AVINO PROVIDES FURTHER DRILL RESULTS FROM ITS 2021 EXPLORATION PROGRAM
Drills 32.2 metres of 151 g/t AgEq at the Brecha de Bajo Vein

Avino Silver & Gold Mines Ltd. (ASM: TSX/NYSE American, GV6: FSE, “Avino” or “the Company”) is pleased to announce continued drill results from Phase 2 of the drill campaign which was announced as part of the Company’s exploration plans for 2021.

Leave a Reply