Ethos Gold Corp. Announces Option to Acquire La Purisma Property

Ethos_011217

VANCOUVER, British Columbia, Dec. 01, 2017 (GLOBE NEWSWIRE) — Ethos Gold Corp. (“Ethos” or the “Company”) (TSXV:ECC) is pleased to announce that it has, through its Mexican subsidiary Compañía Minera Roca Dorada, S.A. de C.V. (“Roca Dorada”) entered into an option agreement for (the “Option Agreement”) with Coztic Recursos Minerales, S. de R.L. de C.V. (the “Property Owner”) to earn a 100% right, title and interest in and to the mineral concessions comprising the “La Purisima” mineral property situated in the municipality of Buenaventura, Chihuahua, México (the “Property”), subject to the Property Owner being entitled to a 2.0% net smelter return royalty upon the Company earning 100% interest in the Property on the terms set out in the Option Agreement.

SilverCrest Continues to Intercept High-Grade Mineralization at Las Chispas Property, Extensions to Las Chispas and Giovanni Veins

SilverCrest_20171128

Vancouver, British Columbia–(Newsfile Corp. – November 28, 2017) – SilverCrest Metals Inc. (TSXV: SIL) (OTCQX: SVCMF) (“SilverCrest” or the “Company”) is pleased to release additional surface and underground drill results from its ongoing Phase II Exploration Program at the Las Chispas Property (the “Property”) located in Sonora, Mexico. The surface and underground drill program is designed to define readily accessible high-grade areas in the historic underground workings in the Las Chispas Vein and further define the Giovanni Vein. The Company is currently exploring nine of the 19 known epithermal veins on the Property with efforts focused on four of these veins to be incorporated into SilverCrest’s maiden resource estimate anticipated in Q1 2018.

Phase 1 at Cerro Cascaron Complete; Drill Targeting Underway

Azure271117 HarvestGold_271117

Vancouver, British Columbia / TheNewswire / November 27, 2017 – Harvest Gold Corporation (TSX.V:HVG) (“HarvestGold” or the “Company“) and Evrim Resources Corp. (“Evrim”) (TSX.V:EVM) are pleased to announce the completion of the phase one exploration program at the high-grade Cerro Cascaron gold-silver project in Mexico. The combined Evrim/Harvest geological teams have begun the work to define drill targets and will meet in Vancouver next week to finalize and prioritize these targets.

Highlights on the Fourth Week of November, 2017. Mineral Exploration in Mexico

During the 47th week of the year (November 20th to November 26th, 2017), at least 32 press releases were announced by companies working in Mexico. ON MEXICO ISSUES: No relevant news. ON EXPLORATION: six companies informed on exploration efforts during the week: In Sonora Azure Minerals reported favorable metallurgical results from its Oposura project. In Chihuahua Monarca is to acquire the San Jose project; Mammoth Resources mobilized equipment to drill its Tenoriba property. In Sinaloa Starcore is to acquire the Santa Fe project, with an historical Au-Ag resource. Silver Bull released drill results from the sulfide zone at Sierra Mojada; Prize Mining is to acquire the Manto Negro stratabound copper project. Evrim Resources announced the acquisition of the Cuale high sulfidation property. In Veracruz Mexican Gold announced step-out drilling mineralization intercepts at Las Minas. ON MINING: Impact Silver presented its quarterly report. Marlin Gold informed on the mining program at La Trinidad in Sinaloa.  In Zacatecas, operations recommenced at the Santacruz Silver’s Veta Grande mill after the PROFEPA suspension. MX Gold informed on advance at the Magistral tailings project in Durango. Americas Silver informed the San Rafael mine is sourcing all ore treated in Cosalá. ON FINANCING: Telson Resources received $1 M from the exercise of warrants. Aztec Minerals is now trading on the USA. Primero Mining obtained an extension on its revolving credit facility. ON RESOURCES AND DEVELOPMENT: Leagold Mining reported more high-grade results from drilling at Bermejal Underground on its Los Filos property in Guerrero. Stroud Resources announced an updated resource estimate for its Santo Domingo Hostotipaquillo deposit in Jalisco. Almaden Resources released more drill results from the Ixtaca deposit in Puebla.  ON DEALS AND CORPORATE ISSUES: Soleil Capital and Goldplay Exploration are to amalgamate to create a precious metals exploration company focused in Mexico. Monarca Minerals signed a LOI to acquire the San Jose property in Chihuahua. Starcore entered into a LOI to acquire the Santa Fe property in Sinaloa. Camrova Minerals (Baja Mining) has seen its interest on El Boleo property (in Baja California) reduced to 7.3%. Bacanora Minerals is involved in a lawsuit over a 3% royalty on its Sonora lithium project. Golden Goliath has received the fifth payment on the option of its Uruachic properties. Prize mining is to acquire the Manto Negro project in Coahuila from Scion Mines.

ON MEXICO ISSUES

  • No Relevant News.

ON EXPLORATION

  • Azure Minerals Ltd. reported metallurgical results from its Oposura project in Sonora. The test returned over 70% and 80% recoveries respectively for Pb and Zn, producing a lead concentrate (>55% Pb, 360 g/t Ag) and a zinc concentrate (>55% Zn) with low levels of deleterious elements. More metallurgical studies will be undertaken on core material from the present drill campaign.
  • Monarca Minerals Inc. entered into a letter of intent (LOI) to acquire the San Jose property in Chihuahua. The 5,580 hectares project shows disseminations, stockwork and veins of skarn, gossan and altered intrusive rocks, with assays of up to 26.8 g/t Au, 161 g/t Ag, 6.5% Pb, 0.9% Zn, 4.2% Cu.
  • Starcore International Mines Ltd. entered into a letter of intent (LOI) with Eduardo de la Peña Gaitan and other owners, to acquire the 21,000 hectare Santa Fe project in Sinaloa. Previous exploration included 13,000 m of drilling in 2013, establishing an historical (Non 43-101 compliant) open pit resource of 285 K AuEq Oz in 5 M tonnes @ 89 g/t Ag, 0.56 g/t Au; or an underground resource of 225 K AuEq Oz in 1.28 M tonnes @ 266 g/t Ag, 1.83 g/t Au.
  • Mammoth Resources Corp. has mobilized a drill rig and a bulldozer to its Tenoriba property in Chihuahua. The company is to begin a 3,000 m drill program in 8 to 24 holes to test gold-silver targets on a 5 km strike length within a 15 square Km area of ubiquitous high sulfidation gold mineralization. The company announced the release of a technical report on the drill selection criteria.
  • Silver Bull Resources Inc. released results from four drill holes testing the sulfide zone below the previously defined oxide zone on its Sierra Mojada project in Coahuila. Highlighted results comprise 9 m @ 20.7% Zn, 1.0% Pb, 98 g/t Ag, 0.26% Cu, including 3.65 m @ 47.8% Zn, 2.5% Pb, 105 g/t Ag, 0.26% Cu; 3 m @ 537 g/t Ag, 3.9% Zn, 1.1% Cu, including 1 m @ 1,280 g/t Ag, 14.8% Zn, 2.3% Cu.
  • Prize Mining Corp. entered into an agreement (see the appropriate section below) to acquire the Manto Negro copper project in Coahuila. The project consists of seven mining concession covering 17,959 hectares. “The Project is identified as a stratabound Cu-Ag (+/- Pb-Zn) oxidized “Red Bed type” copper deposit… The Project area is hosted by Cretaceous carbonates and sandstones with exposures of mineralization being identified in numerous locations occurring in concordant layers ranging from 2 to 23 metres thick that are referred to as “Mantos”. Exposures of this mineralization have been identified over the 50-kilometre length of the Project.” The grades of historical sampling, trenching and drilling range from 0.73% to 5.55% Cu, 19 to 793 g/t Ag, 1.5 to 15% Pb and 0.3 to 3.64% Zn.
  • Mexican Gold Corp. announced that drilling to expand the high-grade dike contact mineralization previously encountered at its Las Minas project in Veracruz has successfully intersected long intervals of chalcopyrite-magnetite mineralization in five additional holes. Core length intervals include: 0 m; Cumulative 48.0 m; 20.3 m; cumulative 28.0 m, 28.0 m of chalcopyrite-magnetite mineralization.
  • Evrim Resources Corp. announced the acquisition and early exploration results of the 97 square kilometer Cuale gold project in Jalisco. The Cuale project was initially staked under the Callinan Royalties generative alliance (now owned by Altius Minerals Corp.) with formal title granted to Evrim for 100% ownership in November 2017. “Mineralization is found in moderately to strongly silicified rhyolite that contains up to 10% specular hematite in boxworks, interpreted to have formed after pyrite. Zones of pervasive silicification with strong clay alteration of phenocrysts trending to vuggy silica are observed..” Seven rock chip samples collected on a 500 m by 250 m zone returned from 0.19 to 4.56 g/t Au.

ON MINING

  • Impact Silver Corp. released its financial and production third quarter 2017 report. Production at the Guadalupe mill came primarily from the San Ramon Deeps, Cuchara and San Patricio mines. Highly variable ore from the San Ramon Deeps mine contributed to the lower grade mill feed @ 175 g/t Ag. Total silver production was 229.9 K Oz. Exploration work is focused on the Alacran, Alacran North, San Ramon North and El Paso vein. The company had a $6.0 M cash position at the end of the period.
  • Marlin Gold Mining Ltd. informed that most of the mining during the year at La Trinidad, in Sinaloa, focused on expanding and deepening the north side of the Taunus pit, while waste removal continues on the southern part of the pit. Up to the end of October, 35,500 Oz Au have been shipped. Drilling commenced at the Colinas target, 1.2 km south of the pit.
  • Santacruz Silver Mining Ltd. recommenced operations at its Veta Grande mill in Zacatecas, following the authorization by PROFEPA and SEMARNAT (Environmental agencies in Mexico).
  • MX Gold Corp. informed all major tankage at the Magistral tailings project in Durango has been installed, with the grinding mill scheduled for completion in Early December 2017, and the installation of the Merrul-Crowe circuit underway.
  • Americas Silver Corp. informed production from the San Rafael mine at the company’s Cosalá operations in Sinaloa is now the sole source of mill feed. The mine is currently producing over 1,000 tonnes per day (tpd) of the targeted 1,500 tpd, with a stockpile of over 25 k tonnes from San Rafael and further 50 K tonnes of ore from Nuestra Señora.

ON FINANCING

  • Telson Resources Inc. reported that all the warrants issued as part of a private placement on November 2015 have been exercised, resulting in CAD$1 M in proceeds (Tahuehueto, Durango; Campo Morado, Guerrero).
  • Aztec Minerals Corp. has been approved to commence trading in the USA as of Nov 20th 2017, on the OTCQB under the symbol AZZTF (Cervantes, Sonora).
  • Primero Mining Corp. has agreed in principle with its lenders to an extension to its revolving credit facility and guarantee provided by Wheaton Precious Metals Corp., previously maturing on November 23, 2017. The facility has been extended to December 1, 2017, providing the company to continue negotiations on its strategic review process and the possible divestiture of its San Dimas mine in Durango.

ON RESOURCES AND DEVELOPMENT

  • Leagold Mining Corp. reported additional high-grade results from the Bermejal Underground drill program at the Los Filos mine in Guerrero. “Bermejal Underground is at the northern end of a large intrusive body which has a total circumference of at least 15 kilometres…” The area being drilled extends 1,600 m along the strike of the intrusive contact and has a vertical depth extent of over 800 m. The drilling shows consistent oxide mineralization at carbonate/intrusive contacts either along the intrusive contact or below the intersection between the sill and the Bermejal intrusive contact. An updated resource estimate is expected before year end.

Leagold Bermejal Underground drilling1

  • Stroud Resources Ltd. updated the resource estimate in a new technical report on its Santo Domingo Hostotipaquillo project in Jalisco. The reports confirms the presence of 6.1 M tonnes @ 0.47 g/t Au, 101 g/t Ag and 3.48 M tones @ 0.39 g/t Au which contain 91.6 K Oz Au, 19 M Oz Ag as measured and indicated resources and 43.2 K Oz Au, 10 M Oz Ag as inferred resources. La Raya vein has a mineralized zone 35 m wide over 700 m along strike and 300 m of depth; and the Guadalupe vein is typically 15 to 30 m wide. Five additional veins have been identified for further exploration.
  • Almaden Minerals Ltd. released drill results from its ongoing exploration and development program for the feasibility study (FS) of the Ixtaca deposit at its Tuligtic project in Puebla. Two holes confirmed the discovery of an ore zone within a portion of the pit considered waste in the prefeasibility study (PFS). The holes intersected 23 m @ 0.45 g/t Au; 38.6 m @ 7.92 g/t Au, 15 g/t Ag (including 1 m @ 237 g/t Au, 232 g/t Ag); 20.4 m @ 0.89 g/t Au, 12 g/t Ag (including 7.0 m @ 2.07 g/t Au, 20 g/t Ag).

ON DEALS AND CORPORATE ISSUES

  • Soleil Capital Corp. entered into an amalgamation agreement with Goldplay Exploration Ltd. on a business combination transaction. “The purpose of the Proposed Transaction is the creation of a public, TSX Venture Exchange-listed, Mexico-focused, precious metals exploration company utilizing Goldplay’s mineral exploration strategy and experience related to the Rosario District..” in Sinaloa. Upon completion of the transaction the resulting issuer will be named Goldplay Exploration Ltd. and will be listed as a Tier 2 Mining Issuer on the Exchange.
  • Monarca Minerals Inc. entered into a letter of intent (LOI) to acquire the San Jose property in Chihuahua. The 5,580 hectares project shows disseminations, stockwork and veins of skarn, gossan and altered intrusive rocks. The terms of the LOI include a US$20 K payment on execution of the LOI (paid), US$20 K on execution of the definitive agreement, US$50 K on the first anniversary, and US100 K on the second anniversary, with the owners retaining a 2% NSR, of which one percent can be purchased by Monarca for US$100 k. Back taxes on the property of US$390 K will be paid over a period of time. Concession taxes per year are approximately US$46 K.
  • Starcore International Mines Ltd. entered into a letter of intent (LOI) with Eduardo de la Peña Gaitan and other owners, to acquire the 21,000 hectare Santa Fe project in Sinaloa. Starcore has up to 120 days to conduct due diligence work, and 30 days to complete the acquisition. Starcore is to issue 5 M shares to the owners upon signing, and will be released on four installments, and pay US$6 M as follows: US$2 M on execution; US$1 M on 18 months; US$1 M on 36 months; US$1 M on 48 months; US$1 M on 60 months.
  • Camrova Resources Inc. (Baja Mining Corp.) informed that its interest in Minera y Metalurgica del Boleo S.A. P.I, de C.V. has been reduced from 10% to 7.3%. This is a result of Korea Resource Corporation funding Camrova’s pro rata ($42.9 M) on cash calls amounting $429 M. The Boleo project is to annually produce 30 K tonnes Cu, 700 tonnes Co, 10,500 K tonnes Zn sulfate (Boleo, Baja California).
  • Bacanora Minerals Ltd. announced that it filed a statement of claim seeking to void ab initio, a 3% gross over-riding royalty held by the Estate of Colin Orr-Ewing over certain of Bacanora assets in Sonora. The company also announced amendments to the employment arrangements of certain members of the executive management firm.
  • Bacanora Minerals Ltd. has been served by the estate of the late Ian Colin Orr-Ewing with legal proceedings filed on September 20th September 2017, on a dispute regarding the ownership of 3% gross overriding royalties over Bacanora’s Sonora Lithium project and Magdalena Borates project. The Estate currently owns 8.15% of the common shares of Bacanora.
  • Golden Goliath Resources Ltd. has now received the fifth in a series of seven optional payments from Fresnillo PLC for the properties optioned to them in the Uruachic mining district in Chihuahua. This $100 K payment is to be followed by another $100 k due on May 2018 and a final US$2.3 M payment on November 2018, if Fresnillo is to keep the property. Golden Goliath plans to use the final payment to pay for the drill program on its 100% owned San Timoteo property in Chihuahua.
  • Prize Mining Corp. entered into an agreement with Scion Mines S.A. de C.V. to acquire 100% interest in the Manto Negro copper project in Coahuila, by issuing 6 M shares with a restricted lock-up and restricted resale period. Six million shares more are to be issued if the next milestones are met on a 43-101 technical report: 2 M bonus shares if the estimated copper resource is over 500 M Lb; 2 M bonus shares if the estimated copper resource is over 750 M Lb; 2 M bonus shares if the estimated copper resource is over 1 B Lb.

Content like what you have just read can be seen at https://gambusinoprospector.com/ and at LinkedIn’s Mexico Mineral Exploration Group.

On the picture below, magnetite-chalcopyrite mineralization on drill core from Las Minas, Veracruz. Photo by Mexican Gold Corp. on its Nov 23rd, 2017 press release.

Core from Las Minas, Veracruz, photo from press release in Nov 2017

Evrim Acquires Cuale Gold Project in Mexico – Defines new zone in an oxidized high sulphidation gold system

2017-11-23_NR_EVM

VANCOUVER, British Columbia, Nov. 23, 2017 (GLOBE NEWSWIRE) — Evrim Resources Corp. (TSX-V:EVM) (“Evrim” or the “Company”) is pleased to announce the acquisition and initial exploration results of the Cuale gold property, an early-stage exploration property prospective for high sulphidation epithermal gold-silver in Jalisco, Mexico.  The Cuale project was initially staked under the Callinan Royalties Generative Alliance (now owned by Altius Minerals Corporation (TSX:ALS)) with formal title granted to Evrim for 100% ownership in November 2017.

Mammoth Resources Announces Mobilization of Diamond Drill Equipment to Tenoriba Gold-Silver Project, Chihuahua, Mexico in Preparation for Drilling

Mammoth Resources_nov222017

TORONTO, Nov. 22, 2017 (GLOBE NEWSWIRE) — Mammoth Resources Corp. (TSX-V:MTH), (the “Company”) is pleased to announce that all drill equipment and a D6 Caterpillar bulldozer have beenmobilized to its Tenoriba, High Sulphidation gold-silver exploration project in the Sierra Madre region of southwestern Chihuahua State, Mexico. Equipment has arrived by truck in preparation to commence the Company’s previously announced (refer to press release dated October 25, 2017) 8 to 24 hole, up to 3,000 metre diamond drill program to test various high priority gold-silver targets along a 5 km strike length within an approximate 15 square kilometre area of ubiquitous gold mineralization at Tenoriba. The Caterpillar bulldozer will be finalizing previously advanced access to diamond drill stations that were unable to be completed earlier this year. Drilling is expected to begin in the next 7 to 10 days once the diamond drill contractor has completed all preparation work (drill water supply lines, other supplies to drill stations) to enable commencement and continuation of drilling.

Soleil Capital Corp. Proceeding with QT – Enters into Amalgamation Agreement with Goldplay Exploration

http://markets.businessinsider.com/news/stocks/Soleil-Capital-Corp-Proceeding-with-QT-Enters-into-Amalgamation-Agreement-with-Goldplay-Exploration-480087

CALGARYNov. 20, 2017 /CNW/ – Soleil Capital Corp. (TSX.V: SOLE.P – the “Company” or “Soleil“), a capital pool company (a “CPC“), is pleased to announce that further to its press release of September 21, 2017, it has entered into an amalgamation agreement dated November 17, 2017 (the “Agreement“) with Goldplay Exploration Ltd. (“Goldplay“) in respect of an arm’s length business combination transaction (the “ProposedTransaction“).  Goldplay is a private mineral exploration company incorporated under the laws of British Columbia and active in gold exploration in the Rosario Gold District, Sinaloa, Mexico (the “Rosario District“).

The purpose of the Proposed Transaction is the creation of a public, TSX Venture Exchange-listed, Mexico-focused, precious metals exploration company utilizing Goldplay’s mineral exploration strategy and experience related to the Rosario District.  The working capital of the combined entity (the “Resulting Issuer“), upon successful closing of the Proposed Transaction will be approximately $1,507,504 (assuming completion of the minimum Concurrent Financing (as described below)) or $2,507,504(assuming completion of the maximum Concurrent Financing), sufficient to support Goldplay’s current 12 month exploration strategy, and the ongoing evaluation of new opportunities.

 

SOURCE Soleil Capital Corp.

Stroud Resources Announces 71% Increase in Measured and Indicated Resources at Santo Domingo, Mexico

http://www.marketwired.com/press-release/stroud-resources-announces-71-increase-measured-indicated-resources-santo-domingo-mexico-tsx-venture-sdr-2241367.htm

TORONTO, ONTARIO–(Marketwired – Nov. 20, 2017) – Stroud Resources Ltd. (TSX VENTURE:SDR) (“Stroud” or the “Company”) has filed an updated, independent National Instrument 43-101 (“NI 43-101”) Technical Report (the “Report”) on its Santo Domingo Project (the “Property”) located in the western silver-gold belt of the Sierra Madre Mountains of Mexico. The Property is located 90 km from Guadalajara in Jalisco Province; about 150 km south-west of First Majestic’s San Silver Mine and 150 km south-east of Endeavour Silvers’ Terronera Development Project. The Report was prepared by Derek McBride, P. Eng. using the exploration results from 16 diamond drill holes completed in 2011-2012, primarily on the La Raya and Guadalupe zones. It shows a significant increase in the measured and indicated and inferred mineral resource estimates from numbers previously reported in a 2010 Technical Report (press release of January 27, 2010).

Highlights

  • Measured and Indicated resources increased to 25.74M silver equivalent ounces from 15.05M.
  • Inferred Resources increased to 13.39M silver equivalent ounces from 10.68M.
  • La Raya vein indicates a mineralized zone, 35 metres wide by 300 metres deep and over 700 metres along strike.
  • Guadalupe vein is typically 15 to 30 metres wide.
  • Five additional veins have been identified for future exploration, deeper into the hillside.

The Report confirms measured and indicated, and inferred resources as set out in the table below:

Classification Tonnes Gold
g/t
Silver
g/t
Silver
Eq. g/t
Ounces
Gold
Ounces
Silver
Ounces
Ag Eq.
Measured 3,148,834 0.51 107.40 144.21 51,370 10,136,145 13,952,515
Indicated 2,932,967 0.43 94.07 124.93 40,242 8,874,620 11,785,663
Measured and Indicated 6,081,801 0.47 100.97 134.91 91,612 19,010,765 25,738,178
Inferred 3,482,160 0.39 119.56 43,228 10,083,932 13,387,222
Cut-off grade was 45 grams per tonne silver equivalent over a three metre true width and a gold-silver ratio of 72:1
Continuity of mineralization was established by drilling on 50 metre centres, and using a specific gravity of 2.65

 

SILVER BULL INTERSECTS 9 METERS OF SULPHIDE MINERALIZATION GRADING 20.7% ZINC, 1% LEAD AND 98G/T SILVER, INCLUDING 3.65 METERS OF MASSIVE SULPHIDE MINERALIZATION GRADING 47.8% ZINC, 2.5% LEAD AND 105 G/T SILVER ON THE SIERRA MOJADA PROJECT, COAHUILA, MEXICO

silver bull

Vancouver, British Columbia – Silver Bull Resources, Inc. (TSX: SVB, OTCQB: SVBL) (“Silver Bull”) is pleased to provide results from its continued underground drill program targeting the newly discovered Sulphide Zone, which sits under the previously defined oxide zone on the Sierra Mojada Project in Coahuila, Northern Mexico.

 

Silver Spruce Preparing Permitting for Planned Drill Program at 3 High Priority Targets at its Mexican Pino de Plata Silver Project

https://finance.yahoo.com/news/silver-spruce-preparing-permitting-planned-160600994.html

Vancouver, British Columbia–(Newsfile Corp. – November 17, 2017) – Silver Spruce Resources (TSXV: SSE) (FSE: S6Q) has restarted the permitting process for initiating the drill program at its Pino de Plata silver project. The 397-hectare project is located approximately 15 kilometres west from Coeur Mining’s Palmarejo open pit and underground silver project and approximately 12 kilometres due south of the town of Chinipas, Chihuahua State, Mexico.