KOOTENAY PROVIDES UPDATE ON ONGOING DRILL PROGRAM AT COPALITO SILVER-GOLD PROJECT, MEXICO

Kootenay Silver Inc. (TSXV: KTN) (the “Company” or “Kootenay”) is pleased to announce that drilling is proceeding as scheduled at the Copalito silver-gold project, located in Sinaloa State, Mexico. To date, the Company has completed 1,600 of the planned 3,500 meters (the “Program”) over 19 shallow drill holes, ranging from 50 to 160 meters in depth. As previously announced in the Company’s new release related to Columba property dated April 15, 2021, laboratory delays for assay turn around time has been longer than expected causing result announcement delays.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s