Economy
Newmont Urges Union at Peñasquito Mine in Mexico to Abide by Labor Agreement
The Mining and Exploration News in Mexico: Highlights on the Third Week of April, 2023.
Copper mineralization (chrysocolla)
By Miguel A Heredia
During the 16th week of the year (April 17th to April 23th, 2023), at least 17 press releases were announced by companies working in Mexico, and 8 news published by the media, with nine commenting on Mexican issues, six communicating production and financial results, four reporting resources and developments of their properties, four disclosing deals and corporate issues, one informing on exploration results, and one announcing financing issues. ON MEXICO ISSUES, Minera Gorrión, a subsidiary of Almaden Minerals, will challenge the cancellation of their concessions in the Municipality of Ixtacamaxtitlan, Puebla. Municipal Presidents (Majors), as representatives of the mining communities of the Chihuahua State, signed and sent a letter to AMLO to request that the Mining Reform initiative be analyzed, since they consider that it will seriously affect employment, health, education, local businesses, and in general, the well-being of the population. The Association of Mining Engineers, Metallurgists and Geologists of Mexico (AIMMGM) requested to expand discussion on mining law before submitting its vote in the Senate. The Plenary of the Chamber of Deputies, with the rejection of the opposition, started the debate that ended in the approval, in “fast track” of a new Mining Law, at the initiative of the parliamentary group of Morena. According to specialists, the Reform to the Mining Law would affect fundamental rights and international treaties, opening an USMCA panel with Canada. With 290 votes in favor, 186 against and one abstention, Morena and his allies in the Chamber of Deputies got ahead of the opposition and approved in plenary session an alternative initiative to that of President Andrés Manuel López Obrador that reforms the Mining Law and other arrangements. Mining companies lose on the Mexican Stock Exchange due to the initiative to reform the Mining Law in Mexico. GoGold and Oroco reported the best drilling intercepts in Mexico on the third week of April 2023. ON EXPLORATION, In Oaxaca, Vortex received community approval for environmental and surface geological surface baseline study at its flagship Zaachila project. ON MINING, First Majestic, Golden Minerals, Avino, and Guanajuato Silver, reported Q1, 2023 production and financial results from their Mexican mine operations. Fresnillo and MAG Silver shipped their first commercial concentrate from the Juanicipio mine in Zacatecas. Bear Creek reported production and financial results from its Mercedes mine in Sonora for the period April 21, 2022 to December 31, 2022. ON FINANCING, Endeavour entered into a Commitment Letter for a senior secured debt facility for up to USD $120M (Terronera project, Jalisco). ON RESOURCES AND DEVELOPMENT, Oroco announced drilling results from its Santo Tomas project, Sinaloa. GoGold released results from its ongoing drilling program from its Los Ricos South property in Jalisco. Endeavour announced its intentions to proceed with the construction of an underground mine and mill at the Terronera project in Jalisco. Heliostar commenced drilling at its Ana Paula property in Guerrero following the re-scoping plans announced previously. ON DEALS AND CORPORATE ISSUES, Chesapeake announced the appointment of its VP of Corporate Development and Investor Relations (Metates project, Durango). Riverside appointed a new Director and presented results from its annual meeting of shareholders (La Union project, Sonora). Canasil signed an option agreement and an exclusivity agreement with Silver Dollar (Nora project, Durango). ON SOCIAL RESPONSIBILITY, No relevant news.
ON MEXICO ISSUE
- Minera Gorrión, a subsidiary of Almaden Minerals Ltd., will challenge the resolution of a judge of the second court district in the state of Puebla to cancel their concessions in the Municipality of Ixtacamaxtitlan, Puebla, avoiding developing open-pit mining projects. Minera Gorrión regretted the resolution to cancel its concessions in Puebla, since it does not include any argument that the company provided in its defense. The company said in an statement that it is important to clarify that, as long as the legal proceedings related to this case continue, the company’s concession title requests remain valid, thus preserving the company and its acquired rights. For more than 20 years, the company has invested more than MXP $900M in exploration, the identification of a mineral deposit, and the planning to develop a modern mining project, which will have a very significant economic impact if authorized. “Minera Gorrión regrets that, in his resolution, the judge does not include any of the arguments that the company provided to defend its case.
- Municipal Presidents (Majors), as representatives of the mining communities of the Chihuahua State, signed and sent a letter to AMLO to request that the Mining Reform initiative be analyzed before it is approved by the Congress since they consider that it will seriously affect employment, health, education, local businesses, and in general, the well-being of the population.
- The Association of Mining Engineers, Metallurgists and Geologists of Mexico (AIMMGM) requested to expand discussion on the draft Decree for the reform of the Mining Law, the National Water Law, the Law of Ecological Balance and Environmental Protection and the General Law for the Prevention and Integral Management of Waste related to Mining and Water Concessions before submitting its vote in the Senate.
- The Plenary of the Chamber of Deputies, with the rejection of the opposition, started the debate that ended in the approval, in “fast track” of a new Mining Law, at the initiative of the parliamentary group of Morena. Deputy Ignacio Mier Velazco, coordinator of the Morena Parliamentary Group said that “for the first time it is regulated, transparency is given, the people of Mexico are given certainty, the environment is protected and the water is taken care of”. However, during the discussion in general, the opposition showed their rejection of the approval of this law, for not listening to the voices of indigenous people, peasants, or defenders of the environment. The deputy Laura Patricia Contreras Duarte (PAN), assured that the initiatives proposed by the President of the Republic are nothing more than “whims”.
- According to specialists, the Reform to the Mining Law would affect fundamental rights and international treaties, opening an USMCA panel with Canada. The mining and water reform initiative, which is under discussion in Congress, has generated concern in various sectors due to the possible violations of fundamental rights that its entry into force could imply, said lawyers who are experts in the matter. One of the aspects that have been the subject of criticism is the elimination of requests for processing of new concessions that are pending resolution. The initiative is a very serious impact on foreign direct investment, since it generates great discontent in the foreign mining sector, especially Canada, which belongs to the USMCA. As a result of this, it is very likely that a dispute resolution panel will be initiated because it is a clear violation of Mexico’s obligations in the protection of foreign investment, noting that Canadian investment is very large in Mexico, so it is a direct affectation to their interests.
- With 290 votes in favor, 186 against and one abstention, Morena and his allies in the Chamber of Deputies got ahead of the opposition and approved in plenary session an alternative initiative to that of President Andrés Manuel López Obrador that reforms the Mining Law and other arrangements. The proposal -voted only in general and which is still being discussed in particular- reduces the validity of mining concessions from 50 to 30 years, with the possibility of extending them for another 25 years and at the end of that term, in case of participating in the new tender of the same lot, the holder would have preference for another 25 non-extendable years. In what the opposition described as an “albazo”, the parliamentary majority of Morena resumed the presidential initiative on the matter and presented it as its own initiative to discuss and vote on it on “fast-track”. It also conditions the mining concession to water availability and, where appropriate, to the mining water concession previously obtained, in accordance with the spirit of the Constitution in this matter, which gives priority to the human and domestic use of water. The obligation of the concessionaires to carry out the efficient use and reuse of water and, where appropriate, the restoration of the water resource is established. In its reform proposal, the Federal Executive proposed that the concession only be granted for mineral or substance susceptible to exploitation, which will allow, in its opinion, greater control and generation of resources for the State and the affected communities. In another aspect, the federal government establishes in its proposal that acts of private law are not recognized for the transfer of the mining concession, so that the Ministry of Economy may authorize the transfer only when the requirements requested for the original concession are met. That is, the concession will not serve to guarantee the obligations of the concession holder. On this, the initiative of the Morena legislators establishes that the transmission and guarantee of mining concessions will be carried out with the authorization of the General Directorate of Mines of the Ministry of Economy, as long as it is verified that the transmission is between two mining companies, in order to avoid speculation. In the case of the guarantee, when it is a company that is in operation. In order to regulate and avoid predatory, harmful mining activities that are contrary to the right to water, a healthy environment, people’s health and, in general, the rights of the towns and communities where said projects are carried out, the initiative of the Executive proposes presenting a social impact study and a Restoration, Closing and Post-closing Program. Likewise, it requires a Mine Closure Plan, the presentation of letters of credit to guarantee compliance with the mitigation and restoration obligations and a Waste Management Program. The initiative of the legislators considers the instrument of a letter of credit to guarantee the Mine Closure Plan.
- Mining companies lose on the Mexican Stock Exchange due to the initiative to reform the Mining Law in Mexico. Grupo México, the main copper producer worldwide, fell 1.73%, to MXP $91.43 pesos per share, and Industrias Peñoles, the largest silver producer, lost 1.49%, to MXP $279.29 per share. The miners are concerned about the possible negative effects on their profitability and the economic impact on the country, since the proposal implies higher costs for them and a shorter time to recover the expenses,” said José María de las Rivas, Analyst at Intercam Bank.
- GoGold Resources Inc., and Oroco Resources Corp., reported the best drilling intercepts in Mexico on the third week of April, 2023. Details are shown in the table below:

ON EXPLORATION
- Vortex Metals Inc., received community approval for environmental and surface geological surface baseline study at its flagship Zaachila project in Oaxaca. The environmental study will be carried out by a group of 10 environmental specialists and will involve a total area of 500 hectares. The company also will conduct geological mapping, sampling, and trenching on the property.
ON MINING
- First Majestic Silver Corp., reported Q1, 2023 production and financial results from their Mexican operations. Production figures by mine operation is shown in the table below:

The Company is planning to release its Q1, 2023 unaudited financial results on May 4, 2023.
- Golden Minerals Company announced Q1, 2023 production figures from its Rodeo project in Durango. The company mined 154,371 tonnes, stockpiled 18,467 tonnes awaiting process, stockpiled 133,349 tonnes of low grade, and processed 54,272 tonnes of 1.6 g/t Au and 9 g/t Ag with metallurgical recoveries of 72.6% and 75.5% respectively, to produce 2,081 Oz of payable Au and 11,535 Oz Ag (2,219 Oz AuEq). The average realized price before refining and selling cost was USD $1,891.24 for Oz Au and USD $22.60 for Oz Ag.
- Avino Silver & Gold Mines Ltd., reported Q1, 2023 production and financial results from its Avino mine in Durango. The company milled 159,757 tonnes of 51g/t Ag, 0.58 g/t Au, and 0.47% Cu with metallurgical recoveries of 89%, 77%, and 84% respectively to produce 234.3K Oz Ag, 2,286 Oz Au, and 1.4M Lb Cu (or 678.2K Oz AgEq).
- Guanajuato Silver Company Ltd., announced Q1, 2023 consolidated production figures from their Mexican operations in Durango (Topia) and Guanajuato (El Cubo, Valenciana, and San Ignacio). The company mined 162,116 tonnes and milled 160,182 tonnes to produce 458.8K Oz Ag, 4,413 Oz Au, 906.7K Lb Pb, and 1.1M Lb Zn (938K Oz AgEq), with metallurgical recoveries of 83.9%, 81.1%, 87.1%, and 83.5% respectively.
- Fresnillo plc (56%) and MAG Silver Corp. (44%), shipped their first lead-zinc commercial concentrate from the Juanicipio mine in Zacatecas. During March 2023, milling rates were around 60% of design, delivering an average of 2,476 tonnes per day with rates periodically reaching up to 3,900 tonnes per day. Current mill feed is a combination of mineralized material from underground stopes and lower grade stockpiles. Over the course of March 2023, lower grade commissioning material was processed with recovery rates averaging 84% for Ag, slightly above expectations at this stage of the commissioning.
- Bear Creek Mining Corporation reported production and financial results from its Mercedes mine in Sonora for the period April 21, 2022 to December 31, 2022. The company mined 337,108 tonnes and processed 412,457 tonnes of 3.02 g/t Au and 3 g/t Ag to produce 34,628 Oz Au and 8,489 Oz Ag at cash and all-in-sustaining cost of USD $1,193 and USD $1,627 per Oz Au sold and streamed respectively. The company reported revenues of USD $61M .
ON FINANCING
- Endeavour Silver Corp., entered into a Commitment Letter with Societe Generale and ING Bank N.V. for a senior secured debt facility for up to USD $120M to proceed with the construction of an underground mine and mill at its Terronera property in Jalisco.
ON RESOURCES AND DEVELOPMENT
- Oroco Resource Corp., announced drilling results from its Santo Tomas project, Sinaloa. Drilling highlights include hole NO-44 with 0.83% Cu, 0.011% Mo, and 0.072 g/t Au (0.93% CuEq) over 352.5m (best hole drilled on the project to date); and hole NO-45 with 0.44% Cu, 0.011% Mo, and 0.035 g/t Au (0.50% CuEq) over 329.8m. The company has now completed its North Zone drill program in support of the planned Preliminary Economic Assessment (PEA).
- GoGold Resources Inc., released results from the ongoing drilling program at Eagle Area within its Los Ricos South property in Jalisco. Drilling highlights include hole LRGAG-22-134 with 1.13 g/t Au, 69 g/t Ag (2.05 g/t AuEq or 154 g/t AgEq) over 36.9m, including 2.28 g/t Au and 134 g/t Ag (4.06 g/t AuEq or 305 g/t AgEq) over 16.5m, including 8.55 g/t Au and 824 g/t Ag (19.53 g/t AuEq or 1,465 g/t AgEq) over 1.3m; hole LRGAG-22-136 with 1.03 g/t Au and 65 g/t Ag (1.9 g/t AuEq or 142 g/t AgEq) over 53m, including 2.16 g/t Au and 56 g/t Ag (2.9 g/t AuEq or 218 g/t AgEq) over 20.2m, including 9.54 g/t Au and 490 g/t Ag (16.07 g/t AuEq or 1,205 g/t AgEq) over 0.7m; hole LRGAG-22-138 with 3.06 g/t Au and 193 g/t Ag (5.64 g/t AuEq or 423 g/t AgEq) over 27.3m, including 15.64 g/t Au and 908 g/t Ag (27.74 g/t AuEq or 2,081 g/t AgEq) over 1.4m, including 5.43 g/t Au and 563 g/t Ag (12.94 g/t AuEq or 970 g/t AgEq) over 1m; hole LRGAG-22-141 with 3.82 g/t Au and 114 g/t Ag (5.34 g/t AuEq or 400 g/t AgEq) over 28.4m, including 43.30 g/t Au and 99 g/t Ag (44.62 g/t AuEq or 3,346 g/t AgEq) over 0.9m, plus 2.10 g/t Au and 189 g/t Ag (4.61 g/t AuEq or 346 g/t AgEq) over 11.4m, including 9.43 g/t Au and 710 g/t Ag (18.89 g/t AuEq or 1,417 g/t AgEq) over 1.3m; and hole LRGAG-22-145 with 1.94 g/t Au and 272 g/t Ag (5.56 g/t AuEq or 417 g/t AgEq) over 42.2m, including 3.7 g/t Au and 700 g/t Ag (13.03 g/t AuEq or 977 g/t AgEq) over 14.1m, including 16.15 g/t Au and 5,740 g/t Ag (92.68 g/t AuEq or 6,951 g/t AgEq) over 0.5m. “These holes, combined with additional drilling in the Los Ricos South Main area, should add value to the upcoming updated Los Ricos South Mineral Resource and Preliminary Economic Assessment”.
- Endeavour Silver Corp., announced its intentions to proceed with the construction of an underground mine and mill at the Terronera project in Jalisco. It will consists of a process plant with 2,000 tonne per day capacity and an initial capital expenditure cost of USD $230M, partially offset by a decrease in sustaining capital to USD $88.3M over the life of the mine. The company expects a 21-month construction period, including 3 to 6 months ramp up to full production with initial production expected in Q4, 2024.
- Heliostar Metals Limited commenced drilling at its Ana Paula property in Guerrero following the re-scoping plans announced previously. The program will consist of 3,000 – 3,600m of drilling in 16 – 24 drill holes, to increase the size and grade of the resource and reserve, provide the geotechnical information required to complete underground mine planning, and provide metallurgical samples testwork designed to improve gold recovery and simplify the mill flow sheet.
ON DEALS AND CORPORATE ISSUES
- Chesapeake Gold Corp., announced the appointment of its VP of Corporate Development and Investor Relations, effective May 29, 2023 (Metates project, Durango).
- Riverside Resources Inc., appointed a new Independent Director and presented results from its annual meeting of shareholders (La Union project, Sonora).
- Canasil Resources Inc signed an option agreement and an exclusivity agreement with Silver Dollar Resources Inc. Pursuant to the agreements, Silver Dollar will provide Canasil with a USD $200K non-interest-bearing loan in return for a two-month exclusivity period to conduct due diligence on the assets of Canasil and an option to earn a 100% interest in Canasil’s Nora property in Durango. Under the terms of the Nora Option, Silver Dollar can earn a 100% interest in the Property by incurring total exploration expenditures of USD $3M and making cash payments totaling USD $375K over five years. Upon earning a 100% interest in the Property, Silver Dollar will grant Canasil a 3% net smelter returns royalty ,with Silver Dollar having the right to buy back 1% of the royalty for USD $3M. After granting the royalty, Silver Dollar will also pay an annual royalty of USD $25K which will be offset against the 1% royalty buyback.
ON SOCIAL RESPONSIBILITY
- No relevant news.
Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.
On the picture above, Cu mineralization (chrysocolla) in a prospect in Chihuahua, Mexico. Photo by Miguel A Heredia.
The Mining and Exploration News in Mexico: Highlights on the Fourth Week of February, 2023.
By Miguel A Heredia
During the 8th week of the year (February 20th to February 26th, 2023), at least 23 press releases were announced by companies working in Mexico, with ten reporting resources and developments of their properties, six communicating production and financial results, two informing on exploration results, two commenting on Mexican issues, one disclosing deals and corporate issues, one announcing financing issues, and one discussing social issues. ON MEXICO ISSUES, Almaden regretted the decision of Mexico´s Ministry of Economy to deny the two mineral title applications which were first made by Almaden in 2002 and 2008, and which in turn led to the grant of mineral titles in 2003 and 2009, respectively. GoGold, Bear Creek, GR Silver, and Guanajuato Silver reported the best drilling intercepts in Mexico on the fourth week of February, 2023. ON EXPLORATION, In Sonora, Tocvan released results from surface channel sampling of selected area for a bulk sample at its Pilar project. In Coahuila, Monumental Minerals provided an update and defined drill targets at its Jemi Heavy Earth Rare Element project. ON MINING, Coeur reported Q4 and full year 2022 production and financial results from its Palmarejo mine in Chihuahua. Starcore announced Q3, 2023 production results from its San Martin mine in Queretaro. Equinox provided 2023 guidance for its Los Filos mine in Guerrero. Bear Creek announced 2023 production guidance for its Mercedes mine in Mexico. Gatos Silver released 2023 production and cost guidance for its Cerro Los Gatos mine in Chihuahua. First Majestic reported Q4 and full year 2022 production and financial results from their Mexican mine operations. ON FINANCING, Silver Tiger closed its previously announced bought deal offering for gross proceeds of approximately CAD $18M (El Tigre project, Sonora). ON RESOURCES AND DEVELOPMENT, GoGold reported additional drilling results from Los Ricos South, within the Eagle and Main Deposits in Jalisco. Guanajuato Silver announced drill results from its San Ignacio mine in Guanajuato. Alamos Gold reported Mineral Reserves and Resources for the year-ended 2022 at its Mulatos project, Sonora. Bear Creek released results of recent drilling from its Marianas and Rey de Oro deposits at its Mercedes mine in Sonora. Chesapeake announced updated Minera Resource Estimate for its world class Metates deposit in Durango. Minera Alamos informed the commencement of drilling at its Santana project in Sonora. GR Silver reported underground drilling results from 35 holes drilled as part of the 2022 infill and exploratory drilling program conducted at its Plomosas project in Sinaloa. Silver Dollar identified five new mineralized target areas at its la Joya project in Durango. Regency Silver announced that two follow-up holes down-dip were completed at its Dios Padre project in Sonora. Vizsla provided a year-end 2022 summary of its activities carried out at its flagship Panuco project in Sinaloa. ON DEALS AND CORPORATE ISSUES, Minera Alamos granted stock options to its management team, Board of Directors, and certain consultants (Santana project, Sonora). ON SOCIAL RESPONSIBILITY, Almaden signed a cooperation agreement with the Ejido Santa Maria Zotoltepec, the ejido located closest to its Ixtaca project in Puebla.
ON MEXICO ISSUE
- Almaden Minerals Ltd., regretted the decision of Mexico´s Ministry of Economy to deny the two mineral title applications which were first made by Almaden in 2002 and 2008, and which in turn led to the grant of mineral titles in 2003 and 2009, respectively. These mineral titles underpin the Ixtaca deposit which was discovered by Almaden in 2010. As previously reported, these mineral titles were reduced to application status as a result of an early 2022 decision of Mexico’s Supreme Court of Justice (SCJN). Almaden believes that this action by the Secretariat of Economy is inconsistent with the Mexican Mining Law, the SCJN decision, and international law. The Company expects to submit arguments challenging the Secretariat of Economy’s submissions to the District Court within the next few days.
- GoGold Resources Inc., Bear Creek Mining Corporation, GR Silver Mining Ltd, and Guanajuato Silver Company Ltd reported the best drilling intercepts in Mexico on the fourth week of February, 2023. Details are shown in the table below:
ON EXPLORATION
- Tocvan Ventures Corp., released results from surface channel sampling of selected area from an up to 1,000 tonnes of oxide-gold bulk sample at its Pilar project in Sonora. Channel sampling was completed every 5m perpendicular to exposed mineralization and alteration at surface along the Main Zone and 4-T trends. Eight locations were sampled to test varying levels of exposed mineralization, all eight trench locations returned anomalous gold and silver values. Highlights include TR-2023-001 where seven samples over a 35m trend returned an average grade of 2.2 g/t Au and 14 g/t Ag, ranging from 8.3 g/t Au to 0.1 g/t Au; TR-2023-002 where five samples over a 20m trend returned an average grade of 2.8 g/t Au and 9 g/t Ag, ranging from 7.1 g/t Au to 0.7 g/t Au; and TR-23-007 where five samples along a 25m trend returned an average grade of 2.2 g/t Au and 30 g/t Ag ranging from 7.3 g/t Au to 0.1 g/t Au. “Bulk Sample material will be extracted and prepared for processing by heap-leach method at a private mining operation less than 25km to the west of Pilar”.
- Monumental Minerals Corp., provided an update and defined drill targets at its Jemi heavy earth rare element project, located in Coahuila State. The exploration program carried out by the exploration team of the company consisted of detailed mapping and rock sampling, regional stream sediment sampling, ground radiometric geophysical surveys, and lithogeochemical sampling. The exploration effort has been focused on the Jemi dikes and Veladora Norte areas, which host peralkaline intrusion related REE mineralization. “Of the 188 samples with assay results, over one third (76 samples) returned values greater than 0.15% total rare earth oxide (TREO), including 5 samples that returned values greater than 1.0% TREO to a maximum value of 2.4% TREO. The average TREO for all samples is 0.21%, and a minimum value of 9 parts per million (ppm), which was returned in an iron-oxide/calcite vein”. This rock sampling has defined a series of high priority drill targets.
ON MINING
- Coeur Mining Inc., reported Q4 and full year 2022 production and financial results from its Palmarejo mine in Chihuahua. On Q4, 2022 the company milled 554,247 tonnes of 1.59 g/t Au and 98 g/t Ag with metallurgical recoveries of 92.4% and 85% respectively to produce approximately 26K Oz Au and 1.49M Oz Ag. It sold 25.2K Oz Au and 1.49M Oz Ag at an average realized price of USD $1,519 per Oz Au and USD $21.10 per Oz Ag. Coeur reported metal sales of USD $69.5.4M; cost applicable to sales (CAS) of USD $47.1M; adjusted CAS per Oz Au of USD $1,027 and adjusted CAS per Oz Ag of USD $14.23; exploration expense of USD $1.5M; cash flow from operating activities of USD $18.9M; total capital expenditures of USD $8.1M; and free cash flow of USD $10.8M. On the full year 2022, Coeur milled approximately 2.2M tonnes of 1.65 g/t Au and 113 g/t Ag with metallurgical recoveries of 92.1% and 84.2% respectively to produce approximately 106.8K Oz Au and 6.71M Oz Ag. It sold 107.1K Oz Au and 6.7M Oz Ag at an average realized price of USD $1,471 per Oz Au and USD $21.78 per Oz Ag. Coeur reported metal sales of USD $303.4M; cost applicable to sales (CAS) of USD $1822.6M; adjusted CAS per Oz Au of USD $883 and adjusted CAS per Oz Ag of USD $13.05; exploration expense of USD $6.6M; cash flow from operating activities of USD $88.4M; total capital expenditures of USD $42.6M; and free cash flow of USD $45.8M.
- Starcore International Mines Ltd., announced Q3, 2023 production results from its san martin mine in Queretaro. The company milled 58,562 tonnes of 1.29 g/t Au and 9 g/t Ag with metallurgical recoveries of 85.24% and 48.95% respectively to produce 2,182 Oz AuEq.
- Equinox Gold Corp., provided 2023 guidance for its Los Filos mine in Guerrero. The company expects to produce between 160K-180K Oz Au at cash and all includes sustaining cost of USD $1,460-USD $1,620 and USD $1,680-USD $1,865 per Oz Au produced respectively; and a sustaining cost of USD $40M.
- Bear Creek Mining Corporation announced 2023 production guidance for its Mercedes mine in Mexico. The company expects to produce 65K-75K Oz Au and 210K-243K Oz Ag during 2023 at an average cash cost per Oz Au in the range of $830-$890 , and all in sustaining cost of $1,120-$1,290 per Oz Au.
- Gatos Silver Inc., released 2023 production and cost guidance for its Cerro Los Gatos mine in Chihuahua. The company expects to produce between 7.4-8.2M Oz Ag, 57-63M Lb Zn in Zn concentrates, 36-40M Lb Pb in Pb concentrates, and 5.4-6.2K Oz Au in Pb concentrates (or 12.4-13.8M Oz AgEq). All in sustaining cost for silver production and silver equivalent production has been estimated in USD $11-13 and USD $15.50-17.50 per Oz payable respectively. Gatos Silver also estimated sustaining capital expenditures at USD $45M; and exploration and definition drilling expenditures at USD $13M, including drilling of the south-east deep zone and district exploration.
- First Majestic Silver Corp., reported Q4 and full year 2022 production and financial results from their Mexican mine operations. The tables below show figures by mine for the period Q4 and full year 2022:
ON FINANCING
- Silver Tiger Metals Inc., closed its previously announced bought deal offering of 58.1M of common shares at a price of CADS $0.31 per share for gross proceeds of approximately CAD $18M. Gross proceeds will be used to continue advancement of its El Tigre mine in Sonora, and for general corporate purposes.
ON RESOURCES AND DEVELOPMENT
- GoGold Resources Inc., reported additional drilling results from Los Ricos South, within the Eagle and Main Deposits in Jalisco. Drilling highlights include hole LRGAG-22-110 on the Eagle Deposits with 1.43 g/t Au and 43 g/t Ag (2 g/t AuEq or 150 g/t AgEq) over 62.4m, including 4.57 g/t Au and 71 g/t Ag (5.52 g/t AuEq or 414 g/t AgEq) over 16m, including 17.05 g/t Au and 189 g/t Ag (19.57 g/t AuEq or 1,468 g/t AgEq) over 1.4m; hole LRGAG-22-113 on the Eagle Deposit with 3.29 g/t Au and 358 g/t Ag (8.06 g/t AuEq or 605 g/t AgEq), including 20.05 g/t Au and 2,000 g/t Ag (46.72 g/t AuEq or 3,504 g/t AgEq) over 1.8m, including 40 g/t Au and 3,490 g/t Ag (86.53 g/t AuEq or 6,490 g/t AgEq) over 0.8m, plus 2.32 g/t Au and 58 g/t Ag (3.09 g/t AuEq or 232 g/t AgEq) over 29.5m, including 5.20 g/t Au and 72 g/t Ag (6.16 g/t AuEq or 462 g/t AgEq) over 12.3m, including 21.10 g/t Au and 170 g/t Ag (23.37 g/t AuEq or 1,752 g/t AgEq) over 1m; hole LRGAG-22-115 on the Eagle Deposit with 1.44 g/t Au and 75 g/t Ag (2.45 g/t AuEq or 183 g/t AgEq) over 31.5m, including 3.38 g/t Au and 147 g/t Ag (5.34 g/t AuEq or 400 g/t AgEq) over 11m, including 12.85 g/t Au and 64 g/t Ag (13.70 g/t AuEq or 1,028 g/t AgEq) over 1; and hole LRGAG-22-227 on the Main Deposit with 1.28 g/t Au and 105 g/t Ag (2.68 g/t AuEq or 201 g/t AgEq) over 29m, including 4.84 g/t Au and 352 g/t Ag (9.54 g/t AuEq or 715 g/t AgEq) over 6.3m, including 24 g/t Au and 335 g/t Ag (28.47 g/t AuEq or 2,135 g/t AgEq) over 0.7m. The Eagle Deposit adjoins the Main Deposit and represents a northern extension of the previously defined Mineral Resource Estimate in the Los Ricos South PEA.
- Guanajuato Silver Company Ltd., announced drill results from its San Ignacio mine in Guanajuato. Drilling highlights include hole UGSI22-005, the best drill hole the company has drilled at any of its mines acquired from Great Panther, with 5.11 g/t Au and 810 g/t Ag (1,219 g/t AgEq) over a true width (TW) of 4.92m, including 25.84 g/t Au and 4,914 g/t Ag (6,981 g/t AgEq) over a TW of 0.42m, including 28.23 g/t Au and 1,693 g/t Ag (3,951 g/t AgEq) over a TW of 0.42m. This significant drill result on the Melladito vein will be followed up with additional drill holes attempting to follow the down dip extension of the vein within the Company’s 2023 drill campaign. In addition, the company is in the midst of driving a 400m access ramp from Melladito to the analogous Purisima vein, which offers the potential for expanded production at San Ignacio mine. Guanajuato Silver also confirmed that it will provide an updated mineral resource estimate which is expected to be completed by Q3, 2023.
- Alamos Gold Inc., reported Mineral Reserves and Resources for the year-ended 2022 at its Mulatos project, Sonora. The company reported Proven + Probable Mineral Reserves of 26,734,000 tons with an average grade of 1.95 g/t Au for a total of 1,679,000 Oz Au contained. Alamos Gold also announced Measured + Indicated Mineral Resources (exclusive of Mineral Reserves) for 10,302,000 tonnes of 2.52 g/t Au for a total of 502K Oz Au contained, and Inferred Resources for 1,774,000 tonnes of 1.27 g/t Au for a total of 72K Oz Au contained. In addition, the company has budgeted a total of USD $17M for exploration in 2023. This budget comprises 16,000m of surface exploration drilling at Puerto del Aire, Gap Victor, and Estrella Zones, and 34,000m for regional exploration on high priority targets, including Halcon, Halcon West, Carricito, Bajios, and Jaspe.
- Bear Creek Mining Corporation released results of recent underground drilling from its Marianas and Rey de Oro deposits at its Mercedes mine in Sonora. Drilling highlights (reported in true widths) include hole UG-MR22-105 collared on Marianas Deposit with 5.68 g/t Au and 6 g/t Ag over 2.8m, plus 12.43 g/t Au and 12 g/t Ag over 2.8m; hole UG- MR22-106 on Mariana Deposit with 41 g/t Au and 24 g/t Ag over 0.8m; hole UG-MAR22-113 on Mariana Deposit with 8.47 g/t Au and 32 g/t Ag over 3m, plus 5.02 g/t Au and 7 g/t Ag over 3m; hole UG-RDO23-075 collared on Rey de Oro Deposit with 10.23 g/t Au and 182 g/t Ag over 3.5m; hole UG-RDO22-077 on Rey de Oro Deposit with 15.35 g/t Au and 109 g/t Ag over 1.03m; and hole M22-934D on GAP Deposit with 6.47 g/t Au and 58 g/t Ag over 2.2m. “The Marianas and GAP drilling represent step-outs from the existing underground mining operations along the main Mercedes vein zone. The Rey de Oro drilling represents extensions downdip and along strike of the existing reserves and underground operations”.
- Chesapeake Gold Corp., announced updated Minera Resource Estimate (MRE) for its world class Metates deposit in Durango. The updated MRE incorporates an additional 23 holes drilled by Chesapeake and has an effective date of January 28, 2023. It include Measured + Indicated Resources for 921.2M tonnes with average grades of 0.57 g/t Au and 14 g/t Ag for a total of 16.77M Oz Au and 423.2M Oz Ag contained, and Inferred Resources for 139.5M tonnes with average grades of 0.47 g/t Au and 13 g/t Ag for a total of 2.13M Oz Au and 59 M Oz Ag contained. “This updated MRE together with on-going metallurgical work will form the basis of a new Pre-Feasibility Study”.
- Minera Alamos Inc., informed the commencement of drilling at its Santana project in Sonora. The company plans to drill a number of gold bearing breccia pipes in the cluster that comprise the Santana project. Some of these priority targets such as Zata and Benjamin Hill have never been drilled before. Over 10,000m of drilling in up to 80 holes have been planned by the company`s exploration team to drill-test the targets.
- GR Silver Mining Ltd., reported underground drilling results from 35 holes drilled as part of the 2022 infill and exploratory drilling program conducted at its Plomosas project in Sinaloa. Drilling highlights ( reported in true widths) include hole PLIP22-30 with 69 g/t Ag, 2.67 g/t Au, 0.1% Pb, 0.2% Zn, and 0.2% Cu (353 g/t AgEq) over 14.1m, including 227 g/t Ag, 5.39 g/t Au, 0.3% Pb, 0.6% Zn, and 0.4% Cu (808 g/t AgEq) over 1.6m, including 219 g/t Ag, 40.18 g/t Au, 0.3% Pb, and 1% Cu (4,075 g/t AgEq) over 0.6m; hole PLIP22-52 with 2 g/t Ag and 1.91 g/t Au (182 g/t AgEq) over 8.1m, including 33 g/t Ag and 64.5 g/t Au (6,033 g/t AgEq) over 0.2M; hole PLIP22-29 with 55 g/t Ag, 1.01 g/t Au, 3.1% Pb, 4.8% Zn, and 0.2% Cu (441 g/t AgEq) over 21.7m, including 299 g/t Ag, 5.42 g/t Au, 1.8% Pb, 9.7% Zn, and 0.6% Cu (1,291 g/t AgEq) over 2.8m; hole PLIP22-35 with 20 g/t Ag, 1.8 g/t Au, 0.5% Pb, 1.5% Zn, and 0.3% Cu (221 g/t AgEq) over 14.2m, including 44 g/t Ag, 1.1 g/t Au, 10.4% Pb, 15.3% Pb, and 0.3% Cu (1,059 g/t AgEq) over 0.2m, including 46 g/t Ag, 6.09 g/t Au, 2.7% Pb, 8.4% Pb, and 0.8% Cu (1,105 g/t AgEq) over 0.8m; and hole PLIP22-42 with 30 g/t Ag, 0.76 g/t Au, 7.9% Pb, 7.9% Zn, and 0.3% Cu (669 g/t AgEq) over 8.3m, including 49 g/t Ag, 0.41 g/t Au, 7.8% Pb, 10.9% Zn, and 1.1% Cu (846 g/t AgEq) over 0.9m, including 50 g/t Ag, 1.97 g/t Au, 19.7 g/t Pb, 15.6% Zn, and 0.3% Cu (1,422 g/t AgEq) over 2.7m.
- Silver Dollar Resources Inc., identified five new mineralized target areas at its la Joya project in Durango. These areas are located in the unexplored portion of the property and were outlined during the last exploration campaign which consisted of geological mapping and sampling. The Verde and Hueco Areas were partially drilled by a previous operator, while Dyke North, Dyke South, and South-East Areas never have been drill tested before.
- Regency Silver Corp., announced that two follow-up holes down-dip from REG-22-01 were completed at its Dios Padre project in Sonora. Hole REG-22-01 intersected 6.84 g/t Au, 22 g/t Ag, and 0.88% Cu over 35.8m, including 13.97 g/t Au, 50 g/t Ag, and 1.11% Cu over 9.8m. Hole REG-23-14 encountered 32m of pyrite-specularite-chalcopyrite supported breccia from approximately 454-486m within a broader zone of disseminated and vein hosted mineralization approximately 25m down dip from REG-22-01, while hole REG-23-15 intersected 120m of specularite-pyrite-chalcopyrite supported breccia from approximately 400-520m within a broader zone of disseminated and vein hosted mineralization approximately 85m down-dip from REG-22-01 and about 62m down-dip from REG-23-14.
- Vizsla Silver Corp., provided a year-end 2022 summary of its activities carried out at its flagship Panuco project in Sinaloa, and outlined the goals for 2023. During Q1, 2022 the company announced its initial mineral resource estimate (MRE) centered on the western portion of the Panuco district. In 2022, Vizsla completed over 121,000m of additional drilling to conclude in an updated MRE on January 2023, with a significant increase in gold and silver as well as in the overall grade. The company also discovered other near-surface, high-grade structures, demonstrating the growth potential outboard of the known resource boundaries. “For 2023, our focus is on incremental expansion and de-risking of the current resource base. With a fully funded +90,000m drill program utilizing seven drill rigs, we plan to update the current Panuco resource estimate in the second half of 2023, which will be followed in due course by an initial Preliminary Economic Assessment”.
ON DEALS AND CORPORATE ISSUES
- Minera Alamos Inc., granted stock options to its management team, Board of Directors, and certain consultants. The Board of Directors approved the issuance of a total of 2.25M options at an exercise price of $0.51, and 6.9M at an exercise price of $0.45. All the options will expire in 5 years and vest 50% on the first anniversary of their grant and 50% on the second anniversary (Santana project, Sonora).
ON SOCIAL RESPONSIBILITY
- Almaden Minerals Ltd., signed a cooperation agreement with the Ejido Santa Maria Zotoltepec, the ejido located closest to its Ixtaca project in Puebla, to support an agro-technological package aimed at sustainable plan nutrition and soil enrichment.
Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.
On the picture above, an outcrop of a flow banded rhyolite in a low-sulphidation epithermal veins prospect in Sonora Mexico. Photo by Miguel A Heredia.
The Mining and Exploration News in Mexico: Highlights on the Second Week of January, 2023.
fault-plane displaying slickensides
By Miguel A Heredia
During the 2nd week of the year (January 09th to January 15th, 2023), at least 30 press releases were announced by companies working in Mexico, and 4 news published by the media with nine communicating production and financial results, seven reporting resources and developments of their properties, five disclosing deals and corporate issues, five informing on exploration results, four announcing financing issues, and four commenting on Mexican issues. ON MEXICO ISSUES, The Ministry of the Environment and Natural Resources (SEMARNAT) withdrew the permit to Fortuna Silver Mines, which operates the San José mine in Oaxaca through the company Minera Cuzcatlán. Compañía Minera Cuzcatlán (Fortuna Silver) responded to SEMARNAT that it is operating normally at its San José mine in Oaxaca under complete legality. Mining companies shine at the beginning of the year on the Mexican Stock Exchange. The governments of Mexico and Canada have agreed to strengthen resilience in the supply chain in which both countries participate, reported Mary Ng, Minister of International Trade, Export Promotion, Small Business and Economic Development of Canada. Prime Mining, Tocvan Ventures, Oroco, and Silver Tiger reported the best drilling intercepts in Mexico on the second week of January, 2023. ON EXPLORATION, In Sonora, Aztec Minerals presented a summary of the results from its recently completed 2022 drilling program at its Cervantes project, Colibri completed additional drilling on its Evelyn project, Tocvan drill intersected a broad zone of gold at its El Picacho project, and Riverside provided a corporate outlook for 2023. In Sinaloa, Prismo Metals released results from the remaining holes from its now completed 2022 drill program at its Palos Verdes project. ON MINING, Aura, Alamos Gold, Americas, Endeavour, Gatos Silver, GoGold, Golden Minerals, and Torex announced Q4 and full-year 2022 production from their Mexican operations, and Altaley reported pre-production results during mill commissioning at its Tahuehueto property in Durango. ON FINANCING, Canuc closed a non-brokered private placement for gross proceeds of CAD $680K (San Javier project, Sonora). Guanajuato Silver closed the second and final tranche of its non-brokered private placement offering totaling CAD $8.5M (El Cubo, San Ignacio, and Valenciana mines, Guanajuato). Fabled announced that it plans to complete a non-brokered private placement for gross proceeds of up to CAD $1.5M (Santa Maria property, Chihuahua). Altaley entered into a debt settlement agreement with an arms’ length mining contractor to settle CAD $1,176,297 which is owing to the contractor as a result of underground mine development work (Tahuehueto mine, Durango). ON RESOURCES AND DEVELOPMENT, Regency Silver announced recommencement of the 2023 drilling program at its Dios Padre property in Sonora, as well as the commencement of an IP survey. Discovery outlined its 2023 work program and budget for its Cordero property in Chihuahua. Oroco released further assay results from the North Zone drilling program at its Santo Tomas project in Sinaloa. Prime Mining presented results from 48 drill holes collared in the Z-T area at its Los Reyes project, Sinaloa. Silver Tiger released results from its ongoing drilling program being conducted at its El Tigre project, Sonora. Sailfish announced results from its recently drilling program conducted at its Gavilanes property in Durango. Silver Viper reported positive geophysical and geochemical survey results at its Virginia project, Sonora. ON DEALS AND CORPORATE ISSUES, Santacruz announced the appointment of its new CFO (Zimapan property, Hidalgo). Excellon announced that its Board of Directors has approved the voluntary delisting of its common shares from the New York Stock Exchange (La Platosa mine, Durango). Fabled´s shareholders approved a share consolidation of the outstanding securities of the Company on an up to ten for one basis (Santa Maria property, Chihuahua). Vizsla completed strategic investment in the acquisition of Palos Verdes project, Sinaloa from Prismo Metals. ON SOCIAL RESPONSIBILITY, no relevant news.
ON MEXICO ISSUE
- The Ministry of the Environment and Natural Resources (SEMARNAT) withdrew the permit to Fortuna Silver Mines, which operates the San Jose mine in Oaxaca through the company Minera Cuzcatlán since, according to SEMARNAT, it incurred in several irregularities. Such permit had been previously granted by some servants of SEMARNAT. In 2022, SEMARNAT said that it had been a misspelling to have issued a permit for 12 more years for the operation of this company. SEMARNAT was even questioned for providing legal advice to the company in order to obtain the environmental impact authorization and the regularization of construction of works for which it did not have authorization. With the suspension of the permit, SEMARNAT said that the company can appeal and resort to its influence peddling as it has done since its settlement in Oaxaca. However, if the judges confirm the resolution, it must withdraw and return the land to its owners, in addition to repairing the damage caused by the excessive pollution it has generated in the area.
- Compañia Minera Cuzcatlán (Fortuna Silver) responded to SEMARNAT that it is operating normally at its San Jose mine in Oaxaca under complete legality. Derived from the notification received by the Ministry of the Environment and Natural Resources (SEMARNAT) at the beginning of 2023, regarding the intention of evaluating the MIA (Environmental Impact Statement) granted legally and correctly in December 2021, it is notified that this new procedure does not affect the daily activities of the Company, thus confirming that the San José Mining Unit, located in San José del Progreso, Oaxaca, is operating normally. Fortuna Silver Mines, communicated on January 5 of this year, that its San José Mining Unit, which operates through its subsidiary Compañía Minera Cuzcatlán, fully complies with all current environmental laws, for which it has expressed its disagreement and is taking legal measures to protect its more than 1,200 employees, a value chain made up of more than 600 companies, 150 of them from the area, as well as an annual income of more than MXP $600M that benefits more than 30,000 people in the Central Valleys of Oaxaca. “Likewise, the Company highlights that, in 11 years of operation, it has been inspected 15 times by the Federal Attorney for Environmental Protection (PROFEPA), in turn it has registered two inspections by the National Water Commission (CONAGUA), who in none of their proceedings have ruled on facts and/or indications of contamination at the site or derived from the operation of the San José Mine. Finally, Compañía Minera Cuzcatlán reiterates its commitment to continue working together with neighboring communities to improve and expand the social benefits of its operation, through sustainable development initiatives”.
- Mining companies shine at the beginning of the year on the Mexican Stock Exchange. The increase in the price of metals such as gold, silver and copper, supported the rebound in the price of the shares of companies in the Mexican market these days. Industrias Peñoles and Grupo México are framed as the first and third issuers in the S&P/BMV IPC index, which brings together the 36 largest firms in the Mexican stock market, which have accumulated the most performance in these first days of 2023. In the first case its shares maintain gains of 21.55%, at a price of 291.30 pesos per unit, in the first six business days of January. For the second, the return has been 18.35%, at 80.96 pesos.
- The governments of Mexico and Canada have agreed to strengthen resilience in the supply chain in which both countries participate, reported Mary Ng, Minister of International Trade, Export Promotion, Small Business and Economic Development of Canada. Mexico, Canada, and the United States have agreed to joint actions to strengthen their supply chains both regionally and globally. In 2021, the Joe Biden Administration launched its Bailout for America, under the Bailout for America Act of 2021, signed into law in March.
- Prime Mining Corp., Tocvan Ventures Corp., Oroco Resource Corp., and Silver Tiger Metals Inc., reported the best drilling intercepts in Mexico on the second week of January, 2023. Details are shown in the table below:

ON EXPLORATION
- Aztec Minerals Corp., presented a summary of the results from its recently completed RC and oriented core holes 2022 drilling program at its Cervantes project in Sonora. It consisted of 26 RC holes totalling 5,248.6m, and 11 oriented core holes totalling 2,588m. Combined 2022 drilling program totaled 37 holes and 7,836.6m on California, California Norte, Purisima East and Jasper targets. All the holes collared in 2022 at California and California Norte targets, except one, encountered near surface, oxidized gold mineralization with minor copper values. Now, California target has been expanded to approximately 900m long E-W by 730m wide N-S, and with continuous mineralization of up to 170m depth. “The porphyry gold-copper mineralization is still open in all directions with anomalous mineralization and alteration up to 265m depth vertically. The California and California Norte targets appear to be merging from drilling and surface exposures”. At Jasper target, step out 600m west of the California Zone, the drilling program intercepted broad alteration and strongly oxidized, argillically altered, and brecciated siltstone-quartzite sediments. “Strong copper oxide mineralization is found on outcrops and in the drilling. Sulfides have not yet been found in drilling to 209 m depth, suggesting the there is a possibility to encounter a secondary sulfide enrichment blanket”. “At the Purisima Este target drilling found anomalous Au and multi-element mineralization related to the edges of its diatreme-breccia pipe related to quartz feldspar intrusive and follow-up work is planned”. Drilling highlights of the 2022 program include hole CAL22-001 with 1.04 g/t Au over 94m, including 3.96 g/t Au over 55m, and 0.36% over 55m; hole CAL 22-004 with 1.0 g/t Au over 65m, including 4.25 g/t Au over 24.4m, and 0.065% Cu over 160m; hole CAL 22-005 with 1.49 g/t Au, including 3.42 g/t Au over 51.7m, and 0.091% Cu over 119m; hole CAL 22-006 with 0.75 g/t Au, including 3.08 g/t Au over 9.14m, and 0.1% Cu over 138m; hole 0.87 g/t Au over 152m, including 2.05 g/t Au over 33.5m, and 0.095% Cu over 123m; hole CAL 22-027 with 0.68 g/t Au over 120m, including 1.46 g/t Au over 27m; and hole CAL 22-031 with 0.56 g/t Au over 135m, including 2.29 g/t Au over 12m.
- Colibri Resource Corporation completed additional drilling on its Evelyn project in Sonora, which included 3 diamond holes totaling 1,063m, 5 reverse circulation holes totaling 1,205m, and 130 short RC holes totaling 1,548 m to penetrate alluvium and sample the top of bedrock.
- Tocvan Ventures Corp., announced results from 3 out of 10 holes drilled at its Picacho project in Sonora. The company reported that hole SRA-22-003 intersected a broad zone of gold, returning 0.3 g/t Au and 0.5 g/t Ag over 48.8m, including 0.51 g/t Au and 0.8 g/t Ag over 27.5m, including 0.71 g/t Au and 1 g/t Ag over 19.8m, including 1.14 g/t Au and 1 g/t Ag over 12.2m, and including 4.73 g/t Au and 2 g/t Ag over 1.5m. Results for the remaining seven drillholes are pending.
- Riverside Resources Inc., provided a corporate outlook for 2023 of the company´s growth plans. Highlights include look for a new strategic alliance with a major base metal producer; to drill-test with partner funds at least one project in H1, 2023 (BHP); look for new partnership to advance its La Union property in Sonora after high-grade results in 2022; and farm-out its Cecilia project in Sonora, which has a proposed drilling program to be executed at the property.
- Prismo Metals Inc., released results from the remaining holes from its now completed 2022 drill program at its Palos Verdes project, Sinaloa, which consisted of eight holes totalling 2,100m. The best drill intercept was encountered in hole PV-22-17 with 0.43 g/t Au, 115 g/t Ag, 0.28% Cu, 0.47% Pb, and 0.81% Zn (200 g/t AgEq) over a true width (TW) of 3m, including 1.18 g/t Au, 297 g/t Ag, 0.56% Pb, 1.18% Pb, and 1.97% Zn (516 g/t AgEq) over a TW of 1.05m.
ON MINING
- Aura Minerals Inc., reported that it produced 28,591 gold equivalent ounces during Q4, 2022 from its Aranzazu mine, Zacatecas.
- Alamos Gold Inc., reported Q4 and annual 2022 production results from its Mulatos mine in Sonora, and provided updated three-year production and operating guidance. In Q4, 2022 the company produced 49,100 Oz Au at an average grade of 0.78 g/t Au. Alamos expects to produce over 175K-185K Oz Au at an average grade of 0.73 g/t Au in 2023 with a total cash cost in te range of USD $900-USD $950 per Oz Au; an all included sustaining cost of USD $950-1,000 per Oz Au; a sustaining capital of USD $10M; grow capital of USD $5-10M (a total sustaining and grow capital of USD $19-24M); capitalized exploration of USD $4M; an a total capital expenditures and capitalized exploration of USD $19-24M. Production for 2024 and 2025 is expected to be in the range of 140-150K Oz Au and 110-120K Oz Au respectively.
- Altaley Mining Corporation reported pre-production results during mill commissioning at its Tahuehueto property in Durango. Tahuehueto is currently operating one ball mill in a commissioning phase, as part of the initial 500 tonnes per day project, producing precious metals-rich, commercial grade lead and zinc concentrates. The company produced in Q4, 2022 862 tonnes of Pb concentrate with grades of 26.31% Pb, 76.72 g/t Au, and 643 g/t Ag with metallurgical recoveries of 76.68%, 76.72%, and 68.115 respectively; and 878 tonnes of Zn concentrate with grades of 47.51% Zn, 7.5 g/t Au, and 145 g/t Ag with metallurgical recoveries of 54.31%, 13.23%, and 15.12% respectively.
- Americas Gold and Silver Corporation reported Q4 and annual year 2022 production from its Cosala mine operation in Sinaloa. It produced 196K Oz Ag, 3.8M Lb Pb, and 10.4M Lb Zn during Q4, 2022, and 636K Oz Ag, 15.3M Lb Pb, and 39.3M Lb Zn in the full-year 2022.
- Endeavour Silver Corp., released Q4 and full-year 2022 production results from their Mexican mine operations. Consolidated figures for Q4 and annual 2022, compared to the year 2021 are shown in the table below:

Figures by mine for the period Q4, and full year 2022 are shown in the tables below:


- Gatos Silver Inc., announced guidance and Q4 and full year 2022 production results from its 70% owned Cerro Los Gatos, Chihuahua. On te period Q4, 2022 (100% Basis), the company milled 261,929 tonnes of 387 g/t Ag, 3.7% Zn, 1.9% Pb, and 0.3 g/t Au with metallurgical recoveries of 89.6%, 62.7%, 86.3%, and 53.9% respectively, to produce 2.9M Oz Ag, 13.5M Lb Zn, 9.7M Lb Pb, and 1.4K Oz Au. For the full-year 2022, the company reported production of 10.3M Oz Ag, 60.7M Lb Zn, 45.9M Lb Pb, and 5.3K Oz Au. 2022 guidance announced by Gatos Silver was 9.35-9.65M Oz Ag, 58-61M Lb Zn, 43-45M Lb Pb, and 5.0-5.3K Oz Au. Zinc, lead and gold production increased during 2022, with zinc and gold near the high end of guidance, and lead near the guidance midpoint. Compared with 2021, zinc production increased by 22%, lead production by 10%, and gold production by 2%. As of December 2022, the company reported a cash balance of $17M and outstanding balance of the company´s credit facility of $9M.
- GoGold Resources Inc., reported Q4, 2022 production results from its Parral Tailings project, Chihuahua. The company produced 159,838 Oz Ag, 2,399 Oz Au, and 497.3K Lb Cu (441,217 Oz AgEq).
- Golden Minerals Company announced Q4, and full-year 2022 production and financial results from its Rodeo project, Durango. The company in Q4, 2022 mined 161,244 tonnes and processed 52,736 tonnes of 2 g/t Au and 10 g/t Ag with metallurgical recoveries of 73.3% and 82% respectively, to produce 2,398 payable Oz Au (in doré) and 13,560 payable Oz Ag (in doré) or 2,568 payable Oz AuEq (in doré). Golden sold 2,518 Oz Au and 14,217 Oz Ag (2,696 Oz AuEq), at realized prices, before refining and selling costs of USD $1,729.40 and USD $21.69 respectively. For the full year 2022, Golden mined 771,485 tonnes and processed 195,599 tonnes of 2.6 g/t Au and 11 g/t Ag with metallurgical recoveries of 74.7% and 81.2% respectively, to produce 11,982 payable Oz Au (in doré) and 52,179 payable Oz Ag (in doré) or 12,616 payable Oz AuEq (in doré). Golden sold 12,451 Oz Au and 53,486 Oz Ag (13,101 Oz AuEq), at realized prices, before refining and selling costs of USD $1,805.34 and USD $21.93 respectively.
- Torex Gold Resources Inc., reported Q4 and full-year 2022 production results from El Limón-Guajes mine complex, Guerrero. The company produced 116,196 Oz Au in Q4 to total 474,035 Oz Au in the full-year 2022. It surpassed the upper end of the guided range of 430K-470K Oz Au. Torex sold in Q4, 2022 121,913 Oz Au for a total of 473,122 Oz Au in the full-year 2022.
ON FINANCING
- Canuc Resources Corporation issued 8.5M of common shares at a price of CAD $0.08 per common share to close a non-brokered private placement for gross proceeds of CAD $680K. Most of the gross proceeds will be used for exploration on the San Javier project, Sonora.
- Guanajuato Silver Company Ltd., closed the second and final tranche of its non-brokered private placement offering. The company issued 4,080,486 common shares for gross proceeds of CAD $1,734,206.55 in the second tranche for a total offering of CAD $20,032,682 for gross proceeds of CAD $ 8,513,889.85. The net proceeds of the offering will be used to, among other things, ramp up production at the Company’s existing mines in and about Guanajuato, Mexico including El Cubo, San Ignacio and Valenciana, expand and modernize the processing facilities at the Topia mine in Durango, Mexico, increase brownfields’ exploration programs, and fund general and administrative expenses.
- Fabled Silver Gold Corp., announced that it plans to complete a non-brokered private placement for gross proceeds of up to CAD $1.5M at a price of CAD $0.10 per common share. Net proceeds will be used to make required property payments, to further explore the Santa Maria Property, and for general working capital.
- Altaley Mining Corporation entered into a debt settlement agreement with an arms’ length mining contractor to settle CAD $1,176,297 which is owing to the contractor as a result of underground mine development work. The Company and the contractor have agreed that the issuance to the contractor of 735,186 common shares of the company at a deemed price of CAD $1.60 per common share will extinguish and settle the debt.
ON RESOURCES AND DEVELOPMENT
- Regency Silver Corp., announced recommencement of the 2023 drilling program at its Dios Padre property in Sonora, as well as the commencement of an IP survey. The company plans to drill a minimum of 3,000m as an initial follow up to the successful drilling program completed in August, 2022. It also will commence an IP survey to provide 3D information to a depth of 800m. “The current drill and IP program is designed to determine more specifically what type of broad, mineralizing system is present at Dios Padre”.
- Discovery Silver Corp., outlined its 2023 work program and budget for its Cordero property in Chihuahua. The goal is to complete the Pre-Feasibility Study (PFS) later this month and will be focused on optimization opportunities including improved mining and processing efficiencies, as well as complete a Feasibility Study (FS) in Q1, 2023.. Alongside this work, Cordero has allocated drill metres to the exploration potential on the large, highly-prospective land package owned by the company. “Construction permitting for Cordero will be undertaken in-parallel with the FS work, with the submission of the Environmental Impact Statement (MIA) expected to be made to the Mexican Federal Environmental Department (SEMARNAT) in the first half of 2023. Assuming a 12 to 18 month permitting timeline, this would position the Company to make a construction decision in the second half of 2024. The 2023 work programs are budgeted at $26 million. The Company is well positioned to fund this work with a cash balance of over $45 million and no debt at the end of 2022.
- Oroco Resource Corp., released further assay results from the North Zone drilling program at its Santo Tomas project in Sinaloa. Holes N039 to N043 totalled 2,668 m of drilling which demonstrated continuity of good grade mineralization. Highlights include hole NO39 with 0.14% Cu, 0.002% Mo, 0.01 g/t Au and 1 g/t Ag (0.15% CuEq) over 58m, plus 0.46% Cu, 0.005% Mo, 0.016 g/t Au, and 4 g/t Ag (0.49% CuEq) over 21.4m, plus 0.31% Cu, 0.01% Mo, 0.02 g/t Au and 2 g/t Ag (0.36% CuEq) over 265m; hole NO40 with 0.21% Cu, 0.007% Mo, 0.012 g/t Au, and 2 g/t Ag (0.24% CuEq) over 41m, plus 0.29% Cu, 0.009% Mo, 0.013 g/t Au, and 3 g/t Ag (0.33% CuEq) over 152.1m; hole N041 with 0.3% Cu, 0.002% Mo, 0.003 g/t Au, and 1 g/t Ag (0.35% CuEq) over 20.6m, plus 0.47% Cu, 0.006% Mo, 0.038 g/t Au, and 2 g/t Ag (0.52% CuEq) over 96m; and hole N042 with 0.53% Cu, 0.005% Mo, 0.075 g/t Au, and 3 g/t Ag (0.60% CuEq) over 135m.
- Prime Mining Corp., presented results from 48 drill holes collared in the Z-T area at its Los Reyes project, Sinaloa. Drilling highlights include holes 22TA-51 with 2.5 g/t Au and 278 g/t Ag (6.1 g/t AuEq) over a true width (TW) of 3,1m, plus 10 g/t Au and 131 g/t Ag (11.6g/t AuEq) over a TW of 3.1m, including 28.5 g/t Au and 310 g/t Ag (32.5 g/t AuEq) over a TW of 1.1m; hole 22ZAP-87 with 4.7 g/t Au and 103 g/t Ag (6 g/t AuEq) over a TW of 8.7m, including 39.6 g/t Au and 174 g/t Ag (41.9 g/t AuEq) over a TW of 0.7m, and 8.6 g/t Au and 163 g/t Ag (10.7g/t AuEq) over a TW of 1.0m; hole 22TA-44 with 2.7 g/t Au and 451 g/t Ag (8.6 g/t AuEq) over a TW of 4.8m, including 4.8 g/t Au and 821 g/t Ag (15.4 g/t AuEq) over a TW of 2.3m; hole 22 ZAP-82 with 1.3 g/t Au and 22 g/t Ag (1.6 g/t AuEq) over a TW of 13m, including 13 g/t Au and 48 g/t Ag (13.6 g/t AuEq) over a TW of 0.8m, plus 3.6 g/t Au and 20 g/t Ag (3.8 g/t AuEq) over a TW of 13.8m,including 22.2 g/t Au and 41 g/t Ag (22.8 g/t AuEq) over a TW of 1.9m; hole 22TA-43 with 4.2 g/t Au and 59 g/t Ag (4.9 g/t AuEq) over a TW of 5.4m, including 23.6 g/t Au and 103 g/t Ag (24.9 g/t AuEq) over a TW of 0.8m; and hole 22SMW-12 with 6.9 g/t Au and 33 g/t Ag (7.3 g/t AuEq) over a TW of 14.8m, including 9.1 g/t Au and 31 g/t Ag (9.5 g/t AuEq) over a TW of 8.9m, including 21 g/t Au and 55 g/t Ag (21.7 g/t AuEq) over a TW of 1.5m.
- Silver Tiger Metals Inc., released results from its ongoing drilling program being conducted at its El Tigre project, Sonora. Drilling highlights include hole ET-22-333with 0.46 g/t Au, 429 g/t Ag, 0.07% Cu, 0.04% Pb, and 0.06% Zn (474 g/t AgEq) over 10.1m on Seitz Kelly Shale Zone, including 0.83 g/t Au, 3,639 g/t Ag, 0.61% Cu, 0.14% Pb, and 0.14% Zn (3,767 g/t AgEq) over 1.2m, including 0.22 g/t Au, 6,063 g/t Ag, 1% Cu, 0.14% Pb, and 0.09% Zn (6,182 g/t AgEq) over 0.7m; hole ET-22-333 with 0.14 g/t Au, 307 g/t Ag, 0.07% Cu, 0.2% Pb, and 0.2% Zn (337 g/t AgEq) over 2.4m on El Tigre Vein, including 0.32 g/t Au, 778 g/t Ag, 0.17% Cu, 0.4% Pb, and 0.6% Zn (849 g/t AgEq) over 0.9m, plus 0.25 g/t Au, 69 g/t Ag, 0.13% Cu, 0.5% Pb, and 1% Zn over 18.6m on the Seitz Kelly Shale Zone, including 0.25 g/t Au, 778 g/t Ag, 1.69% Cu, 7.1% Zn, and 15% Zn (1,633 g/t AgEq) over 1.1m on the Seitz Kelly Vein; and hole ET-22-335 with 0.15 g/t Au, 331 g/t Ag, 0.24% Cu, 0.2% Pb, and 0.5% Zn (386 g/t AgEq) over 4.3m on Seitz Kelly Vein, including 0.15 g/t Au, 2,343 g/t Ag, 1.67% Cu, 1.36% Pb, and 3.32% Zn (2,658 g/t AgEq) over 0.6m.
- Sailfish Royalty Corp., announced results from its recently exploration work conducted at its Gavilanes property in Durango. Gavilanes comprises multiple high-grade polymetallic silver veins located approximately 30 km away from First Majestic’s San Dimas mine operation. Sailfish has drilled 47 shallow diamond drill holes on three of these veins which host mineralization in veins and stockworks of an intermediate sulphidation epithermal system. Sailfish geologists have collected representative chip channel samples across veins or structures, which returned encourages high-grade values. Highlights include 12.80 g/t Au and 48 g/t Ag over 2.5m and 0.87 g/t Au and 40 g/t Ag over 18m on Descubridora Vein; 30 g/t Au and 190 g/t Ag over 1m and 0.84 g/t Au and 754 g/t Ag over 2m on San Nicolas Vein; 0.02 g/t Au and 1,867 g/t Ag over 1m on San Nicolas-Veta del Pueblo; 10.12 g/t Au and 16 g/t Ag over 2.2m on Forasteros Vein; and 0.51 g/t Au and 1,546 g/t Ag over 0.51m pon La Cruz Vein. Gavilanes currently has an inferred mineral resource of 2.833M tonnes at an average grade of 246 g/t AgEq (22.4M Oz AgEq). This inferred mineral resource is highlighted by having 18.9M Oz Ag at an average grade of 207 g/t Ag.
- Silver Viper Minerals Corp., reported positive geophysical and geochemical survey results at its Virginia project, Sonora. Detailed mapping and geochemical sampling following a TITAN MT deep penetrating Geophysical survey conducted in Q2, 2022 identified new targets at El Molino, along the Macho trend. “Geological mapping and rock and chip-channel sampling has outlined new targets at Los Cantiles, El Oriental and the eastern and southern sectors of Macho Libre. The new prospecting area, Los Cantiles, garnered surface chip channel sample results up to 5.7 g/t Au and 148 g/t Ag. Dump samples up to 17.8 g/t Au and 1,001 g/t Ag, and chip-channel samples up to 4.2 g/t Au and 310 g/t Ag, have been located at the El Oriental Target. Hydrothermal silicified breccia with up to 2.36 g/t Au and 71 g/t Ag has been outlined at the Macho Libre Target. At El Molino, several new structures have been outlined, containing breccias with quartz boiling type textures, with initial results up to 1.6 g/t Au and most analytical results pending. At El Molino, ongoing soil sampling reveals continuous gold and silver anomalies, with supportive infill results from north-west to south-east along the trend”.
ON DEALS AND CORPORATE ISSUES
- Santacruz Silver Mining Ltd., announced the appointment of its new CFO and Corporate Secretary of the Company effective January 9, 2023 (Zimapan property, Hidalgo).
- Excellon Resources Inc., announced that its Board of Directors has approved the voluntary delisting of its common shares from the New York Stock Exchange (NYSE)and the deregistration with the U.S. Securities and Exchange Commission (SEC) (La Platosa mine, Durango).
- Fabled Silver Gold Corp´s shareholders approved a share consolidation of the outstanding securities of the Company on an up to ten for one basis. The board of directors of the company has now determined to proceed with the consolidation on a five to one basis. As of today’s date, the company has 215,446,649 common shares issued and outstanding. Following the completion of the consolidation (but before giving effect to the offering), the number of issued and outstanding common shares of the company will be approximately 43,089,330. (Santa Maria property, Chihuahua).
- Vizsla Silver Corp., completed strategic investment in the acquisition of Palos Verdes project, Sinaloa from Prismo Metals Inc. Vizsla acquired a right of first refusal to purchase the Palos Verdes project from Prismo, and 4M units of Prismo at a price of $0.50 per Prismo unit, for aggregate consideration of $2M. Each Prismo unit consist of one common share of Prismo and one-half of one common share purchase warrant. Each Prismo Warrant entitles Vizsla to purchase one additional Prismo Share for a period of two years from the closing date at a price of $0.75.The consideration for the Strategic Investment consisted of a cash payment of $500K and the issuance to Prismo of 1M common shares of Vizsla. The Consideration Shares are subject to a statutory hold period of four months and one day, and a voluntary escrow period of 24 months with 25% of the securities released every six months.
ON SOCIAL RESPONSIBILITY
- No relevant news.
Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.
On the picture above, a fault-plane displaying slickensides in a Mn-Fe hydrothermal breccia in a project in Chihuahua, Mexico. Photo by Miguel A Heredia.
The Mining and Exploration News in Mexico: Highlights on the Fifth Week of December, 2022.
Ginguro texture in banded quartz vein-breccia
By Miguel A Heredia
During the 52nd week of the year (December 26th to January 1st, 2022), at least 9 press releases were announced by companies working in Mexico, and 1 news published by the media with three disclosing deals and corporate issues, two informing on exploration results, two reporting resources and developments of their properties, and two announcing financing issues. ON MEXICO ISSUES, Mining in Mexico closed 2022 with more expenses in exploration due to lack of mining concessions. ON EXPLORATION, In Sonora, Tocvan provided an annual summary of the activities carried out in 2022 at its Pilar and Picacho properties. In Chihuahua, Mammoth provided a year-end update on activities developed at its Tenoriba project. Zacatecas Silver provided a summary of the 2022 exploration activities developed at its Zacatecas Silver and Esperanza projects located in Zacatecas and Morelos States respectively. ON MINING, no relevant news. ON FINANCING, Guanajuato Silver closed the first tranche of its non-brokered private placement for gross proceeds of CAD $6.8M (El Cubo, San Ignacio, and Valenciana mines, Guanajuato). Regency completed a non-brokered private placement for gross proceeds of CAD $2,159,000 (Dios Padre Project, Sonora). ON RESOURCES AND DEVELOPMENT, MAG Silver reported that final testing of the downstream power distribution and control systems at its Juanicipio project in Zacatecas is now complete. Zacatecas Silver provided a summary of the 2022 exploration activities developed at its Zacatecas Silver and Esperanza projects located in Zacatecas and Morelos States respectively. ON DEALS AND CORPORATE ISSUES, Sierra Madre provided an update on its proposed acquisition of the La Guitarra mine in the State of Mexico. Gatos Silver provided a bi-weekly default status report in accordance with National Policy 12-203 – Management Cease Trade Orders (Cerro Los Gatos mine, Chihuahua). Mammoth announced the issuance of 2,206,000 common share stock options to directors, officers, and contract employees, exercisable at a price of $0.05 per common share (Tenoriba project, Chihuahua). ON SOCIAL RESPONSIBILITY, no relevant news.
ON MEXICO ISSUE
- Mining in Mexico closed 2022 with more expenses in exploration due to lack of mining concessions. The current administration of President Andres Manuel Lopez Obrador has not approved new mining concessions, which has led mining companies to invest more in exploration, with a view of finding new deposits in previously granted ground. In 2018, the concessioned area for mining activities in Mexico was of 10.64%, a figure that by the end of this 2022 stands at 8.59%, according to data from the Ministry of Economy.
ON EXPLORATION
- Tocvan Ventures Corp., provided an annual summary of the activities carried out in 2022 at its Pilar and Picacho properties in Sonora. At Pilar project, the company executed the first core drilling program which was successful in intersecting broad gold mineralization across the Main Zone with one hole returning 1.2 g/t Au over 116.9m, including 12 g/t Au over 10.2m, an a second hole returning 0.8 g/t Au over 108.9m, including 7.6 g/t Au over 9.4m. “Infill and recognizing drilling at Pilar has confirmed that gold mineralization occurs in at least three parallel zones to the Main Zone across a 600m wide area and so far defined along 600m of strike, the same that based on surface indications and historic workings seems to continue for another 600m towards the southeast”. Column Leach studies from surface material at Pilar returned above regional average recovery for gold, reporting over 85% recovery from initial metallurgical testing. At El Picacho property, surface work outlined key target areas across the large 24 square-km project area. An initial drill program was completed at its San Ramon Prospect, but results are pending to be released.
- Mammoth Resources Corp., provided a year-end update on activities developed at its Tenoriba project, Chihuahua. Highlights include the report of the final six drill holes of a 27-hole diamond drill program for a total of 3,244.25m. To date, Mammoth has drill-tested five targets zones within three project areas: El Moreno, Masuparia, and Carneritos, with 55 holes totalling 8,158.25m. “These project areas measure from hundreds of meters to over 1 km in strike length, along a 4km, east-west trend of gold-silver mineralization identified in 3-D modelling incorporating data from over 3,000 soil, chip and channel samples, 26 prior diamond drill holes, geological and structural mapping, and the potential continuity at depth of surface mineralization as indicated by an Induced Polarization/Magnetometer (IP/Mag) geophysical survey”. The company is currently conducting additional studies on the results of the 27 holes, including metallurgical testing, as well as the assessment by a third party resource modelling expert to recommend drill spacing to estimate a maiden mineral resource at the Tenoriba project. The company is also working on a technical report to communicate findings, conclusions, and recommendation for future work.
ON MINING
- No relevant news.
ON FINANCING
- Guanajuato Silver Company Ltd., issued a total of 15,952,196 units at a price of CAD $0.425 per unit to close the first tranche of its non-brokered private placement for gross proceeds of CAD $6.8M. Net proceeds will be used to ramp up production at the Company’s existing mines in and about Guanajuato, Mexico including El Cubo, San Ignacio and Valenciana, expand and modernize the processing facilities at the Topia mine in Durango, Mexico, increase brownfields’ exploration programs, and fund general and administrative expenses. The closing of a second tranche of the Offering is expected to occur on or about January 12, 2023.
- Regency Silver Corp., completed a non-brokered private placement of 10,795,000 common shares at a price of CAD $0.20 per share for gross proceeds of CAD $2,159,000. The company paid a finder´s fee of CAD $16K in cash in connection with part of the closing of the private placement. Net proceeds will be used for work programs on the properties of Regency Silver including drilling and geophysics in early January 2023 on our flagship Dios Padre property, for property payments on other properties of the Company and for general working capital.
ON RESOURCES AND DEVELOPMENT
- MAG Silver Corp., received confirmation from Fresnillo plc that final testing of the downstream power distribution and control systems at its Juanicipio project in Zacatecas is now complete. The entire system has now been energized and Juanicipio has been connected to the national power grid.
- Zacatecas Silver Corp., provided a summary of the 2022 exploration activities developed at its Zacatecas Silver project in Zacatecas State, and Esperanza project in Morelos State. At Zacatecas project, the company filed a NI 43-101 technical report to support its initial Mineral Resource Estimate on the Panuco Vein located within the Zacatecas Silver project. After filing the technical report, the company reported multiple high grade silver intercepts from drilling in an area north of the resource, named Panuco North and in an area of the property named El Cristo, which is an extension of the prolific Veta Grande Silver Vein on the Zacatecas Silver Property. At Esperanza project, the company completed an initial Mineral Resource Estimate outlining a high grade oxide gold deposit with significant exploration potential, and reported that a Pre-Feasibility Study is underway to support high margin, high grade, low capex, and low cost production. In addition, the company announced that multiple community programs continue to function and grow, including projects relating to health, education, and environment.
ON DEALS AND CORPORATE ISSUES
- Sierra Madre Gold and Silver ltd., entered an arm´s length definitive agreement with First Majestic on May 25, 2022 to acquire a 100% interest in the 39,714-hectare La Guitarra mine in the State of Mexico and provided an update on its proposed acquisition. Earlier this month, shareholders voted in favour of a resolution to approve the proposed acquisition of all the issued and outstanding shares of La Guitarra Compañia Minera S.A. de C.V from Corporacion First Majestic, S.A. de C.V., in exchange for 69,063,076 common shares of the company at a deemed price of CAD $0.65 per Consideration Share, having an aggregate value of CAD $44,890,999 (USD $35M). The ordinary resolution with respect to the transaction was approved by 99.99% of the votes cast by shareholders. The transaction has been conditionally accepted by the TSX Venture Exchange.
- Gatos Silver Inc., provided a bi-weekly default status report in accordance with National Policy 12-203 – Management Cease Trade Orders (MCTO). Pursuant to National Policy 12-203, the company must file bi-weekly status reports in the form of further news releases during the period from the Notice until the MCTO is revoked. “The company reports that since the Notice: (i) there have been no material changes regarding the information contained in the Notice that have not been disclosed in a bi-weekly default status report or in a news release referenced therein; (ii) there have been no failures by the company in fulfilling its stated intentions with respect to satisfying the provisions of the alternative information guidelines under NP 12-203; and (iii) there has not been any specified default subsequent to the defaults announced in the Notice and the news releases dated May 13, 2022, August 5, 2022 and November 11, 2022”. (Cerro Los Gatos mine, Chihuahua).
- Mammoth Resources Corp., announced the issuance of 2,206,000 common share stock options to directors, officers, and contract employees, exercisable at a price of $0.05 per common share (Tenoriba project, Chihuahua).
ON SOCIAL RESPONSIBILITY
- No relevant news.
Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.
On the picture above, ginguro texture in a banded quartz vein-breccia from an intermediate sulphidation epithermal system in a project in Zacatecas, Mexico. Photo by Miguel A Heredia.
The Mining and Exploration News in Mexico: Highlights on the First Week of December, 2022.
Drill core displaying ginguro bands
By Miguel A Heredia
During the 48th week of the year (November 28th to December 04th, 2022), at least 20 press releases were announced by companies working in Mexico, and 7 news published by the media with seven reporting resources and developments of their properties, seven commenting on Mexican issues, five disclosing deals and corporate issues, three communicating production and financial results, three announcing financing issues, one informing on exploration results, and one discussing social issues. ON MEXICO ISSUES, Altos Hornos de Mexico assured that the power outage at its plants is an act of bad faith derived from charging millions of dollars to Federal Electricity Commission (CFE) for illegal cancellation of coal supply. The Secretariat of Economy identified 159 mining companies with foreign capital operating in 26 states of Mexico (mostly juniors and exploration) in 2021. According to the Mexican Mining Chamber (CAMIMEX), Newmont, Industrias Peñoles and Fresnillo operated the main zinc mines in Mexico in 2021. Maria Luisa Albores, the Secretary of the Environment and Natural Resources (SEMARNAT) informed deputies, in a very unfortunate statement, that the federal government will not grant more authorizations for open-pit mining due to the negative impacts on the environment and human health. Grupo Mexico maintained its position as the largest copper producer in Mexico, adding a total of 1.25 B Lb Cu in 2021. Prime Mining, Aztec Minerals, GoGold, Vizsla, and Oroco reported the best drilling intercepts in Mexico on the first week of December, 2022. ON EXPLORATION, In Sonora, Aztec Minerals reported results for the last three holes from the recently completed phase 3 drill program at its Cervantes project. ON MINING, Bear Creek reported Q3, 2022 production and financial results from its Mercedes mine in Sonora. Guanajuato Silver reported Q3, 2022 production and financial results from their Mexican operations. Orogen reported Q3 operating and financial results. ON FINANCING, SilverCrest announced that it has refinanced its USD $120M secured project financing facility (Las Chispas project, Sonora). Prime Mining announced a CAD $16.5M bought deal private placement financing, the same that later on was upsized to CAD $18.3M (Los Reyes project, Sinaloa). ON RESOURCES AND DEVELOPMENT, Barksdale reported an initial Resource Estimate at Cerro Verde within its San Javier project, Sonora. GoGold presented results from its ongoing drilling program at its Los Ricos South property in Jalisco. Oroco released results from seven holes collared in the North Zone at its Santo Tomas project in Sinaloa. Prime Mining announced results from seven holes from its recently completed phase 2 drill program at its Los Reyes project, Sinaloa. SilverCrest announced the completion and final permanent connection to power line for its Las Chispas mine in Sonora. Starcore released its Mineral Resource Estimate and NI 43-101 compliant technical report for its El Creston project in Sonora. Vizsla announced results from seven drill holes targeting the southern extension of the Napoleon Vein at its Panuco project in Sinaloa. ON DEALS AND CORPORATE ISSUES, Canuc signed a comprehensive agreement with the Ejido of San Javier, located in the Municipality of San Javier, Sonora. First Majestic announced the proposed sale of its royalty portfolio to Metalla Royalty for a total consideration of USD $20M. Kootenay announced the appointment of Dale Brittliffe as its new VP Exploration (Columba project, Chihuahua). Riverside received USD $2.5M in cash and 2% royalty from Fresnillo plc for the sale of the Tajitos project, Sonora. ON SOCIAL RESPONSIBILITY, Ricardo Sierra Oteiza, spokesman for the mining company Esperanza Silver de Mexico, stated that gold and silver mining is an activity that has the capacity to accelerate economic processes at the local level, generating employment, encouraging local supply networks, contributing tax revenue to the treasury and contributing to the social and economic development of the communities hosting mining projects, among other benefits.
ON MEXICO ISSUE
- Altos Hornos de Mexico S.A.B. de C.V. (AHMSA), assured that the power outage at its plants is an act of bad faith derived from charging millions of dollars to Federal Electricity Commission (CFE) for illegal cancellation of coal supply. AHMSA is owned by Mexican businessman Alonso Ancira, who assured that CFE’s actions are unjustifiable because they represented the loss of 4,000 direct jobs and more than 8,000 indirect ones, in addition to having generated disorder in the general coal industry. “These aggressive actions began after the Judiciary accepted a claim for damages for USD $700M for the unilateral and illegal cancellation of the supply of coal for the two generating plants located in Nava, Coahuila,” accused the company. “AHMSA stated that the actions taken by the management of the CFE show that it does not care about harming Coahuila and the people of Coahuila, since our plants located in that entity represent a direct source of livelihood for 17,000 Coahuila families.
- Karen Flores, General Director of the Mining Chamber of Mexico (CAMIMEX), declared that the Federal Government stops additionally collecting up to MXP $25 B after the suspension of mining concessions and the paralysis of new permits. She explained that the policy of President Andres Manuel Lopez Obrador has halted more than 800 mining projects that only await federal authorization to start operations. “If the projects that are stopped were to start up, we would be talking about MXP $20 to 25 B per year to the federal treasury,” she said. She maintained that only in terms of taxes, the industry entered the public coffers in 2021 more than MXP $60 B and in seven years, MXP $240 B, an amount that could be higher if there were no obstacles in the current legislation.
- The Secretariat of Economy identified 159 mining companies with foreign capital operating in 26 states of Mexico (mostly juniors and exploration) in 2021. These companies operate 1,209 projects, of which 822 were halted and nine operations reported closing at the end of last year. The mining GDP in Mexico was MXP $865.2 B in 2021, a growth of 1.6% year-on-year, in real terms (based on GDP calculated in constant MXP $ with purchasing power as of December 31, 2013). For their part, mining-metallurgical exports amounted to USD $23,579M in 2021, a figure that meant an increase of 28.1% compared to the previous year. The significant increase in exports allowed that, despite the increase that was also reported in imports, an increase in the positive balance of the mining-metallurgical trade balance of 29.6% was registered and reached a value of USD $11,904M. The positive results in foreign trade in minerals consolidated the mining-metallurgical industry as the fifth source of foreign exchange, surpassing tourism and the agricultural sector, and only behind the automotive industry, the electrical and electronic equipment and machinery industry, remittances and oil exports. The mining sector presented an increase in the contribution to the National GDP, going from 2.3% in 2020 to 2.5% in 2021, and in the Industrial GDP the record went from 8.3% to 8.6% in the study period, according to data from the Mining Chamber of Mexico. Gold remained the main product of the national mining-metallurgical industry in 2021, with a share of 28.4% in the total value of production, followed by copper with 27.7% and silver with 20.4%.
- According to the Mexican Mining Chamber (CAMIMEX), Newmont, Industrias Peñoles and Fresnillo operated the main zinc mines in Mexico in 2021. Peñasquito, owned by Newmont and located in the state of Zacatecas, leads the ranking, with 245.84K tonnes Zn, then follow two mines of Industrias Peñoles: Velardeña, Durango with 909.68K tonnes Zn, and Tizapa State of Mexico with 40.13K tonnes Zn. The table below shows the Zn production by mine for the year 2021:
The Buenavista Zinc project, in Sonora, is located within the Buenavista facilities and includes the development of a new concentrator to produce approximately 100K tonnes Zn and 20K tonnes Cu per year.
While the project has all the necessary permits, the project budget is USD $413M and is expected to start operations in 2023. As of December 31, 2021, Grupo México had invested USD $217M in this project. When completed, Grupo México anticipates that this new facility will double the company’s zinc production capacity and provide 490 direct and 1,470 indirect jobs. Other notable companies are: Gatos Silver, Minera Frisco and Gold Resource.
- Maria Luisa Albores, the Secretary of the Environment and Natural Resources (SEMARNAT) informed deputies, in a very unfortunate statement, that the federal government will not grant more authorizations for open-pit mining due to the negative impacts on the environment and human health. When appearing before the joint commissions for the Environment and Natural Resources, and Climate Change and Sustainability of the Chamber of Deputies, the federal official also announced that mining concessions were detected in 68 Protected Natural Areas, “which contravenes the conservation and protection of the territory and its natural resources”. Opposition legislators such as the PAN members questioned the programs of this administration such as “Sembrando Vida”, pointing out that they do not have operating rules that allow their transparency and the energy transition has been aborted, in addition, environmental deforestation is not punished.
- Grupo Mexico maintained its position as the largest copper producer in Mexico, adding a total of 559.83K tonnes Cu in 2021. The company maintains copper production operations in Sonora, Chihuahua, San Luis Potosí and Zacatecas. With this, the company registered a coverage of 76.3% of the national copper production in 2021. The table below shows the Cu production by mine during 2021:
Prime Mining Corp., Aztec Minerals Corp., GoGold Resources Inc., Vizsla Silver Corp., and Oroco Resources Corp., reported the best drilling intercepts in Mexico on the first week of December, 2022. Details are shown in the table below:
ON EXPLORATION
- Aztec Minerals Corp., reported results for the last three holes from the recently completed phase 3 drill program at its Cervantes project in Sonora. The most significant drill intercept was encountered in hole CAL22-031, which was collared in the California Zone with 0.87 g/t Au over 28.5m, plus 0.58 g/t Au over 85.5m, including 2.3 g/t Au over 12m. “This drill hole confirms the footwall of the main California Zone mineralization at depth and fills a large gap in the drilling pattern”.
ON MINING
- Bear Creek Mining Corporation reported Q3, 2022 production and financial results from its Mercedes mine in Sonora. The company mined 126,420 tonnes of 2.92 g/t Au and processed 148,211 tonnes of 2.45 g/t Au with a metallurgical recovery of 95.53% to produce 11,170 Oz Au. Bear Creek sold 14,445 Oz Au at a cash and all-in-sustaining cost per Oz Au sold of USD $995 and USD $1,364 respectively at a realized price of USD $1,729 per Oz Au. The company reported revenues of USD $26.54M from the sale of gold and silver; a net loss of USD $7.7M; cash and cash equivalents and short-term investments as September 30, 2022 for USD $9.6M. Bear Creek plans to mine approximately 600K tonnes of 3.7 g/t Au to produce between 60K and 73K Oz Au in 2023.
- Guanajuato Silver Company Ltd., reported consolidated Q3, 2022 production and financial results from their Mexican operations (El Cubo and San Ignacio mines in Guanajuato, and Topia mine in Durango). The company mined 107,379 tonnes and milled 107,009 tonnes to produce 329.3K Oz Ag, 3,226 Oz Au, 537.6K Lb Pb, and 677.1 Lb Zn (700.3K Oz AgEq) at cash and all-in-sustaining cost of USD $13.86 and USD $19.53 per Oz AgEq respectively. It sold 311.7K Oz Ag, 2,997 Oz Au, 504.4K Lb Pb, and 273.3K Lb Zn (628.3K Oz AgEq). Guanajuato Silver reported revenue of USD $8.87M; cost of sales of USD $12.2M; mine operating loss of USD $3.34M; net loss of USD $8.4M; and cash on hand of USD $6.36M.
- Orogen Royalties Inc., reported Q3 operating and financial results. The company reported a net gain from operations of CAD $123.4K or CAD $0.001 per share; revenue of CAD $1.16M from the Ermitaño royalty with 478 attributable Oz AuEq sold at average price of USD $1,728 per Oz Au; net income of CAD $203K from prospect generation activities and recognized an impairment of CAD $262.1K for projects that have been dropped during the period; general and administrative expenses of CAD $802.1K and a loss of CAD $468K on fair value adjustments of marketable securities due to capital markets volatility. It also reported cash flow from operating activities of CAD $188.5K; cash flow from operating activities excluding changes in non-cash working capital of CAD $10.7M including CAD $3.3M in cash and cash equivalents, and CAD $5.2M in short term investments and no long-term debt.
ON FINANCING
- SilverCrest Metal Inc., announced that it has refinanced its USD $120M secured project financing facility, of which only USD $90M was drawn with a new USD $120M senior secured credit facility through a syndicate of lenders comprised of The Bank of Nova Scotia and Bank of Montreal (Las Chispas project, Sonora).
- Prime Mining Corp., announced a CAD $16.5M bought deal private placement financing consisting of 11M units at a price of CAD $1.5 per unit, the same that later on was upsized to CAD $18.3M for the sale of 12.2M units at a price of CAD $1.5 per unit. Gross proceeds will be used to develop and explore its Los Reyes project in Sinaloa and for general corporate purposes.
ON RESOURCES AND DEVELOPMENT
- Barksdale Resources Corporation reported an initial Mineral Resource Estimate (MRE) at Cerro Verde within its San Javier project, Sonora. The Resource is pit-constrained and considered a base case of USD $4/Lb copper. The table below shows the MRE effective as of October 31, 2022:

Cerro Verde remains open for expansion in most directions and the Mesa Grande and La Trinidad prospects both have historic drilling that indicates the presence of copper mineralization. Barksdale plans to initiate a Preliminary Economic Assessment (PEA) at Cerro Verde that envisions a low-strip copper heap operation to produce cathode copper on site.
- GoGold Resources Inc., presented results from its ongoing drilling program at its Los Ricos South property in Jalisco. Highlights of the drilling include hole LRGG-22-218 with 3.98 g/t Au and 529 g/t Ag (11.04 g/t AuEq or 828 g/t AgEq) over 15m, including 12.43 g/t Au and 1,626 g/t Ag (34.1 g/t AuEq or 2,558 g/t AgEq) over 4.8m, including 20.32 g/t Au and 2,774 g/t Ag (57.31 g/t AuEq or 4,298 g/t AgEq) over 2.8m, including 37.90 g/t Au and 4,250 g/t Ag (94.57 g/t AuEq or 7,093 g/t AgEq) over 0.9m. Drilling results continue to confirm high grade wide intercepts in the Main deposit on Los Ricos South property.
- Oroco Resource Corp., released results from seven holes collared in the North Zone at its Santo Tomas project in Sinaloa. Highlights of the drilling include hole NO32 with 0.34% Cu, 0.005% Mo, 0.021 g/t Au, and 2 g/t Ag (0.37% CuEq) over 88.7m; hole NO34 with 0.34% Cu, 0.011% Mo, 0.029 g/t Au, and 3 g/t Ag (0.40% CuEq) over 267m; hole NO35 with 0.37% Cu, 0.006% Mo, 0.042 g/t Au, and 2 g/t Ag (0.42% CuEq) over 220.5m; and hole NO36 with 0.43% Cu, 0.002% Mo, 0.092 g/t Au, and 2 g/t Ag (0.51% CuEq) over 139.6m. “The company has now completed 43 drill holes (28,119 m of drilling) in its 2021-2022 North Zone drilling confirming good grade mineralization along 1,700 m of strike, demonstrating a westward dipping panel with consistent grades down-dip to about 400-500 m depth below the ridge, bottoming about sea level. The program is nearing completion with the remainder of the program focused on expanding the shallow seated mineralized zone on the hanging wall along the south-west side of the Gradeshell with the continued goal of increasing the resource in this newly identified zone”.
- Prime Mining Corp., announced results from seven holes from its recently completed phase 2 drill program at its Los Reyes project, Sinaloa. Highlights of the drilling include hole 22GE-118 with 3 g/t Au and 215 g/t Ag over a true width (TW)of 5.5m, including 6.8 g/t Au and 469 g/t Ag over a TW of 1m, plus 6.8 g/t Au and 166 g/t Ag over a TW of 18.3m, including 11.6 g/t Au and 262 g/t Ag over a TW of 9.1m, plus 4.8 g/t Au and 144 g/t Ag over a TW of 2.8m, plus 2.9 g/t Au and 89 g/t Ag over a TW of 7.2m, including 9.9 g/t Au and 231 g/t Ag over a TW of 1.4m, including 2.9 g/t Au and 101 g/t Ag over a TW of 7.2m, including 7 g/t Au and 327 g/t Ag over a TW of 1.4m, plus 2 g/t Au and 72 g/t Ag over a TW of 7.4m, including 2.8 g/t Au and 90 g/t Ag over a TW of 4.4m: hole 22GE-121 with 12.8 g/t Au and 646 g/t Ag over a TW of 1.1m, plus 4.2 g/t Au and 212 g/t Ag over a TW of 12.7m, including 10.2 g/t Au and 547 g/t Ag over a TW of 0.5m, plus 10.9 g/t Au and 765 g/t Ag over a TW of 0.4m, plus 21 g/t Au and 413 g/t Ag over a TW of 0.3m; hole 22GE-122 with 2.2 g/t Au and 54 g/t Ag over a TW of 13.8m, including 9.1 g/t Au and 141 g/t Ag over a TW of 1.1m, plus 8.8 g/t Au and 289 g/t Ag over a TW of 5.6m, including 33.2 g/t Au and 1,072 g/t Ag over a TW of 1.4m; and hole 22GE-120 with 6.8 g/t Au and 207 g/t Ag over a TW of 6.8m, including 12.2 g/t Au and 337 g/t Ag over a TW of 1.5m, plus 23 g/t Au and 495 g/t Ag over a TW of 0.9m, plus 3.5 g/t Au and 75 g/t Ag over 6.7m, including 11.3 g/t Au and 245 g/t Ag over a TW of 0.8m, plus 9.9 g/t Au and 149 g/t Ag over a TW of 0.8m.
- SilverCrest Metals Inc., announced the completion and final permanent connection of its 33 kilovolt electrical power line for its Las Chispas mine in Sonora. The company also released its inaugural Task Force for Climate Related Financial Disclosure (TCFD) report and a corresponding Water Stewardship report based on conclusions from the TCFD report.
- Starcore International Mines Ltd., released its pit-constraint Mineral Resource Estimate and NI 43-101 compliant technical report for its El Creston project in Sonora. Measured resources as of September 30, 2022 are 56.3M tonnes of 0.076% Mo and 0.04% Cu for a total of 94.3M Lb Mo and 49.7M Lb Cu and Indicated resources of 142.2M tonnes of 0.067% Mo and 0.08% Cu for a total of 210M Lb Mo and 250.8M Lb Cu. Measured + Indicated resources are 198.5M tonnes of 0.069% Mo and 0.07% Cu for a total of 304.4M Lb Mo and 300.5M Lb Cu.
- Vizsla Silver Corp., announced results from seven drill holes targeting the southern extension of the Napoleon Vein at its Panuco project in Sinaloa. Highlights of the drilling include hole NP-22-320 with 279 g/t Au, 24.01 g/t Au, 1.8% Pb, and 7.6% Zn (2,305 g/t AgEq) over a TW of 1.55m, including 267 g/t Ag, 29.1 g/t Au, 1.3% Pb, and 7.2% Zn (2,631 g/t AgEq) over a TW of 1.18m, plus 113 g/t Ag, 0.69 g/t Au, 0.6% Pb, and 6.2% Zn (390 g/t AgEq) over a TW of 0.8m, plus 143 g/t Ag, 0.87 g/t Au, 0.6% Pb, and 3.7% Zn (344 g/t AgEq) over a TW of 0.45m; hole NP-22-329 with 886 g/t Ag, 7.44 g/t Au, 2.2% Pb, and 6.8% Zn (1,660 g/t AgEq) over a TW of 0.88m, plus 222 g/t Ag, 2.64 g/t Au, 0.3% Pb, and 1.2% Zn (446 g/t AgEq) over a TW of 6.70m, including 668 g/t Ag, 2.22 g/t Au, 0.5% Pb, and 2.3% Zn (875 g/t AgEq) over a TW of 0.78m, including 159 g/t Ag, 9.14 g/t Au, 0.1% Pb, and 0.2% Zn (815 g/t AgEq) over a TW of 0.78m; and hole NP-22-333 with 54 g/t Ag, 1.22 g/t Au, 0.3% Pb, and 1.6% Zn (203 g/t AgEq) over a TW of 2.1m, plus 378 g/t Ag, 2.53 g/t Au, 0.4% Pb, and 4.3% Zn (696 g/t AgEq) over a TW of 1.50m.
ON DEALS AND CORPORATE ISSUES
- Canuc Resources Corporation signed a comprehensive agreement for a period of 10 years with rights for renewal for a further 10 year period thereafter, with the Ejido of San Javier, located in the Municipality of San Javier, Sonora. The Agreement covers the Company’s 27 currently held claims and is contemplated to cover any further claims the Company may acquire in the San Javier area. The Ejido leadership at San Javier requested assistance from Canuc to implement controls against disruptive artisanal mining activities taking place locally by artisanal miners who have come to San Javier, but who are not from the area.
- First Majestic Silver Corp., announced the proposed sale of its royalty portfolio to Metalla Royalty & Streaming Ltd for a total consideration of USD $20M in common shares of Metalla. Total consideration consists of 4,168,056 Metalla shares at a deemed price of USD $4.7984 per share based on a 25-day volume-weighted average price on the NYSE American Exchange having an aggregate value of approximately USD $20.0M. The consideration will be paid upon Closing of the Transaction.
- Kootenay Silver Inc., announced the appointment of Dale Brittliffe as its new VP Exploration (Columba project, Chihuahua).
- Riverside Resources Inc., received USD $2.5M in cash and 2% NSR royalty from Fresnillo plc for the sale of the Tajitos project in Sonora. Fresnillo will have, for a four-year term, the option to buy back half of the 2.0% NSR for a payment of USD $1.5M. If enacted, then Fresnillo would have an additional three years to buy back the remaining 1% NSR for another USD $1.5M. If Fresnillo does not exercise its first buy back option during the first four-year term, the Royalty will no longer be subject to any buy back provisions. The NSR covers the entire Riverside land package and a full NSR Agreement has been agreed upon and included in the signed contract between the companies. If Fresnillo wishes to reduce mineral claims, then the Company has the first right to retain those mineral tenures before they are dropped.
ON SOCIAL RESPONSIBILITY
- Ricardo Sierra Oteiza, spokesman for the mining company Esperanza Silver de México, stated that gold and silver mining is an activity that has the capacity to accelerate economic processes at the local level, generating employment, encouraging local supply networks, contributing tax revenue to the treasury and contributing to the social and economic development of the communities hosting mining projects, among other benefits. In the case of the state of Morelos, in the community of San Agustín Tetlama in the municipality of Temixco, the company Esperanza Silver de México carries out scientific and technical prospecting and exploration studies to prepare the Environmental Impact Statement in search of the due authorizations from the federal government, so that, where appropriate, start the construction phase. If this mining project is consolidated, the Morelos community of San Agustín Tetlama would be expected to become a pole of economic and social development that joins the economic reactivation actions promoted by the government of the state of Morelos and the federal government.
Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.
On the picture above, drill core displaying ginguro texture in a banded quartz vein from an intermediate sulphidation epithermal vein system in a project in Zacatecas, Mexico. Photo by Miguel A Heredia.
The Mining and Exploration News in Mexico: Highlights on the Third Week of October, 2022.
Cockade texture
By Miguel A Heredia
During the 42nd week of the year (October 17th to October 23th, 2022), at least 15 press releases were announced by companies working in Mexico, and 4 news published by the media with six communicating production and financial issues, four reporting resources and developments of their properties, four commenting on Mexican issues, two announcing financing issues, one discussing social issues, one discussing deals and corporate issues, and one informing on exploration results. ON MEXICO ISSUES, Hermosillo, the capital city of the Sonora State, hosted the 14th International Mining Congress in October 18-21, 2022 with the participation of over 5,000 people. The Mexican Mining Chamber (CAMIMEX) warned that thefts of output and goods like explosives in the mining industry continue to increase despite the support provided by the Secretary of National Defense (SEDENA). According to data from the Ministry of Economy, the Mining Chamber of Mexico (Camimex) and experts, there is a mining collapse in Mexico since 822 mining projects were postponed, 180 foreign capital firms have left the country and there are 25 concessions stopped. GoGold and GR Silver reported the best drilling intercepts in Mexico on the third week of October, 2022. ON EXPLORATION, In Sinaloa, Prismo provided an update on its ongoing drill program conducted at its Palos Verdes project located in the historic Panuco-Copala mining district. ON MINING, Avino, Santacruz, Golden Minerals, American Gold and Silver, and First Majestic reported Q3, 2022 production results from their Mexican mining operations, while Guanajuato Silver announced that it has recommenced mining at its Valenciana Mines Complex in Guanajuato, and provided a 6-month production estimate. ON FINANCING, Sierra Metals announced that it has commenced a process to evaluate and consider the company´s current financial and liquidity position, operational challenges and possible financing and restructuring alternatives that may be available to the company. Barksdale closed the final tranche of its previously announced non-brokered private placement for gross proceeds of $264K, and completed an extension of financial instruments (San Javier project in Sonora). ON RESOURCES AND DEVELOPMENT, Avino announced that the installation and commissioning of the dry-stack tailings at its Avino mine in Durango has been completed. GoGold reported the acquisition of the 1,107 Ha Eagle concession covering the northern strike of the Main Deposit on the Los Ricos South property in Jalisco. Equinox released an updated feasibility study (FS) for its Los Filos mine expansion located in Guerrero State. GR Silver presented drilling results and announced the extension of the SE Area Silver Discovery at its Plomosas deposit in Sinaloa. ON DEALS AND CORPORATE ISSUES, Avinois conducting community agreements in the nearby towns adjacent to its la Preciosa property in Durango as it is committed to moving this project forward as part of the company´s 5-year growth strategy. ON SOCIAL RESPONSIBILITY, Industrias Peñoles and Fresnillo plc mining companies reiterated their commitment in saving and energy efficiency to continue implementing actions that contribute to the fight against global warming in order to build the mining of the 21st century.
ON MEXICO ISSUES
- Hermosillo, the capital city of the Sonora State, hosted the 14th International Mining Congress during October 18-21, 2022, with the participation of over 5,000 people.
- The Mexican Mining Chamber (CAMIMEX) warned that thefts of output and goods like explosives in the mining industry continue to increase despite the support provided by the Secretary of National Defense (SEDENA). The General Director of CAMIMEX, Karen Flores, said that thefts remain a recurrent issue in the sector and highlighted that these crimes are probably perpetrated by organized crime.
- According to data from the Ministry of Economy, the Mining Chamber of Mexico (Camimex) and experts, there is a mining collapse in Mexico since 822 mining projects were postponed, 180 foreign capital firms have left the country and there are 25 concessions stopped. If the policy were to change, 30% more jobs would be created and the contribution to Mexico’s GDP would increase by 0.5%, according to estimates. Mining and metallurgical activity exceeded tourism by 19% in foreign exchange generation. The president of the Association of Mining Engineers, Metallurgists and Geologists of Mexico (AIMMGM), indicated that the uncertainty generated by this administration in the sector has caused a slowdown, which has left investments far from the more than USD $8 billion that were reached in previous years. GoGold Resources Inc., and GR Silver Mining Ltd., reported the best drilling intercepts in Mexico on the third week of October, 2022. Details are shown in the table below:
ON EXPLORATION
- Prismo Metals Inc., provided an update on its ongoing drill program conducted at its Palos Verdes project located in the historic Panuco-Copala mining district in the state of Sinaloa. A total of 1,203m in 4 holes have been drilled to date out of a planned minimum of 2,000m. Drilling has intersected wide structural zones at depth where the Palos Verdes vein is branching into several strands measuring from about 0.5m to 9m in width in andesitic rocks. Core sampling is being completed on the entire structural zone including wall rock with veinlets. Assay results are expected to arrive in early November, 2022.
ON MINING
- Avino Silver & Gold Mines Ltd., reported Q3, 2022 production results from its Avino mine in Durango. The company milled 162.1K tonnes of 59 g/t Ag, 0.31 g/t Au, and 0.66% Cu with metallurgical recoveries of 92%, 74%, and 89% respectively to produce 285.4K Oz Ag, 1.2K Oz Au and 2.1M Lb Cu (778K Oz AgEq).
- Santacruz Silver Mining Ltd., announced Q3, 2022 production results from its Zimapan mine in Hidalgo. It milled 215,765 tonnes of 79 g/t Ag, 2% Zn, 0.7% Pb, and 0.39% Cu to produce 368.6K Oz Ag, 6.8M Lb Zn, 2.6M Lb Pb, and 1.4M Lb Cu (988.6K Oz AgEq).
- Guanajuato Silver Company Ltd., has recommenced mining at its Valenciana Mines Complex (VMC) in Guanajuato. Cut & fill mining of high-grade epithermal veins at Valenciana is currently focused on the Los Pozos mine area where several mineralized blocks had been previously defined. Mineralized material from Valenciana is currently being transported to El Cubo for processing. The company expects to mine 5,000 tonnes per month at Valenciana throughout the remainder of 2022. “The Cata processing facility is centrally located within the Valenciana Mines Complex and has a production capacity of 36,000 tonnes per month. In November 2021 Cata was placed on care & maintenance by its previous owner. Guanajuato Silver had initially anticipated restarting the Cata mill in 2023, but with the rapid recommencement of mining at San Ignacio and the VMC, the company now expects to restart mineral processing at Cata before the end of 2022. The company also provided a 6-month production estimate. Guanajuato Silver expects to mine 125K-140K tonnes in Q4, 2022 to produce over 760K-985K and over 140K-160K tonnes in Q1, 2023 to produce over 910K-1.15M Oz AgEq.
- Golden Minerals Company announced Q3, 2022 production and financial results from its Rodeo mine in Durango. The company mined 192,545 tonnes and reported that 23,618 tonnes were placed in stockpiles awaiting processing and 121,202 tonnes were placed in low grade stockpiles. Golden processed 47,947 tonnes of 2.6 g/t Au and 10 g/t Ag with metallurgical recoveries of 74.6% and 77.6% respectively., to produce 2,972 payable Oz Au in Dore and 11,907 payable Oz Ag in Dore (3,103 payable Oz AuEq in Dore). The company sold 3,108 Oz Au and 11,609 Oz Ag (3,145 Oz AuEq) at an average realized price before refining and selling costs of USD $1,703.10 per Oz Au and USD $18.72 per Oz Ag.
- Americas Gold and Silver Corporation reported Q3, 2022 production results from its Cosalá operations in Sinaloa. It produced 186K Oz Ag, 3.8M Lb Pb, and 9.4M Lb Zn and announced that silver production from the Cosalá operations for the full year 2022 is expected to be at the lower end of the projected range of 0.7-0.9M Oz Ag, while zinc and lead production are expected to be towards the upper end of the projected ranges of 36 to 40M Lb Zn and 13 to 15M Lb Pb.
- First Majestic Silver Corp., reported Q3, 2022 production results from their Mexican Mining operations (San Dimas in Durango, Santa Elena in Sonora, and La Encantada in Coahuila). Figures by mine are shown in the table below:
ON FINANCING
- Sierra Metals Inc., announced that it has commenced a process to evaluate and consider the company´s current financial and liquidity position, operational challenges and possible financing and restructuring alternatives that may be available to the company. “The company faces liquidity challenges as a result of the recent previously announced suspension of operations at the Yauricocha Mine in Peru, and operating losses and negative cash flows that have accumulated, primarily from the Bolivar and Cusi operations in Mexico”.
- Barksdale Resources Corp., closed the final tranche of its previously announced non-brokered private placement with Teck Resources Limited for gross proceeds of $264K. The net proceeds will be used for general corporate and working capital purposes. Barksdale also completed an extension of the maturity date of the secured convertible debentures administered by Delbrook Capital Advisors Inc. by one year until December31, 2023. The debentures have a remaining principal amount of $1.5M and all other terms of the debentures remain unchanged except for the conversion price, which has increased to $0.55 per share from $0.45 per share (San Javier project in Sonora).
ON RESOURCES AND DEVELOPMENT
- Avino Silver & Gold Mines Ltd., announced that the installation and commissioning of the dry-stack tailings at its Avino mine in Durango has been completed. The company chose dry-stack tailings for its environmental, safety and economic advantages, as well as because it reduces the need to extract water from local sources by recycling the water removed from tailings.
- GoGold Resources Inc., reported the acquisition of the 1,107 Ha Eagle concession covering the northern strike of the Main Deposit on the Los Ricos South property in Jalisco by USD $2.1M to be paid over 4 years. As a result of this acquisition, all of the concessions in Los Ricos South are now contiguous. “This offers the potential for an additional bulk tonnage target in Los Ricos South, with continuity from the Main Area and Eagle”.
- Equinox Gold Corp., released an updated feasibility study (FS) for its Los Filos mine expansion located in Guerrero State. Highlights of the FS include an after-tax NVP at 5% discount rate of USD $625M at base case of USD $1,675 per Oz Au; after-tax IRR of 26% at USD $1,675 per Oz Au; 5.4M Oz Au of Proven + Probable Mineral Reserves with grades of 0.65 g/t Au for open pit ore material and 3.94 g/t Au for underground ore material (average grade of 0.86 g/t Au); 7.9M Oz Au of Measured and Indicated Resources (exclusive of Reserves) with grades of 0.71 g/t Au for open pit ore material and 3.65 g/t Au for underground ore material (average grade of 0.75 g/t Au); 3.97M Oz life-of-mine (LOM) Au production, with 360K Oz peak average annual gold production (2025-2030), 280K Oz average annual gold production LOM (2023-2036), 1.22M Oz Au produced from the heap leach with average recovery of 55%, 2.75M Oz Au produced from the CIL plant with average recovery of 88%; 11.83M Oz LOM silver production; USD $993M after-tax LOM cumulative net cash flow; USD $981/ Oz average LOM cash cost; USD $1,081/Oz average LOM AISC; USD $318M initial capital cost to build the CIL plant and associated infrastructure; and 14.5-year mine life with extension potential from Mineral Resources conversion and exploitation success.
- GR Silver Mining Ltd., presented drilling results and announced the extension of the SE Area Silver Discovery at its Plomosas deposit in Sinaloa. Drilling highlights include hole SMS22-16 which identified a wide hydrothermal breccia and stockwork system with multiple high grade Ag intervals such as 112 g/t Ag, 0.06 g/t Au, and 0.1% Zn over 123.1m, including 289 g/t Ag, 0.05 g/t Au, and 0.1% Zn over 13.1m, including 4,680 g/t Ag, 0.57 g/t Au, 0.1% Pb, and 0.1% Zn over 0.4m, and 250 g/t Ag, 0.1 g/t Au, 0.1% Pb, and 0.3% Zn over 27.3m, including 1,351 g/t Ag, 0.3 g/t Au, 0.1% Pb, and 0.2% Zn over 0.3m, and 635 g/t Ag, 0.08 g/t Au, 0.2% Pb, and 0.3% Zn over 6.4m, including 2,203 g/t Ag, 0.17 g/t Au, 0.8% Pb, and 1.4% Zn over 0.5m, and 102 g/t Ag and 2.6 g/t Au over 1.5m; and hole SMS22-14 with 23 g/t Au and 0.06 g/t Au over 10.5m, and 118 g/t Ag, 0.02 g/t Au, and 0.1% Zn over 3.5m, including 1,790 g/t Ag, 0.03 g/t Au, 0.7% Pb, and 2.9% Zn over 0.2m, and 22 g/t Ag, 0.08 g/t Au over 10.9m. The drilling program continues at the SE Area to define the geometry and lateral extents of the mineralization. “The occurrence of Ag anomalous zones on surface along the 1.5km target contact, further SE from the SE Area, provides new targets for the company to continue drilling, aimed at expanding the footprint of mineralization and potentially for incorporation into the planned resource estimation update in Q1, 2023”.
ON DEALS AND CORPORATE ISSUES
- Avino Silver & Gold Mines Ltd is conducting community agreements in the nearby towns adjacent to its la Preciosa property in Durango as it is committed to moving this project forward as part of the company´s 5-year growth strategy.
ON SOCIAL RESPONSIBILITY
- Industrias Peñoles S.A.B. de C.V. and Fresnillo plc mining companies reiterated their commitment in saving and energy efficiency to continue implementing actions that contribute to the fight against global warming in order to build the mining of the 21st century. In accordance with their sustainable development policies, both companies have programs to reduce greenhouse gas emissions, such as those from transportation, for which they implemented a strategy to save energy and use clean sources. Peñoles and Fresnillo plc are committed to caring for the environment and seek to achieve, in the near future, the objective of zero significant environmental impacts.
Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.
On the picture above, cockade texture from a low-sulphidation epithermal Au-Ag vein system in a project in Sinaloa, Mexico. Photo by Miguel A Heredia.
The Mining and Exploration News in Mexico: Highlights on the Fourth Week of September, 2022.
By Miguel A Heredia
During the 38th week of the year (September 19th to September 25th, 2022), at least 12 press releases were announced by companies working in Mexico, and 3 news published by the media with four informing on exploration results, four reporting resources and developments of their properties, four commenting on Mexican issues, two announcing financing issues, and one discussing social issues. ON MEXICO ISSUES, Enrique Zorrilla, president of the Canadian Chamber of Commerce in Mexico stated that Canada has its eyes fixed on Mexico as an investment destination for its mining companies, mainly in exploration expenses to find new gold deposits. According to a recent report by the Ministry of Finance, Mexico values its lithium deposits in Sonora at USD $602,000M. In Mexico, only 33% of mines have access to a computer with an Internet connection to reduce accidents. On a striking difference with last week news releases, only Vizsla Silver Corp., posted drilling results in Mexico on the fourth week of September, 2022. ON EXPLORATION, In Sonora, Tocvan and its JV partner Colibri announced the next steps to be conducted at both the Pilar and the El Picacho projects. In Sinaloa, Prismo provided an update of its ongoing drilling program being conducted at its Palos Verdes project. In Durango, Regency entered into an option agreement to acquire a 100% undivided interest in the El Tablon claims. ON MINING, no relevant news. ON FINANCING, Tocvan announced that it has filed to extend the expiration date of 1,244,668 common share purchase warrants by six months (The Pilar project, Sonora). Barksdale closed a non-brokered private placement for gross proceeds of $2M and issued a total of 4,622,917 units at a price of $0.48 per Unit for gross proceeds of $2.22 (San Javier project, Sonora). ON RESOURCES AND DEVELOPMENT, Oroco announced the commencement of a Preliminary Economic Assessment (PEA) for its Santo Tomas project in Sinaloa. Galore provided an update on the exploitation activities carried out at its Duraznillo mine in Zacatecas. Golden Tag reported positive metallurgical results from the Fernandez Zone at its San Diego project, Durango. Vizsla reported results from 13 new drill holes targeting the Cruz Negra Vein located in the western portion of its Panuco project in Sinaloa. ON DEALS AND CORPORATE ISSUES, no relevant news. ON SOCIAL RESPONSIBILITY, Almaden signed new and expanded cooperation agreements with the two communities closest to its Ixtaca project, Puebla.
ON MEXICO ISSUE
- Enrique Zorrilla, president of the Canadian Chamber of Commerce in Mexico stated that Canada has its eyes fixed on Mexico as an investment destination for its mining companies, mainly in exploration expenses to find new gold deposits. He declared that 35% of the capital invested by that country goes to the mining sector.
- According to a recent report by the Ministry of Finance, Mexico values its lithium deposits in Sonora at USD $602,000M. Although Mexico does not currently produce the metal, the finance ministry estimated that Sonora’s reserves could add about 0.3% to potential GDP in the medium term. While the ultra light white metal is usually extracted from rock or brine deposits, lithium in Sonora is mostly trapped in clays, from which it has not yet been extracted on a commercial scale.
- In Mexico, only 33% of mines have access to a computer with an Internet connection to reduce accidents. Ericsson revealed that the use of tools such as telemetry, satellite geolocation, wireless sensors and remote operation help improve mining operations, because with them and with the speed of the 5G network, information can be obtained practically in real time.
- On a striking difference with last week news releases, only Vizsla Silver Corp., posted drilling results in Mexico on the fourth week of September, 2022. Details are shown in the table below:
ON EXPLORATION
- Tocvan Ventures Corp., and its JV partner Colibri Resources Corporation announced the next step to be conducted at both the Pilar and the El Picacho projects in Sonora. At the El Picacho, Tocvan plans to initiate a maiden drill program targeting the San Ramon prospect. The plan for the Pilar is to commence bulk sampling of trench material to be processed in a local heap leach facility; to complete 2,000m of infill drilling and 3,000m of step-out and exploration drilling; to proceed with the permitting and development requirements for establishing a bulk test mine on-site; and to update the technical report.
- Prismo Metals Inc., provided an update of its ongoing drilling program being conducted at its Palos Verdes project, Sinaloa. The Company has drilled approximately 560m in two core holes of a planned minimum of 2,000m drill program, with the second hole currently in progress. Both holes have intersected several vein structures. Palos Verdes project is contiguous to the Panuco silver-gold project of Vizsla Silver Corp.
- Regency Silver Corp., entered into an option agreement to acquire a 100% undivided interest in the El Tablon claims located only 26km from the historical Tayoltita mining district in the state of Durango. The property covers a total of 7,200 hectares and contains numerous artisanal workings and tunnels, which explored many of the veins and veinlets that exist within the concession area. In order to exercise the option, Regency Silver must pay USD $50K on receipt of exchange acceptance, issue a total of 1M common shares and pay back taxes and mining filings on or before March 31, 2024. Regency Silver must also pay a USD $1M bonus upon a NI 43-101 resource being published, which estimates the El Tablon Claims contain a minimum of 70M Oz AgEq or M Oz Au in the measured or indicated categories.
ON MINING
- No relevant news.
ON FINANCING
- Tocvan Ventures Corp., announced that it has filed to extend the expiration date of 1,244,668 common share purchase warrants by six months. The Warrants are exercisable into common shares of the Company at a price of $0.75 per common share. The Warrants were issued pursuant to a non-brokered private placement of 1,244,668 units at a price of $0.60 on March 30, 2021. The Warrants were set to expire September 30, 2022 and will have an amended expiry date of March 31, 2023. All other terms and conditions of the Warrants, including the exercise price, remain the same (The Pilar project, Sonora).
- Barksdale Resources Corp., closed a non-brokered private placement for gross proceeds of $2M and issued a total of 4,622,917 units at a price of $0.48 per Unit for gross proceeds of $2,219,000. The net proceeds from the offering will be used to advance the company’s mineral projects and for general corporate and working capital purposes (San Javier project, Sonora).
ON RESOURCES AND DEVELOPMENT
- Oroco Resource Corp., announced the commencement of a Preliminary Economic Assessment (PEA) for the North and South Zones of its Santo Tomas project in Sinaloa. Additionally, the company mobilized two rigs more to the project, bringing to six the total number of drills conducting infill and step-out drilling in the North Zone and South Zone.
- Galore Resources Inc., provided an update on the exploitation activities carried out at its Duraznillo mine in Zacatecas. “Immediately following the execution of the Exploitation Agreement with Oztoc Metals Corporation and the successful removal of the former tenant, Oztoc’s team has been evaluating and remediating the Duraznillo mine site. After conducting several processing trials, Oztoc determined that in order to achieve better production levels, a new and much improved processing system needed to be installed. Oztoc has purchased this equipment and is awaiting its arrival to begin operations, which should take place within the next two to three months”.
- Golden Tag Resources Ltd., reported positive metallurgical results from the Fernandez Zone at its San Diego project, Durango. According to the metallurgical results, the endoskarn mineralization found at the Fernandez Zone is amenable to conventional flotation techniques; 76% of the Ag and 84% of the Pb were recovered to a bulk concentrate containing 51% Pb, 4700 g/t Ag, 3.11% Zn, 5.27% Cu, and 2.23 g/t Au; Cu and Au recoveries within the bulk concentrate had significant improvements over previous test work; and 84% of the zinc was recovered to a concentrate grading 47% zinc.
- Vizsla Silver Corp., reported results from 13 new drill holes targeting the Cruz Negra Vein located in the western portion of its Panuco project in Sinaloa. Drilling highlights include hole NP-22-274 with 413 g/t Ag, 1.99 g/t Au, 0.2% Pb, and 0.3% Zn (541 g/t AgEq) over a true width (TW) of 2.09m, including 2,490 g/t Ag, 2.85 g/t Au, 0.6% Pb, and 0.9% Zn (3,287 g/t AgEq) over a TW of 0.26m, plus 258 g/t Ag, 1.54 g/t Au, 0.01% Pb, and 0.2% Zn (357 g/t AgEq) over a TW of 0.88m; hole NP-22-262 with 289 g/t Ag, 2.38 g/t Au, 0.8% Pb, and 0.7% Zn (486 g/t AgEq) over a TW of 0.65m, including 741 g/t Ag, 5.88 g/t Au, 0.3% Pb, and 1.3% Zn (1,165 g/t AgEq) over a TW of 0.20m, plus 168 g/t Ag, 16.42 g/t Au, 0.9% Pb, and 3.3% Zn (1,476 g/t AgEq) over a TW of 0.65m, including 181 g/t Ag, 19.70 g/t Au, 1.1% Pb, and 3.8% Zn (1,748 g/t AgEq) over a TW of 0.46m; hole NP-22-290 with 76 g/t Ag, 2.6 g/t Au, 0.6% Pb, and 6.2% Zn (491 g/t AgEq) over a TW of 2.85m; hole NP-22-293 with 481 g/t Ag, 1.2 g/t Au, 0.02% Pb, and 0.02% Zn (535 g/t AgEq) over a TW of 0.76m; and hole NP-22-298 with 297 g/t Ag, 1.78 g/t Au, 0.3% Pb, and 1.2% Zn (456 g/t AgEq) over a TW of 1.60m. Vizsla also reported that it acquired a new claim that connect the northwest and southeast extents of Cruz Negra which are situated on pre-existing Vizsla claims and represent approximately 400m of new potentially mineralized vein strike to explore.
ON DEALS AND CORPORATE ISSUES
- No relevant news.
ON SOCIAL RESPONSIBILITY
- Almaden Minerals Ltd., signed new and expanded cooperation agreements with the communities of Zacatepec and Santa Maria Zotoltepec, the two communities closest to its Ixtaca project, Puebla. “These agreements set out the terms of the Company’s continued support of local communities’ human right to water through the immediate improvement of local water infrastructure, and establish a basis for longer term cooperation, once the Ixtaca project is permitted. In Zacatepec, the Company has reaffirmed its agreement with the “Irrigation Group of Small Producers from Zacatepec A.C.” to construct an agricultural water reservoir and related pumping and drip irrigation system to support local farming. In Santa María Zotoltepec, the Company has signed an agreement with the “United Ejidatarios for the Sustainable Development of Santa María Zotoltepec, A.C.” in which the Company will make an immediate contribution in order to support the construction of a similar agricultural reservoir and pumping and drip irrigation system with similar characteristics to the one built at Zacatepec, and ongoing contributions to support an agro-technological package aimed at sustainable plant nutrition and soil enrichment”.
Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.
On the picture above, a grossular garnet exo skarn in a prospect in Tamaulipas, Mexico. Photo by Miguel A Heredia.
The Mining and Exploration News in Mexico: Highlights on the Fourth Week of August, 2022.
Quartz vein displaying boiling texture.
By Miguel A Heredia
During the 34th week of the year (August 22nd to August 28th, 2022), at least 16 press releases were announced by companies working in Mexico, and 7 news published by the media with seven commenting on Mexican issues, four communicating production and financial results, four disclosing deals and corporate issues, three reporting resources and developments of their properties, three announcing financial issues, and two informing on exploration results. ON MEXICO ISSUES, Colibri and Oroco reported the best drilling intercepts in Mexico on the fourth week of August, 2022. The government of Mexico announced, through a decree in the Official Gazette of the Federation, the creation of the state company Litio para Mexico (LitioMx). According to the Mining Chamber of Mexico (CAMIMEX), a total of 822 mining projects remain on hold and represent an amount of USD $959M. Jaime Gutierrez Núñez, president of CAMIMEX stated that small-scale coal mining is like “the blood diamonds” of Africa. Mexico’s mining industry plans to invest USD $5.5B in 2022, 15.2% more than in 2021. Mining in Mexico grew by 7.1% in 2021 despite friction with the government. The governor of Durango, José Rosas Aispuro, considered unfair that the mining-metallurgical sector is one of the economic sectors with the highest tax burden in the country. In Mexico there are more than 1,209 mining projects that have been developed in 26 states of the Republic. ON EXPLORATION, In Sonora, Colibri reported results from the second half of its Phase 1 drill program completed on its Evelyn project, and Tocvan announced latest drill results from its Pilar project. ON MINING, Guanajuato Silver, Discovery Silver, Minera Alamos, and Orogen reported Q2, 2022 production and financial results from their Mexican operations. ON FINANCING, Canasil announced a non-brokered private placement for gross proceeds of up to $550K (Nora project, Durango). Minera Alamos arranged a USD $3M working capital facility and announced a closed a USD $4.35M equity raise (Cerro de Oro project, Zacatecas). Eric Sprott announced holdings in Orex Minerals Inc. ON RESOURCES AND DEVELOPMENT, Discovery Silver reported Q2, 2022 results from its flagship Cordero project, Chihuahua. Minera Alamos provided an update on its Cerro de Oro project, Zacatecas. Oroco successfully tested the western side of the North Zone at its Santo Tomas project in Sinaloa. ON DEALS AND CORPORATE ISSUES, Monumental announced that its common shares are now trading on the OTCQB Venture Market under the symbol MNMRF (Jemi project, Coahuila). Argonaut announced the appointment of its Vice President, Canadian Operations (La Colorada mine, Sonora). Aztec purchased 35% interest in the Cervantes property in Sonora from Kootenay. Colibri announced reinstatement of trading on the TSX Venture Exchange and the appointment of its CFO. ON SOCIAL RESPONSIBILITY, no relevant news.
ON MEXICO ISSUE
- Colibri Resource Corporation and Oroco Resource Corp., reported the best drilling intercepts in Mexico on the fourth week of August, 2022. Details are shown in the table below:

· According to the Mining Chamber of Mexico (CAMIMEX), a total of 822 mining projects remain on hold and represent an amount of USD $959M, which are still waiting for better conditions to be able to reactivate. Jaime Núñez, president of CAMIMEX stated that is essential to encourage exploration since unfortunately in the last seven years we have seen a decrease in investments in exploration, leaving several projects on standby.
· Jaime Gutierrez Núñez, president of CAMIMEX stated that small-scale coal mining is like “the blood diamonds” of Africa, and that the Federal Electricity Commission (CFE) should certify where the mineral it buys comes from and its conditions.
· Mexico’s mining industry plans to invest USD $5.5B in 2022, 15.2% more than in 2021, but according to the Mexican Mining Chamber (CAMIMEX), it will remain below the record figure of USD $8.04B seen in 2012 amid difficult conditions. Growing security problems, a high tax burden and the government’s decision to stop granting concessions for projects have prevented investments in the sector from increasing faster, said CAMIMEX head Jaime Gutiérrez.
· Mining in Mexico grew by 7.1% in 2021 despite friction with the government. According to CAMIMEX’s annual report, this increase positioned it as the only productive activity that recovered and even exceeded the fall of 2020, when the covid-19 pandemic initially stopped its operations because the government did not consider it “essential activity”. Even without tax incentives, the mining sector presented an increase in its contribution to the gross domestic product (GDP) going from 2.3% in 2020 to 2.5% in 2021, and an annual advance in the proportion of industrial GDP from 8.3% to 8.6% in the same period.
· The Governor of Durango, José Rosas Aispuro, considered unfair that the mining-metallurgical sector is one of the economic sectors with the highest tax burden in the country, even though it is an enabler that prevents the migration of people in the communities where it develops its production processes, for job creation and social benefits. Mining Entrepreneurs stated that mining generates jobs and is one of the industries that pays the most taxes, since in 7 years it has contributed more than MXP $240,000M (approximately USD $12B) in taxes and other rights.
· In Mexico there are more than 1,209 mining projects that have been developed in 26 states of the Republic, in which 406,179 jobs have been generated and a production value that already exceeds MXP $334,782M (approximately USD $16.7B). Among the main minerals extracted from these deposits are gold, copper, silver, zinc, iron, molybdenum, lead, fluorite, among others. For its exploration and exploitation, in 2021 alone, investments have been made for more than USD $4,810M and more than USD $5,538M are expected by the end of 2022. Of the 1,209 mining projects that exist in Mexico, 286 are in Sonora, Chihuahua has 160 and Durango has 128, which positions them as the entities with the greatest economic benefit thanks to mining concessions. Of the total number of projects, 749 correspond to precious metals; 180 to polymetallic minerals, 167 to copper, 71 to iron ore and the remaining 42 to other metals and minerals. According to the Mexican Mining Chamber (CAMIMEX), there are currently a total of 263 projects in the exploration stage, 76 in production, 39 in the development stage, while 822 projects are being postponed and 9 operations are reported as closed. However, the agency assures that, since the start of the current administration, the federal government has stopped granting permits or concessions for the exploration and development of new projects, since so far more than USD $959.7M dollars have not been invested. .
ON EXPLORATION
· Colibri Resource Corporation reported results from the second half of its Phase 1 drill program completed on its Evelyn project, Sonora, and included 3,101m of RC drilling completed in 22 holes. In total, Phase 1 consisted of 6,223m of RC drilling in 42 holes. Highlights include hole EVE22-042 with 0.17 g/t Au over 86m, including 0.32 g/t Au over 22m; hole EVE 22-043 with 0.92 g/t Au over 3m; hole EVE22-046 with 1.94 g/t Au over 2m, including 3.36 g/t Au over 1m; hole EVE22-044 with 0.63 g/t Au over 6m; hole EVE22-036 with 1.3 g/t Au over 1m; hole EVE22-033 with 1.92 g/t Au over 1m; hole EVE22-030 with 0.13 g/t Au over 87m, including 0.34 g/t Au over 8m; hole EVE22-029 with 1.39 g/t Au over 5m; and hole EVE22-028 with 0.13 g/t Au over 19m. In addition to drilling, Colibri is completing the geological mapping as well as conducting soil sampling to infill the historical property wide soil surveys.
· Tocvan Ventures Corp., informed that seven holes were completed at its Pilar project in Sonora, totalling 1,382m and released results from the three first drill holes where the most significant drill intercepts was encountered in hole JES-22-67 with 0.4 g/t Au over 30.5m, including 7.6 g/t Au over 1.5m. Results are pending for the remaining four holes.
ON MINING
· Guanajuato Silver Company Ltd., reported Q2, 2022 production and financial results from their El Cubo and Pinguico mines in Guanajuato (all amounts in American dollars). The company milled 94,212 tonnes to produce 155, 912 Oz Ag and 2,161 Oz Au (or 337,760 Oz AgEq) wit metallurgical recoveries of 80.91% and 82.52% respectively, at cash and all included sustaining cost (AISC) of $16.98 and $24-06 per Oz AgEq respectively. Guanajuato Silver reported revenue of $6.13M; cost of sales of $7.8M; mine operating loss of ($1.66M); net loss of ($3.5M); EBIDTA of ($1.1M); and working capital of ($2.04M). The company sold 159,840 Oz Ag, and 2,195 Oz Au (or 342, 987 Oz AgEq) at realized prices of $22.56 and $1,873 per Oz respectively.
· Discovery Silver Corp., reported Q2, 2022 financial results (all amounts in Canadian dollars). The company reported cash and cash equivalents of $63.6M; total assets of $101.8M; total current liabilities of $2.54M; working capital of $62.5M; and total shareholder´s equity of $99.2M.
· Minera Alamos Inc., reported Q2, 2022 production and financial results from its Santana mine in Sonora (all amounts in Canadian dollars). The company reported that monthly mine production rates were approximately 300K tonnes, but with the opening of the Nicho Main Zone during Q2, the company is now in the position to ramp up production levels. Alamos sold 3,128 Oz Au and reported revenues of $7.3M; cost of goods sold of $3.26M; direct cost of production of $16 per Oz; income from operations of $2.6M; net income of $2.7M; cash and cash equivalents (including marketable securities) of $9M; and working capital of $17M.
· Orogen Royalties Inc., announced Q2, 2022 financial results (all amounts in Canadian dollars). The company reported revenue of $959.8K comprised from the Ermitaño royalty and $17.5K generated from prospect generation activities; project generation cost of $433.5K and recovered $448.9K in expense reimbursement from partners on optioned projects; general and administrative expenses of $875.2K; loss of $754.8K; net loss from operations of $648.6K; cash and cash equivalents from operating activities of $131.3K; cash from operating activities excluding changes in cash-cash working capital of $257.9K ; and working capital of $10.5M including $3.05M in cash and cash equivalents and $5.13M in short term investments and no long-term debt.
ON FINANCING
· Canasil Resources Inc., announced a non-brokered private placement for gross proceeds of up to $550K. Gross proceeds will be used to fund the company´s exploration programs (Nora project, Durango).
· Minera Alamos Inc., arranged a USD $3M working capital facility and announced a closed a USD $4.35M equity raise of common shares at $0.55/share. The combination of both enhancing the company´s working capital position as development work extends to the advancement of the Cerro de Oro project in Zacatecas.
· Eric Sprott announced that 18,333,333 common share purchase warrants of Orex Minerals Inc., expired unexercised representing a decrease in holdings of approximately 7.2% of the outstanding common shares on a partially diluted basis since the date of the last early warning report. As a result of the warrants expiry, Mr. Sprott now beneficially owns and controls 36,666,666 shares representing approximately 19.6% of the outstanding shares on a noun-diluted basis.
ON RESOURCES AND DEVELOPMENT
· Discovery Silver Corp., reported Q2, 2022 results from its flagship Cordero project, Chihuahua. The company reported that initial results from the Preliminary Feasibility Study (PFS) metallurgical work had recoveries of 90-95% for Ag, Pb, and Zn. It also reported that Phase 2 drilling program intercepted excellent grades below the Preliminary Economic Assessment (PEA) pit including hole C21-564 with 95 g/t Ag, 0.21 g/t Au, 1.9% Pb, and 4.5% Zn (337 g/t AgEq) over 33.9m, and hole C21-560 with 234 g/t Ag, 0.15 g/t Au, 3.8% Pb, and 6.5% Zn (606 g/t AgEq) over 18.1m, as well as hole C22-610 collared outside the current resource with 115 g/t Ag, 0.05 g/t Ag, 3.7% Pb, and 4.1% Zn (388 g/t AgEq) over 32.6m, including 187 g/t Ag, 0.05 g/t Au, 6.5% Pb, and 7.2% Zn (660 g/t AgEq) over 17.8m.
· Minera Alamos Inc., provided an update on its Cerro de Oro project, Zacatecas. The company informed the sign off of the documentation for its Cerro de Oro project surface rights agreement in Zacatecas, allowing the company to move forward with the permitting process for the construction of its second gold operation in Mexico. Minera Alamos also informed that the NI 43-101 compliant Preliminary Economic Assessment (PEA) is nearly to be completed and is expected to get it done by next month.
· Oroco Resource Corp., successfully tested the western side of the North Zone at its Santo Tomas project in Sinaloa by drilling 3,050m. Drilling has confirmed and expanded the 2009 Grade shell model of Cu > 0.30% derived from the historical drilling described in the Company’s 2019 Technical Report. A total of 26 holes (18,136 m of drilling) have now been completed in the North Zone, spanning 1,100m of strike length, with intersections of good grade mineralization returned in all holes for which the Company has received assays. Highlights of the last holes collared at the western side of the North Zone include hole N015 with 0.31% Cu, 0.009% Mo, 0.025 g/t Au, and 2 g/t Ag (0.36% CuEq) over 292m; hole N016 with 0.32 g/t Cu, 0.006% Mo, 0.032 g/t Au, and 2 g/t Ag (0.73% CuEq) over 95.4m, plus 0.39% Cu, 0.016%Mo, 0.022 g/t Au, and 4 g/t Ag (0.46% CuEq) over 44.7m, plus 0.26% Cu, 0.010% Mo, 0.014 g/t Au, and 2 g/t Ag (0.31% CuEq) over 88.7m; hole N017 with 0.31% Cu, 0.011% Mo, 0.02 g/t Au, and 2 g/t Ag (0.73% CuEq) over 63.8m, plus 0.22% Cu, 0.01% Mo, 0.02 g/t Au, and 1 g/t Ag (0.28% CuEq) over 159.2m; and hole N018 with 0.36% Cu, 0.011% Mo, 0.017 g/t Au, and 3 g/t Ag (0.42% CuEq) over 21m, plus 0.65% Cu, 0.012% Mo, 0.019 g/t Au, and 3 g/t Ag (0.68% CuEq) over 10m, plus 0.33% Cu, 0.012% Mo, 0.017 g/t Au, and 2 g/t Ag (0.38% CuEq) over 42.3m. The Company will commence a drill program targeted at testing the South Zone in 2022.
ON DEALS AND CORPORATE ISSUES
· Monumental Minerals Corp., announced that its common shares are now trading on the OTCQB Venture Market under the symbol MNMRF (Jemi project, Coahuila).
· Argonaut Gold Inc., announced the appointment of its Vice President, Canadian Operations, effective August 29, 2022 (La Colorada mine, Sonora).
· Aztec Minerals Corp., purchased indirectly from Kootenay Silver Inc., 35% interest in the Cervantes property in Sonora by issue 10M common shares at a price of CAD $0.25 per Aztec share for aggregate consideration of CAD $2.5M. Kootenay will retain a 0.5% Net Smelter Returned Royalty. Following the closing of the Transaction, Kootenay owns a total of 10.68M Aztec shares, which represents approximately 11.85% of the issued and outstanding Aztec shares on an undiluted basis.
· Colibri Resource Corporation announced reinstatement of trading of its common shares on the TSX Venture Exchange. The shares will re-open for trading on the Exchange at the opening of trading on Monday, August 29. The company also announced the appointment of its new CFO (Evelyn project, Sonora).
ON SOCIAL RESPONSIBILITY
· No relevant news.
Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.
On the picture above, boiling texture in a low-intermediate epithermal vein system in a project in Durango, Mexico. Photo by Miguel A Heredia.
















