MAG SILVER ANNOUNCES FIRST PRODUCTION FROM JUANICIPIO

nr_20-15_mj_q3_production_report_final_with_qp

VANCOUVER, British Columbia, Oct. 21, 2020 (GLOBE NEWSWIRE) — MAG Silver Corp. (TSX / NYSE American: MAG) (“MAG” or “MAG Silver”) is pleased to announce that, as planned, development material from the Juanicipio Project (56% / 44% joint venture between Fresnillo plc (“Fresnillo”) and MAG) commenced processing at the Fresnillo beneficiation plant during the quarter ended September 30, 2020. As reported by the operator Fresnillo, 42,476 tonnes were processed during the quarter, with total production of 394 thousand silver ounces, 610 gold ounces, 138 tonnes of lead and 174 tonnes of zinc (attributable to MAG: 173.4 thousand ounces of silver, 268.4 ounces of gold, 60.7 tonnes of lead and 76.6 tonnes of zinc).

Leave a Reply