CZL.- PLOMOSAS PLANT UPGRADE AND REFIT

20200929-CZL

BENEFITS OF REFURBISHED PLOMOSAS PLANT
• Process plant on mine site enables:
• Reduced maintenance and supervision costs
• Direct control of supplies and services
• Reduced transport and travel costs
• Flowsheet and recoveries optimised for the Plomosas ore
• Throughput matching with stockpile adjacent to plant from mine
• Plomosas has abundant water supply so no recycled water will be used.

Leave a Reply