of US$1.5 million to Golden Minerals, which will be applied to the purchase price upon closing.
  • Bacanora Lithium PLC. signed an investment agreement and off-take agreement with Ganfeng Lithium Co. (a key player in the lithium industry globally). Once completed this agreement would form a major part of the financing package needed to develop the initial 17,500 tonnes per year production of lithium carbonate. The £14.4 M strategic investment provides Ganfeng with 29.99% of Bacanora, pre-emption rights and a director on the board. Another project level investment of £7.56 M in Sonora Lithium Ltd. (the holding company of the project) accrues Ganfeng 22.5% of the holding company, with an option to increase its interest to 50% within 24 months and the appointment of a director to the board. GFL will provide a plant and process commissioning team to assist Bacanora in delivering first production in 2021.
  • Canasil Resources Inc. and Pan American Silver Corp. signed the definitive agreement under which Pan American has the right to acquire Canasil’s interest in the Sandra Escobar project, in Durango. The transaction was closed for a payment of CDN$2 M and grant of a 2% NSR, with Pan American being able to buy 1% of the NSR by the payment to Canasil of CDN$4 M.

Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.

On the image below, conglomerate with well-rounded quartz vein and silicified rock fragments in the coastal plain in Veracruz. Picture by Jorge Cirett.

IMG_1079 - copia

Oroco Announces Receipt of a Draft Technical Report for the Santo Tomas Porphyry Project, Sinaloa, Mexico

Oroco _06072019_nr

VANCOUVER, British Columbia – (June 7th, 2019) Oroco Resource Corp. (TSX-V: OCO) (“Oroco” or “the Company”) is pleased to announce the receipt of the initial draft of an Independent Technical Report regarding the Geology, Mineralization, and Exploration of the Santo Tomas Cu-(Mo-Au-Ag) Porphyry Deposit in Sinaloa, Mexico (“the Technical Report”). The Technical Report has been prepared by Dane A. Bridge Consulting Inc. of Calgary, Alberta, for use by the Company and by Altamura Copper Corp. (“Altamura”) for filing as a Technical Report with Canadian securities authorities pursuant to National Instrument 43-101, Standards of Disclosure for Mineral Projects, per the NI 43-101F guidelines.

Highlights on the Second Week of July, 2018. Mining and Exploration News in Mexico

211 - copia

By Jorge Cirett

During the 28th week of the year (July 9th to July 15th, 2018), at least 23 press releases were announced by companies working in Mexico. Three companies updated on exploration advances. one company announced a financing round while another tries to extend the period for exercise of warrants. Seven companies released Q2 production results and two others a PEA on its properties. Seven companies released advances on the development or exploration of their resource base, and finally one company announced the appointment of its Vice-president Exploration and one other company the optioning of a property to a third party, and returning another to the underlying owner. ON MEXICO ISSUES, No relevant news. ON EXPLORATION, In Sonora, Ridgestone Mining completed an IP survey on its Rebeico property. In Chihuahua Golden Goliath resumed exploration on its San Timoteo project, and in Veracruz Mexican Gold released rock chip sampling results from its Las Minas project.  ON MINING Torex Gold, Endeavour Silver, Great Panther, Capstone, Excellon, Premier Gold and Hecla released second quarter results on production. Sierra Metals released a PEA on a projected production increment at its Bolivar mine in Chihuahua.  ON FINANCING, Prize Mining closed the first tranche of a non-brokered private placement. Candente Gold applied to extend the expiration period of warrants issued on a previous financing. ON RESOURCES AND DEVELOPMENT, Santacruz Silver, SilverCrest, Avino Silver, Kootenay Silver and Golden Minerals released drilling or exploration results on their properties with resources. Orla Mining released a PEA on its Camino Rojo Property in Zacatecas. ON DEALS AND CORPORATE ISSUES, Discovery Metals announced the appointment of Gernot Wober as VP Exploration. Riverside Resources optioned its La Silla property (in Sinaloa) to Sinaloa Resources, and returned the Glor property (in Sonora) to underlying owner Argonaut Gold, after two unsuccessful drill campaigns by Centerra Gold.

ON MEXICO ISSUES

  • No Relevant News.

ON EXPLORATION

  • Golden Goliath Resources Ltd. reported the commencement of its summer exploration program at its San Timoteo property in the Uruachic district of Chihuahua. San Timoteo hosts the longest mining tunnel in the district, with mapping and sampling having defined three ore shoots and a manto horizon within it. No exploration has been carried below the level of the tunnel, and the workings are interpreted to be above the boiling zone of an epithermal system, hence the possibility of potential bonanza grades down dip.
  • Mexican Gold Corp. released high grade sampling results from the Pueblo Nuevo area of its Las Minas projects in Veracruz. Multiple new vein occurrences have been discovered in the Pueblo Nuevo Valley structural corridor. The veins “show characteristics of mesothermal quartz veins”, generally 20 to cm in width, sub-vertical dips and no post mineral deformation. The dioritic host rock displays argillic alteration and sulfides up to one meter on each side of the veins. Chip sampling results include 0.43 m @ 7.87 g/t Au, 74 g/t Ag, 3.5% Zn; 0.30 m @ 6.14 g/t Au, 60 g/t Ag, 5.3% Zn; 0.50 m @ 19.18 g/t Au, 229 g/t Ag, 2.25% Zn; 0.3 m @ 4.33 g/t Au, 30 g/t Ag, 1.1% Zn; 0.15 m @ 16.17 g/t Au, 101 g/t Ag, 0.6% Cu, 14.6% Zn; 0.60 m @ 3.18 g/t Au, 17 g/t Ag, 3.5% Zn; 0.40 m @ 4.11 g/t Au, 22 g/t Ag; 0.45 m @ 19.41 g/t Au, 148 g/t Ag, 1.5% Cu, 0.8% Zn; 0.60 m @ 19.26 g/t Au, 70 g/t Ag, 2.3% Zn; 0.75 m @ 10.12 g/t Au, 30 g/t Ag.
  • Ridgestone Mining Inc. completed an induced polarization (IP) geophysical survey at its Rebeico Au-Cu project in Sonora. The survey comprised nine lines of IP, each 2 km long, for a total of 18 line kilometers spaced 200 m apart, covering an area of 1.6 by 2.0 km. Ridgestone has an option to acquire 100% interest in the project (subject to a 2% NSR) from YQ Gold de Mexico S. de R.L. (a Mexican corporation). The property covers 167 hectares, and includes the Alaska mine, which has old workings of up to 70 m of depth.

ON MINING

  • Torex Gold Resources Inc. released second quarter production results for 2018, period during which 80 K Oz Au were produced at its Limon-Guajes mine in Guerrero. Production has been ramping up, with 9 K tones per day (tpd) on April, 11 K tpd on May and 13 K tpd on June. The SART plant produced its first copper precipitate, with the operations team now taking the plant to full production. The updated technical report on El Limon-Guajes and Media Luna project is to be completed in late July/early August.
  • Sierra Metals Inc. announced the results of a preliminary economic assessment (PEA) on its Bolivar mine in Chihuahua, with the report being filed within 45 days. The PEA includes a net present value (NPV) of US$214 M at 8% discount rate, a return on investment (ROI) of 550%, on 3-4 years payback period and a net after-tax cash flow of US$303 M. The plant is to process 5 K tpd at recovery rate of 85% Cu to produce 252.5 M Lb Cu on 11 years of mine life on the existing mineral resource estimate. The longhole stoping method is to be used for mining.
  • Endeavour Silver Corp. reported production results for the second quarter 2018. At Guanaceví, in Durango, 71.3 K tonnes were produced @ 225 g/t Ag, 0.67 g/t Au, recovering 90.2% Ag, 92.7% Au to obtain 464.9 K Oz Ag, 1,423 Oz Au. At Bolañitos, in Guanajuato, 108.5 K tonnes were milled @ 91 g/t Ag, 1.82 g/t Au, recovering 78.3% Ag, 82.3% Au, to obtain 248.6 K Oz Ag, 5,222 Oz Au. At El Cubo, in Guanajuato, 134.5 K tonnes were milled @ 171 g/t Ag, 1.92 g/t Au, recovering 86.8% Ag, 84.6% Au, to obtain 642.4 K Oz Ag, 7,029 Oz Au. Consolidated production was 1,355.9 K Oz Ag, 13,674 Oz Au. The El Compas mine in Zacatecas is on track to commence commercial production by the end of July at the target capacity of 250 tpd.
  • Great Panther Silver Mines Ltd. reported production results for the second quarter 2018. At the Guanajuato Mine Complex, in Guanajuato, 77 K tonnes were processed @ 127 g/t Ag, 2.40 g/t Au, recovering 87.7% Ag, 88.2% Au to obtain 276.6 K Oz Ag, 5,240 Oz Au. At Topia, in Durango, 18.1 K tonnes were milled @ 371 g/t Ag, 0.69 g/t Au, recovering 93.9% Ag, 63.1% Au, to obtain 203.1 K Oz Ag, 253 Oz Au. Consolidated production of 95.2 K tonnes milled produced 479.8 K Oz Ag, 5,492 Oz Au, 480 tonnes Pb, 528 tonnes Zn.
  • Capstone Mining Corp. released production results for the second quarter of 2018, including figures from its Mexican operations. At Cozamin, in Zacatecas, 227.6 K tonnes were mined, 224.2 K tonnes milled (4,464 tpd) @ 1.66 % Cu, 1.04% Zn, 0.29% Pb, 45.3 g/t Ag. Recovery was 94.6% Cu, 66.4% Zn, 48.1% Pb, 77.5% Ag, to produce 13,581 tonnes of copper concentrate @ 25.9% Cu, 517 g/t Ag; 3,529 tonnes of zinc concentrate @ 47.5% Zn and 494 tonnes of lead concentrate @ 62.3% Pb, 1,717 g/t Ag.
  • Excellon Resources Inc. announced second quarter 2018 production results from its Platosa mine in Durango. Silver equivalent (AgEq) production increased 120% to 637.2 K Oz AgEq on Q2 2017 figures. 16.1 K tonnes were mined, 22.9 K tonnes milled @ 415 g/t Ag, 4.6% Pb, 6.7% Zn with recoveries of 89.6% Ag, 80.2% Pb, 82.2% Zn to produce 277.7 K Oz Ag, 1.85 M Lb Pb, 2.81 M Lb Zn, or 637.2 K Oz AgEq. Low-grade historical stockpiles and sump material with minimal associated mining cost continued to be processed. An AISC of less than $10 per Ag Oz was achieved.
  • Premier Gold Mines Ltd. released second quarter 2018 production results, including figures from its operations in Mexico. At Mercedes, in Sonora, 13,780 Oz Au, 44,366 Oz Ag were produced during the period. Production was impacted through the first half of the year owing to delays in the development of the Diluvio and Rey de Oro deposits. “Reinterpretation of the Diluvio ore shapes required changes to the stope designs. Mining in Rey de Oro was delayed by permitting requirements for the ventilation system”.
  • Hecla Mining Co. released preliminary results for the second quarter of 2018, including figures from its Mexican operations. At San Sebastian in Durango, 0.6 M Oz Ag, 3,872 Oz Au were produced in the period. The mill operated at an average of 415 tpd.

ON FINANCING

  • Prize Mining Corp. closed the first tranche of its non-brokered private placement for gross proceeds of $6.5 M. No finder’s fees were paid as part of this transaction. (Mercedes, Sonora).
  • Candente Gold Corp. has applied to extend the exercise period of 5 M outstanding share purchase warrants issued at a private placement in August 2016. “The original expiry date was August 12, 2018 and if the extension is approved, the new expiration date will be August 12, 2020”.

ON RESOURCES AND DEVELOPMENT

  • Sierra Metals Inc. released a new mineral reserve estimate on the new PEA on its Bolivar mine in Chihuahua. The Cu-Zn skarn (with Ag and Au credits). “Mineralization exhibits strong stratigraphic control and two stratigraphic horizons host the bulk of the mineralization: an upper calcic horizon, which predominantly hosts Zn-rich mineralization, and a lower dolomitic horizon, which predominantly hosts Cu-rich mineralization”. The indicated resources display 13.26 Mt @ 22.5 g/t Ag, 0.29 g/t Au, 1.04% Cu containing 9.6 M Oz Ag, 124 K Oz Au, 137.5 K tonnes Cu, and the inferred resources 8 M tonnes @ 22.4 g/t Ag, 0.42 g/t Au, 0.96% Cu containing 5.8 M Oz Ag, 109 Oz Au, 76.8 K tonnes Cu.
  • Santacruz Silver Mining Ltd. Reported initial phase I drill results from the Garcia and Armado veins on its Veta Grande project in Zacatecas. Ten drill holes totaling 3,323 m of core drilling have been completed, having received results on the first six holes. Some highlighted true width intervals: 1.0 m @ 0.05 g/t Au, 209 g/t Ag; 0.32 m @ 0.37 g/t Au, 312 g/t Ag; 4 m @ 0.06 g/t Au, 168 g/t Ag; 0.95 m @ 1.36 g/t Au, 235 g/t Ag, 7.5% Pb, 8.7% Zn, 0.2% Cu; 0.65 m @ 292 g/t Ag; 0.88 m @ 1.73 g/t Au, 34 g/t Ag.
  • SilverCrest Metals Inc. released further phase III drill results for the Las Chispas property in Sonora. Highlighted intervals on the Babicanora vein: 2.0 m @ 0.87 g/t Au, 269 g/t Ag; 2.5 m @ 6.04 g/t Au, 369 g/t Ag (including (0.8 m @ 14.95 g/t Au, 742 g/t Ag); 0.6 m @ 2.19 g/t Au, 63 g/t Ag. Highlighted intervals on the Babicanora footwall vein include: 5 m @ 54.59 g7t Au 6,535 g/t Ag (including 0.5 m @ 183.50 g/t Au, 21,858 g/t Ag); 2.3 m @ 4.07 g/t Au, 436 g/t Ag; 0.9 m @ 1.15 g/t Au, 151 g/t Ag. The sub parallel Babicanora FW vein high-grade footprint has now been traced for 250 m on strike.
  • Avino Silver Gold Mines Ltd. released drill results from the Chirumbo and Guadalupe areas of the Avino property in Durango. Avino vein highlighted core length intersects include 15.4 m @ 0.20 g/t Au, 129 g/t Ag, 0.64% Cu; 42.75 m @ 0.45 g/t Au, 46 g/t Ag, 0.44% Cu; 15.85 m @ 4.13 g/t Au, 20 g/t Ag, 0.07% Cu; 7.35 m @ 0.36 g/t Au, 47 g/t Ag, 0.33% Cu; 6.0 m @ 0.09 g/t Au, 202 g/t Ag, 0.64% Cu. Highlighted Guadalupe vein results include 0.60 m @ 1.38 g/t Au, 90 g/t Ag, 0.76% Cu; 1.50 m @ 4.79 g/t Au, 11 g/t Ag, 0.05% Cu; 3.75 m @ 0.32 g/t Au, 171 g/t Ag, 0.1% Cu; 1.60 m @ 0.23 g/t Au, 84 g/t Ag, 0.28% Cu; 5.20 m @ 0.07 g/t Au, 26 g/t Ag, 0.34% Cu; 3.90 m @ 0.33 g/t Au, 129 g/t Ag, 0.75% Cu. The Guadalupe vein has shown to extend along 800 m and to a depth of 250 m. Avino is planning a new drill program targeting the Aguila Mexicana vein system, which is one of the strongest and widest structures on the property.
  • Kootenay Silver Inc. released the results of eight core holes from its La Cigarra property in Chihuahua. The holes tested parts of the Las Carolinas, La Borracha and La Nogalera zones, returning medium to high grade silver intercepts in all areas. Highlighted results include: At La Borracha 12.37 m @ 33 g/t Ag, 0.05 g/t Au, 0.2% Pb, 0.2% Zn; At La Nogalera 1.78 m @ 48 g/t Ag, 0.72 g/t Au; 4.0 m @ 736 g/t Ag, 0.09 g/t Au, 0.3% Pb, 0.1% Zn; At Las Carolinas 14.0 m @ 79 g/t Ag, 0.03 g/t Au (including 6.79 m @ 144 g/t Ag, 0.05 g/t Au; 41.38 m @ 45 g/t Ag, 0.03 g/t Au.
  • Golden Minerals Co. disclosed that surface mapping and sampling identified the eastern extension to the Santa Maria vein at the Santa Maria project in Chihuahua. Several other veins were also discovered in the adjacent Cervantes concessions in an exploration exercise on which 542 rock chip samples were collected. The Santa Maria vein occurs as a series of quartz-calcite veins up to 4.5 m in width, returning assays as high as 0.6 g/t Au, 347 g/t Ag, 1.2% Zn. The Cervantes quartz-calcite vein system occurs 800 m east of the current resource area, for 700 m of strike length, returning up to 1.6 g/t Au, 207 g/t Ag, 0.24% Cu, 5.6% Pb, 19.5% Zn over widths of up to 1.3 m. Golden estimates completing the PEA during the third quarter of 2018.
  • Orla Mining Ltd. filed a preliminary economic assessment (PEA) on its Camino Rojo property, Zacatecas. The PEA visualizes a technically simple open pit mine and heap-leach operation with low capital and operating costs, “rapid payback and strong financial performance”. The project envisages a 3.3 payback period, working at a 18 K tpd rate that would place 42.5 M tonnes of material on the heaps @ 0.71 g/t Au, 13.6 g/t Ag (966 K Oz Au, 18.5 M Oz Ag), with a recovery rate of 67% Au and 15% Ag, producing 97,500 Oz/year at an All-in sustaining cost of $555 Oz/Au.

ON DEALS AND CORPORATE ISSUES

  • Discovery Metals Corp. announced the appointment of Gernot Wober as its Vice-President Exploration (Puerto Rico, Coahuila).
  • Riverside Resources Inc. and Sinaloa Resources Inc. signed a letter of intent (LOI) whereby Sinaloa Resources can earn up to 100% interest in Riverside’s La Silla project in Sinaloa. The initial option to earn 70% lies on Sinaloa issuing shares for $1 M, $60K in cash payments and exploration work commitments of $3 M over 36 months. To earn an additional 30% Sinaloa must spend a further $1 M in exploration and issue Riverside $500 K in shares. Riverside is to retain a 2.5% NSR if Riverside’s interest reduces to less than 10%. Previous work in the 2,071 hectares project includes 6 drill holes on the El Roble system, with intersects of up to 15 m @ 6.9 g/t Au.
  • Riverside Resources Inc. announced that drilling assays from two campaigns funded by Centerra Gold Inc. returned insufficient mineralized thickness and continuity to justify further exploration on the Glor project in Sonora. Riverside believes it has tested the best targets on the property and has terminated the underlying option earn-in agreement with Argonaut Gold.

Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.

On the picture above, structure in fine grained sedimentary rocks with iron oxides and minor quartz veining, greenish clays on the walls. From a shallow epithermal system in Guanajuato. Picture by Jorge Cirett

Highlights on the Fourth Week of June, 2018. Mining and Exploration News in Mexico

117 - copia

By Jorge Cirett

During the 26th week of the year (June 25th to July 1st, 2018), at least 20 press releases were announced by companies working in Mexico. Five companies updated on exploration advances. Three companies announced financing exercises that could accrue over US$14 M, and one company proceeded with a 10:1 consolidation. ON MEXICO ISSUES, Argonaut Gold announced a ruling by the Collegiate Tribunal to reinstate its explosives permit at La Colorada in Sonora. ON EXPLORATION, In Sonora, Aztec Minerals reported drilling results from the Cervantes property; Kootenay described its La Mina property and Aloro Mining obtained the drilling permit for the Los Venados project. ON MINING Argonaut Gold announced a ruling by the Collegiate Tribunal to reinstate its explosives permit at La Colorada in Sonora. Frisco and Goldcorp are to jointly explore the Mazapil valley in Zacatecas. ON FINANCING, Silver Bull, Prize Mining and One World Lithium announced private placements for up to $3 M, $10.75 M and CND$2 M respectively. ON RESOURCES AND DEVELOPMENT, Endeavour Silver released results from infill drilling at Terroneras, Jalisco. Sierra Metals informed of a stockwork zone on the Santa Rosa de Lima structure of its Cusi mine in Chihuahua. ON DEALS AND CORPORATE ISSUES, Geologix finalized its name change to ValOro. Defiance Silver acquired a land package from Mag Silver in Zacatecas. Aloro Mining received title to land contiguous to its Venados project in Sonora. Arian Silver presented its financial report for 2017. Kootenay Silver optioned La Mina property in Sonora to Capstone Mining.

ON MEXICO ISSUES

  • No Relevant News..

ON EXPLORATION

  • Kootenay Silver Inc. reported drilling results by partner Aztec Minerals Corp. on its Cervantes project in Sonora. The final six core holes of 17 on the phase 1 campaign encountered porphyry-type gold-copper mineralization. Highlighted intervals comprise 16.0 m @ 0.25 g/t Au, 0.12% Cu; 100.5 m @ 0.22 g/t Au, 0.12% Cu; 98.5 m @ 0.41 g/t Au, 0.13% Cu (including 33 m @ 0.60 g/t Au, 0.02% Cu); 85.2 m @ 0.48 g/t Au; 0.07% Cu; 90.5 m @ 0.29 g/t Au, 0.06% Cu (including 34.5 m @ 0.55 g/t Au); 116 m @ 0.35 g/t Au, 0.06% Cu (including 62 m @ 0.5 g/t Au). The drilling extended the strike length to more than 800 m at the California and Jasper prospect areas.
  • Kootenay Silver Inc. optioned the La Mina property in Sonora to Capstone Mining Corp. (see below). The property covers “the upper levels of a zoned copper porphyry mineral system exposed over a 2 by 2 Kilometer area”, containing a large leached argillized pyritic zone where surface grab and chip samples averaged about 300 ppm Cu. Another area in the property displays a 100 x 700 m exotica copper zone where sampling averaged 0.49% Cu on 40 rock chip samples.
  • Aloro Mining Corp. informed the permit for road construction and drilling at its Los Venados property in Sonora has been granted by SEMARNAT (Environmental bureau). The permit allows for drilling 12 reverse circulation (RC) holes and the construction of 3,693 m of access roads.
  • Minera Frisco and Goldcorp Inc. entered into an agreement for exploration and mining in the Mazapil valley, Zacatecas. The information was presented by Frisco to the Bolsa Mexicana de Valores (BMV).
  • One World Lithium Inc. conducted a geophysical survey at its Salar del Diablo project in Baja California. The Volterra TEM in-loop sounding survey was carried on the northern third of the Salar del Diablo. The survey totaled 79.7 line kilometers on seven lines nine to twelve Km long and spaced two Km apart, covering 150 square Km. A six square Km part of the salar is highly conductive and with a calculated thickness in excess of 100 m. A probably thinner and less conductive part of the salar covers 24 square Km and is open ended. The company intends to launch a 15 hole 4,000 m drilling campaign in three months time.

ON MINING

  • Argonaut Gold Inc. announced that the Collegiate Tribunal (an arm of the State Supreme court that is tasked with overseeing the Judiciary court) unanimously ruled to lift the suspension of the explosives permit at its La Colorada mine in Sonora. “The ruling directs that the Secretary of National Defense (“SEDENA”) reinstate the explosives permit”. “With this successful appeal, the Company will now have the ability to continue full operations during the balance of the Judiciary legal process”. Ramp up of full operations is expected to be re-established by mid-July.

ON FINANCING

  • Geologix Explorations Inc. announced the name change to ValOro Resources Inc. along with a share consolidation on a 1:10 ratio will take effect as market opens on June 28th (Tepal, Michoacan).
  • Silver Bull Resources Inc. intends to complete a private placement aiming for gross proceeds of US$3 M (Sierra Mojada, Coahuila).
  • Prize Mining Corp. is to make a private placement aiming to raise up to $4 M in gross proceeds. The company is to pay 7.0% of the gross proceeds as cash commission, and a cash work fee of $40 K to the agent. The maximum aggregate gross proceeds of the offering and the non-brokered private placement is $10.75 M. (Manto Negro, Coahuila).
  • One World Lithium Inc. announced that the previous non-brokered private placement announced on May 25, 2018 will be replaced with a non-brokered private placement aiming to raise gross proceeds of up to CND$2 M.

ON RESOURCES AND DEVELOPMENT

  • Endeavour Silver Corp. released results from infill drilling at its Terroneras property in Jalisco. Highlighted true width (TW) intervals from these nine holes comprise: 2.8 m @ 2.0 g/t Au, 54 g/t Ag; 1.3 m @ 1.3 g/t Au, 467 g/t Ag; 2.3 m @ 4.8 g/t Au, 222 g/t Ag; 21.2 m @ 3.2 g/t Au, 618 g/t Ag; 6.0 m @ 2.6 g/t Au, 507 g/t Ag; 1.5 m @ 7.1 g/t Au, 181 g/t Ag; 1.6 m @ 4.2 g/t Au, 120 g/t Ag; 4.4 m @ 4.7 g/t Au, 121 g/t Ag; 4.6 m @ 4.3 g/t Au, 146 g/t Ag; 5.7 m @ 1.3 g/t Au, 164 g/t Au. “The infill drill program is now 60% complete, with 5,990 m drilled out of 10,000 m planned”.
  • Sierra Metals Inc. confirmed the existence of a wide high-grade silver stockwork within the Santa Rosa de Lima vein complex, at its Cusi property in Chihuahua. The stockwork zone measures 100 m in length, 40 m in width and 70 m in height, and is open at depth and width. Mine development so far has resulted in 4,437 tonnes @ 205 g/t Au, 0.07 g/t Au, 0.12% Pb, 0.15% Zn.

ON DEALS AND CORPORATE ISSUES

  • Geologix Explorations Inc. announced the name change to ValOro Resources Inc. along with a share consolidation on a 1:10 ratio will take effect as market opens on June 28th (Tepal, Michoacan).
  • Defiance Gold Corp. completed the acquisition of Mag Silver’s Corp.’s Zacatecas silver district holdings, including its regional exploration database. Defiance is to pay 5 M shares to Mag for as consideration for the sale. The Lagartos project consists of 14 concessions covering 800 hectares (San Acacio, Zacatecas).
  • Aloro Mining Corp. received the title from a 1,675 has concession contiguous to its 1,524 has Los Venados project in Sonora. The claim was staked on July 2017 (Los Venados, Sonora).
  • Arian Silver Corp. presented financial results for 2017. The company owns 12 mining concessions covering 1,500 hectares, some of which encompass the Los Campos, San Celso, Los Africanos and Calicanto projects in Zacatecas. At the end of the period the company had 0.9 M in cash and cash equivalents.
  • Kootenay Silver Inc. entered into an option agreement with Capstone Mining Corp. on La Mina project in Sonora. Capstone can earn-in an initial 60% by making staged payments of US$600 K and spending US$4 M on exploration over 4 years. “Capstone may earn up to a 100% interest in La Mina in stages by completing certain milestones including preparation of a preliminary economic assessment, a pre feasibility study and paying an additional aggregate total of US$8.4 million to Kootenay in stages at each of the various milestones”. The property is subject to an underlying information agreement with a 2.5% royalty, of which up to 2.0% can be bought. “If Capstone Mining earns 100% interest, Kootenay will retain a 1% net smelter return with no buy out option of which 0.5% will be held by the third party after giving effect to the Buydown”.
  • Minera Frisco and Goldcorp Inc. entered into an exploration/mining agreement on the Mazapil Valley. No further details were released.

Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.

On the picture above, intensely silicified tuff, interpreted as alteration at the paleo water table of an epithermal low sulfidation system in Guanajuato. Picture by Jorge Cirett.

Megastar to Acquire 100% of Rama de Oro Epithermal Au-Ag Project in Oaxaca, Mexico

Megastar _100518

Vancouver, BC, Canada / May 10 2018 / JMN Wire / Megastar Development
Corporation (“Megastar”, the “Company” or “MDV”) (TSX-V: MDV; Frankfurt:
M5QN) is pleased to announce that it has signed a Denitive Option
Agreement (the “Agreement”) with Paradex Inc. (”Paradex”), a private Arizona,
USA mining exploration company, and Minera Zalamera, S.A. DE C.V. (“Minera
Zalamera”), a private Chihuahua, Mexico mining exploration company, to
acquire 100% undivided interest (the “Rama de Oro Option”) in certain mineral
concessions (the “Concessions”) known as the Rama de Oro project (the
“Project”) located in the state of Oaxaca, Mexico.

Highlights on the First Week of May, 2018. Mining and Exploration News in Mexico

093 - copia

By Jorge Cirett

During the 18th week of the year (April 30th to May 6th, 2018), at least 21 press releases were announced by companies working in Mexico, with news on the exploration of eight properties, eight more companies releasing Q1 2018 results, and Primero Mining extending its revolving credit facility. ON MEXICO ISSUES, production statistics for the mining sector on February 2018 were published. ON EXPLORATION, In Sonora, Azure updated on exploration efforts at its Oposura, Alacrán and Sara Alicia projects; Alamos Gold presented exploration plans on the Mulatos district; San Marco Resources obtained the Suanse property by lottery. In Coahuila, Discovery Metals disclosed underground channel sample results from its Puerto Rico property; Silver Bull acquired a 60 ha claim within its large land package in Sierra Mojada. In Veracruz, Mexican Gold released channel sampling results from the Changaro zone at its Las Minas project. ON MINING, Argonaut Gold, Santacruz Silver, Gold Resource, Alamos Gold, Golden Minerals, Leagold, Great Panther and Telson Mining presented Q1 2018 production reports. ON FINANCING, Primero Mining agreed on the extension of its revolving credit facility. ON RESOURCES AND DEVELOPMENT, Golden Minerals released drill results from its Santa Maria property in Chihuahua. Argonaut updated on exploration in properties in Guanajuato and Baja. Minera Alamos announced drilling plans on the now combined Santana/Los Verdes properties.  ON DEALS AND CORPORATE ISSUES, Endeavour Silver released its annual review and sustainability report. Advance Gold contracted a third party to assist with investors relations.

ON MEXICO ISSUES

  • The mining and metallurgic production in Mexico grew 4% in February, which is the best result since April 2016, although in a yearly basis a 1.3% decrement was recorded. During February, the production of lead (-34.6%), sulphur (-12.2%), silver (-11.3%), copper (-8.2%) and coke (-5.7%) decreased, while that of iron pellets (1.1%), fluorite (1.7%) zinc (4.6%), gold (5.8%), coal (18.8%) and gypsum (19.2%) showed an increment. Sonora was the leader in gold production during February, with 3,710 Kg (119,720 Oz), while Zacatecas  kept the title in silver with 171,903 Kg (5,526,806 Oz).

ON EXPLORATION

  • Azure Minerals Ltd. completed the mineral resource drill-out of the Oposura project, in Sonora. The program included 157 holes totaling 10,112 m (assays for 27 holes still awaited), confirming good height (width) and grade continuity of the horizontal mineralization. Metallurgical studies show 85.6% Zn and 84.0% Pb recoveries. The initial mineral resource estimate is expected in June 2018.
  • Azure Minerals Ltd. completed the stage 2 drilling program at its Sara Alicia Au-Co project in Sonora. Results awaited.
  • Azure Minerals Ltd. informed the operator of its Alacrán project in Sonora, Minera Teck, S.A., completed an 11 hole drill program in December 2017, with final results awaited. Teck has informed it will continue with the year 2 work program “comprising further geological, geochemical and geophysical surveys in the first half of 2018, which will be followed by more drilling in the second half of the year”.
  • Discovery Metals Corp. disclosed assay results from continuous underground channel sampling at its Puerto Rico project in Coahuila. Results on 100 samples out of 600 samples collected on the Zaragoza mine have been received. Select significant channel samples include: 2.1 m @ 822 g/t Ag, 2.1% Zn, 2.5% Pb, 0.7% Cu; 1.8 m @ 55 g/t Ag, 27.9% Zn, 2.9% Pb, 0.1% Cu; 3.3 m @ 175 g/t Ag, 2.1% Zn, 15.2% Pb, 0.2% Cu; 2.3 m @ 62 g/t Ag, 9.2% Zn, 6.5% Pb, 0.1% Cu; 1.3 m @ 75 g/t Ag, 16.8% Zn, 3.2% Pb, 0.1% Cu. Average manto grades 157 g/t Ag, 6.2% Zn, 5.5% Pb, 0.1% Cu.
  • Mexican Gold Corp. released channel sampling results from the La Perdida mine in the Changaro zone at its Las Minas project in Veracruz. At La Perdida adit, four 2.0 m samples returned 7.85 g/t Au, 3 g/t Ag, 0.14% Cu; 0.30 g/t Au, 1 g/t Ag, 0.05% Cu; 16.70 g/t Au, 12 g/t Ag, 0.49% Cu; 27.30 g/t Au, 12 g/t Ag, 0.17% Cu, averaging 8.0 m @ 13.04 g/t Au, 7 g/t Ag, 0.21% Cu.
  • Alamos Gold Inc. informed exploration in its 28,777 ha land package at Mulatos, Sonora, is to focus in 2018 outside the Mulatos mine, including the El Carricito, El Halcon, and El Jaspe areas. During the first quarter Alamos invested $4.5 M in exploration activities within the Mulatos district, including 14,792 m of diamond drilling and 1,059 m of RC drilling.
  • Silver Bull Resources Inc. acquired a 68 ha mineral license nine kilometers NW from its main Sierra Mojada deposit in Coahuila. The application “covers 13 historical mine shafts in the Palomas Negros area including a 120 meter long x 25 meter wide x 25 meter deep historical open pit”. Select sampling on the open pit returned up to 542 g/t Ag, 36.5% Zn, 9.3% Pb, 0.14% Cu on 2 m channel sampling.
  • San Marco Resources Inc. obtained the Suanse property in Sonora through the recent mineral concession lottery by the Mexican government. The property is located between two mineral concessions within Evrim’s LLano del Nogal porphyry copper moly play.

ON MINING

  • Argonaut Gold Inc. presented first quarter 2018 operating and financial results. At El Castillo in Durango, 4.72 M tonnes of waste were moved, 1.62 M tonnes of ore were mined (52 K tonnes per day, or tpd) @ 0.44 g/t Au, producing 8,657 Oz Au, 7,528 Oz Ag. At San Agustin in Durango, 356 K tonnes of waste were moved 1.72 M tonnes of ore mined (23 K tpd) @ 0.50 g/t Au, producing 15,824 Oz Au, 80,331 Oz Ag. Cash cost was $1,020 for El Castillo and $365 for San Agustín. At La Colorada in Sonora, 6.13 M tonnes of waste were moved, 1.1 tonnes of ore mined (80 K tpd) @ 0.43 g/t Au, producing 14,291 Oz Au, 57,767 Oz Ag at cash cost $726. Cash and cash equivalents of $21.3 M at the end of the period.
  • Santacruz Silver Mining Ltd. reported financial and operating results for Q4 2018. During the period 181 K tonnes were processed, producing 865.5 K Oz AgEq at cash cost $23.07 and AISC $27.56 per AgEq Oz.
  • Gold Resource Corp. reported first quarter 2018 production results. During the period the company produced from three different orebodies on its El Aguila property in Oaxaca. At Arista 130.8 K tonnes were milled @ 1.92 g/t Au, 106 g/t Ag, 0.39% Cu, 1.63% Pb, 4.41% Zn, with recoveries of 78% Au, 91% Ag, 75% Cu, 76% Pb, 83% Zn. At the El Aguila open pit, 5.1 K tonnes were milled @ 2.16 g/t Au, 45 g/t Ag, and recoveries of 84% Ag, 86% Ag. At Altagracia 3.2 k tonnes were milled @ 1.16 g/t Au, 182 g/t Ag, and recoveries of 60% Au, 82% Ag. Production amounted to 6,647 Oz Au, 425.9 K Oz Ag, 385 tonnes Cu, 1,615 tonnes Pb, 4,793 tonnes Zn. Cash cost was ($316) per AuEq Oz after by-product credits, and AISC $347 per precious metal gold equivalent ounce sold. Cash and cash equivalents at quarter end totaled $28.6 M.
  • Alamos Gold Inc. reported its financial results for the first quarter 2018, including figures from its Mexican operations. At Mulatos in Sonora, 2.2 M tonnes were mined and 2 M tonnes of waste moved. Average grade of 1.75 M tonnes stacked was 0.84 g/t Au. As for high grade, 30.4 k tonnes were milled @ 8.11 g/t Au, for the production of 46,000 Oz Au at cash cost $786 per OZ Au, and AISC $842 per Oz Au. At El Chanate in Sonora, 1 M tonnes of ore were mined @ 0.60 g/t Au, with recoveries of 71% Au, to produce 13,800 Oz Au.
  • Golden Minerals Co. provided business and financial results for the first quarter 2018. During the period Golden received $1 M from Electrum Global Holdings, LP. in exchange for an amendment to the Electrum farm-out agreement providing Electrum an additional 20% interest in the Celaya project. Also 4,800 m in 22 holes were drilled on the Santa Maria property in Chihuahua. Cash and cash equivalents of $2.7 M at the end of the period.
  • Leagold Mining Corp. reported Q1 2018 production. During the period 7.7 M tonnes were moved on the open pit at Los Filos, Guerrero, of which 2.0 M tonnes were from ore @ 0.57 g/t Au. From underground 101 k tonnes were mined @ 5.47 g/t Au. In total 1.6 M tonnes were processed @ 0.97 g/t Au to produce 51,003 Oz Au at cash cost $880 per Au Oz and AISC of 1,039 per Au Oz. Test mining at the Bermejal underground deposit is to begin in Q2 2018. Leagold’s goal is to raise quarterly production from 50 K to almost 70 K by the end of the year.
  • Great Panther Silver Ltd. presented first quarter 2018 financial results, including figures from its operations in Mexico (Topia, Durango; Guanajuato mine complex, Guanajuato). Consolidated production came from 96.9 K tonnes milled, to obtain 491 K Oz Ag, 5,831 Oz Au at cash cost $12.76 per AgEq Oz and AISC $16.16 per AgEq Oz. For 2018 14,000 m of underground drilling are planned at the Guanajuato mines, and 5,000 m of surface drilling and 5,000 of underground drilling in the San Ignacio mine (part of the mine complex). Cash and cash equivalents were $60.9 M at the end of the period.
  • Telson Mining Corp. informed on first quarter 2018 pre-production toll milling at its Tahuehueto property in Durango. During the period 9,503 tonnes of ore were milled @ 5.44 g/t Au, 62 g/t Ag, 4.5% Zn, 2.2% Pb, recovering 79.4% Au, 85.7% Pb, 84.4% Pb, 76.4% Zn to produce 360 tonnes of lead concentrate (50.2% Pb), 99.25 g/t Au, 1,185 g/t Ag, 12.2% Zn) and 713 tonnes of zinc concentrate (46.3% Zn, 7.41 g/t Au, 105 g/t Ag, 0.93% Pb).

ON FINANCING

  • Primero Mining Corp. agreed to the extension of its revolving credit facility and the related guarantee provided by Wheaton Precious Metals Corp., to May 15th, 2018 or the closing of the business combination with First Majestic Silver Corp. (San Dimas, Durango).

ON RESOURCES AND DEVELOPMENT

  • Golden Minerals Co. released results from the 2,400 m, 22-hole drilling program at its Santa Maria property in Chihuahua. Some of the highlighted true width (TW) results comprise: 0.6 m @ 593 g/t Ag, 0.79 g/t Au, 0.4% Pb+Zn; 0.8 m @ 183 g/t Ag, 0.33 g/t Au, 0.1% Pb+Zn; 2.5 m @ 415 g/t Ag, 0.29 g/t Au, 1.5% Pb+Zn; 3.8 m @ 213 g/t Ag, 0.47 g/t Au, 0.8% Pb+Zn; 1.2 m @ 200 g/t Ag, 0.22 g/t Au, 0.15% Pb+Zn; 3.5 m @ 310 g/t Ag, 0.77 g/t Au, 1.3% Pb+Zn; 1.3 m @ 1,322 g/t Ag, 2.06 g/t Au, 1.4% Pb+Zn; 0.9 m @ 148 g/t Ag, 2.0 g/t Au, 1.5% Pb+Zn; 6.5 m @ 1,094 g/t Ag, 3.64 g/t Au, 1.3% Pb+Zn. The mineralization comprised oxide, mixed and sulfide materials in different intersects.
  • Argonaut Gold Inc. informed the re-logging of drill core and the development of a geological model at Cerro del Gallo, in Guanajuato. On its San Antonio project in Baja California Sur, technical sessions were held with the Mexican Environmental Authority DGIRA in preparation of new future Environmental Assessment application submittal.
  • Minera Alamos Inc. released its plans for a drilling campaign at the now combined Santana/Los Verdes property in Sonora. The phase one is to include 20 holes in 3,000 m of drilling, focusing on the Nicho extensions and Nicho Norte, into the contiguous Los Verdes claims. Previous drilling at the Santana project outlined significant mineralization associated to hydrothermal breccias hosted by stocks and batholithic intrusions. Heap leaching tests are being conducted on the Nicho Norte zone.

ON DEALS AND CORPORATE ISSUES

  • Endeavour Silver Corp. released its annual review and sustainability report. Sections of the report include: Safety and Health, Our People, Community, Environment, Economic. In words of its CEO, Bradford Cooke: “..is intended to show that sustainability relies on the connectedness between people, communities and the environment” (La Colorada, Sonora, El Castillo, Durango).
  • Advance Gold Corp. engaged Nicosia Capital to assist on Investor Relations. “Advance will pay Nicosia a fee of $3,500 per month and issue 100,000 stock options at a price of $0.12 per share. The initial agreement with Nicosia has a term of two months to commence May.1st, 2018” (Tabasqueña, Zacatecas).

Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.

On the picture below, Very strong silicification and minor silicification on structures from a shallow epithermal system in Guanajuato. Picture by Jorge Cirett.