KOOTENAY IDENTIFIES SIGNIFICANT NEW SILVER TARGET AT LA NAVIDAD ZONE, ON LA CIGARRA SILVER PROJECT, MEXICO

http://kootenaysilver.com/news/kootenay/2017/kootenay-identifies-significant-new-silver-target-at-la-navidad-zone-on-la-cigarra-silver-project-mexico

Kootenay Silver Inc. (TSXV: KTN) (the “Company” or “Kootenay”) is pleased to announce that recent detailed sampling and ground reconnaissance work completed by Kootenay has identified a well-defined silver bearing drill target within the La Navidad Zone on its La Cigarra silver project (the “Property”) located in Chihuahua State Mexico.

Kootenay Silver President & CEO Jim McDonald states, “The geology of the newly identified silver bearing target contained within the La Navidad Zone bears striking similarities to the San Gregorio Zone to the west, which hosts a large portion of La Cigarra’s contained NI 43-101 silver resource. Recent field results have made this region of the property a top priority for future drill testing, as its location and geological features offer considerable exploration upside to the potential that already exists within the main La Cigarra mineralized system”

Alio Gold Announces Closing Of C$50.39 Million Bought Deal

http://aliogold.com/investors/news-releases/index.php?content_id=347

Vancouver, July 20, 2017 – Alio Gold Inc. (TSX:ALO, NYSE MKT:ALO) (the “Company”) is pleased to announce that it has completed the previously announced bought deal offering of Units for aggregate gross proceeds of C$50,387,500. The Offering was underwritten by a syndicate of underwriters who purchased on a bought deal basis 8,000,000 units of the Company (the “Units”) at a price of C$6.25 per Unit for aggregate proceeds of C$50,000,000. Each Unit consists of one common share (a “Common Share”) of the Company and one-half of one common share purchase warrant (each whole warrant a “Warrant”). Each Warrant will entitle the holder to acquire one common share of the Company at a price of C$8.00 at any time prior to July 20, 2018. The underwriters also exercised the over-allotment option in part and purchased an additional 62,000 Units to cover over-allotments for additional gross proceeds to the company of C$387,500.

The net proceeds of the Offering will be used by the Company to advance its Ana Paula project and for general corporate purposes.

San Marco Resources – Chunibas Drill Program Expanded After Discovery of Large Intrusive Breccia System

Click to access 2017-07-20-nr-smn-sbu5gp.pdf

Vancouver, B.C. – July 20, 2017: San Marco Resources Inc. (SMN: TSX-V) (“San Marco” or “the Company”) has increased the Chunibas HQ core drilling program from four to six holes following the discovery of an extensive, previously unknown, intrusive breccia associated with mineralization encountered during the current drill phase. Management considers this to be a very important discovery and is working on multiple fronts to ascertain how to best explore it and determine its economic significance.

Bob Willis, San Marcos CEO stated,

“It is very early days, but we don’t want to understate the potential significance of this discovery. It’s too early to classify this new discovery though it has affinities to both breccia-hosted and intrusive-hosted systems, which are host to some large gold and gold-copper discoveries worldwide made in the recent past.

Corex Gold Appoints Doug Ramshaw as President and CEO

http://www.corexgold.com/s/NewsReleases.asp?ReportID=797389

Vancouver, BC – July 19, 2017, Corex Gold Corp. (TSXV: CGE) (OTCQB: CGEKF) (“Corex” or the “Company”), is pleased to announce the appointment of Doug Ramshaw as President and CEO of the Company, effective immediately. Mr Ramshaw currently serves in the capacity of VP Corporate Development and additionally as a Director.

Mr. Ramshaw is a senior executive and corporate director with more than 20 years of experience in the mineral resource sector. His work has focused on mineral project evaluation, M&A, and business development strategies supporting corporate growth. Mr. Ramshaw previously worked as a mining analyst for an independent brokerage firm in London, U.K., and has served in various executive capacities for a number of publicly listed junior resource companies. He remains an independent Director of several companies listed on the TSX Venture Exchange.

AZURE MINERALS LTD. – QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 JUNE 2017

Click to access 43kq47v3gkdcrd.pdf

Alacrán Project

  • Teck advises planned exploration activities for Year 1 work program
  • Field work in progress

Promontorio Project

  • Project under review by third parties for possible investment

Business Development

  • Assessment of new project opportunities is continuing
  • Highest priority given to acquiring an advanced stage project
  • Azure also seeks early stage, high potential exploration projects

Cash balance at end of quarter of $9.7 million


Alacrán Project

Minera Teck S.A. de C.V., a subsidiary of Teck Resources Limited (“Teck”), is earning an initial 51% interest by spending US$10 million by Decem er 2020.

A 2% NSR is retained by Grupo Mexico S.A.B. de C.V.


During the Quarter Teck commenced its 2017 exploration work program (ASX: 22 May 2017) and its early work has identified several targets that warrant either first-pass or follow-up exploration, including drilling.

Exploration activities include geochemical, hyperspectral and geochronological studies,
geological mapping and surface sampling, geophysical surveys, prior to drill-testing the identified targets.

Teck has informed the Company that diamond drilling is expected to start later in the third quarter upon receipt of the required environmental and other drilling approvals.

Work conducted during 2017 represents the first year of activity of a total four year, US$10 million program which will entitle Teck to earn back a 51% share in the project from Azure.

Promontorio Project
Azure 100% ownership
Expressions of interest continue to be sought for the possible joint venture or sale of this project.

Business Development
During the June Quarter Azure has continued its strategy of identifying and assessing opportunities to acquire precious and base metals projects in Mexico. As a high priority, the Company has sought advanced stage projects where previous work outlined mineral resources or demonstrated, by drilling, continuous zones of mineralisation.

Azure’s technical team has evaluated numerous projects with several undergoing detailed due diligence studies. It is expected that further updates on this process will be provided in the near future.

Corporate
At the end of the June Quarter, Azure had a cash balance of approximately $9.7 million.

Almaden Drills Further New High Grade Mineralisation Within and Outside PFS Pit, Hits 8.40 Meters of 0.35 g/t Gold, 1035.0 g/t Silver and 8.50 Meters of 1.05 g/t Gold and 511.4 g/t Silver

https://www.efe.com/efe/english/news-release/almaden-drills-further-new-high-grade-mineralisation-within-and-outside-pfs-pit-hits-8-40-meters-of-0-35-g/50000339-MULTIMEDIAE_3329093

VANCOUVER, BC–(Marketwired – July 18, 2017) – Almaden Minerals Ltd. (“Almaden” or “the Company”) (TSX: AMM)(NYSE MKT: AAU) is pleased to announce new assay results from Almaden’s ongoing exploration and development program at the Company’s Tuligtic project, Mexico. Results reported today are from drill holes TU-17-494, 495, 496 and 497 drilled on sections 10+500 and 10+775 East. Holes TU-17-494, 495 and 496 intersected significant mineralisation and veining inside or immediately outside of the 2017 PFS pit north of the Main Ixtaca Zone. Hole TU-17-497 expanded the Main Ixtaca Zone to depth. Highlights from these drillholes include the following intercepts:

Hole TU-17-494  SECTION 10+775 EAST Az. 330, Dip -74
18.25 meters @ 0.69 g/t Au and 262.7 g/t Ag Ixtaca North Zone
Including 8.50 meters @ 1.05 g/t Au and 511.4 g/t Ag Ixtaca North Zone
26.00 meters @ 0.19 g/t Au and 346.1 g/t Ag Ixtaca North Zone
Including 8.40 meters @ 0.35 g/t Au and 1035.0 g/t Ag Ixtaca North Zone
Including 4.90 meters @ 0.23 g/t Au and 1704.2 g/t Ag Ixtaca North Zone
Hole TU-17-495  SECTION 10+500 EAST Az. 150, Dip -70
21.00 meters @ 1.57 g/t Au and 49.0 g/t Ag Ixtaca North Zone
Including 1.85 meters @ 10.49 g/t Au and 481.5 g/t Ag Ixtaca North Zone
11.00 meters @ 1.85 g/t Au and 106.5 g/t Ag Ixtaca North Zone
Including 2.20 meters @ 8.13 g/t Au and 498.7 g/t Ag Ixtaca North Zone
26.10 meters @ 0.80 g/t Au and 9.4 g/t Ag Ixtaca North Zone
Including 7.05 meters @ 1.73 g/t Au and 12.6 g/t Ag Ixtaca North Zone
Hole TU-17-496  SECTION 10+775 EAST Az. 330, Dip -85
23.50 meters @ 0.26 g/t Au and 65.8 g/t Ag Ixtaca North Zone
Hole TU-17-497  SECTION 10+775 EAST Az. 150, Dip -55
19.25 meters @ 1.05 g/t Au and 73.5 g/t Ag Main Ixtaca Zone
Including 4.80 meters @ 3.43 g/t Au and 232.1 g/t Ag Main Ixtaca Zone

Southern Silver Expands Surface Targets on Newly Acquired Cerro Las Minitas Claims and Updates Oro Geophysics Program; Extends Closing of Brokered Financing

http://www.southernsilverexploration.com/en/news/168/southern-silver-expands-surface-targets-on-newly-acquired-cerro-las-minitas-claims-and-updates-oro-geophysics-program-extends-closing-of-brokered-financing.php

Southern Silver Exploration Corp (TSX-V: SSV; “Southern”) reported today on its surface float sampling program for the newly acquired Biznagas and Los Lencho claims located contiguous to the larger Cerro Las Minitas property, Durango State, Mexico.

These strategic claims were acquired and are being explored for possible epithermal vein systems, similar to productive veins at the nearby Avino Gold-Silver Mine and San Sebastian Mine which are different from the Skarn/CRD type mineralization identified at Southern’s flagship project Cerro Las Minitas.

Southern’s current surface program has been encouraging in this regard and has returned multiple float samples with strongly anomalous values of gold (0.25 to 1.28g/t Au), silver (11.6 to 57.2g/t Ag), arsenic (132 to 1155ppm), antimony (383 to 777ppm Sb) and mercury (6.1 to 45.9ppm Hg). Anomalous samples occur in three main clusters containing elevated silver values along a 7 kilometre NW-SE transect through the two claims as well as several other smaller target areas that require additional follow-up exploration.

AMERICAS SILVER CORPORATION PROVIDES AN UPDATE ON THE SAN RAFAEL PROJECT 

Click to access nr20170717.pdf

TORONTO, ONTARIO – July 17, 2017 – Americas Silver Corporation (TSX: USA) (NYSE “MKT”: USAS) (“Americas Silver” or the “Company”) is pleased to provide a construction update on its 100% owned and fully funded San Rafael development project located in Sinaloa, Mexico.

Budget & Timeline

Construction commenced in early Q4, 2016 with an estimated initial capital expenditure of US $22 million based on the March 30, 2016, San Rafael pre-feasibility study. The initial capital estimate was subsequently reduced to US $18 million due to project optimization related to the mill expansion, refurbishing existing equipment and ramp development, as well as favourable movements in the Mexican peso. As at June 30, 2017, the Company has spent approximately $10.5 million of the revised budget and expects to have sufficient cash on hand and cash flow generated from continuing operations to fund the project development.

Management expects that initial processing of material at the existing Los Braceros mill will occur by mid-September. The initial targeted throughput of 1,500 tonnes per day from the pre-feasibility study is expected early in Q4, 2017. In early 2018, management will evaluate a potential mill expansion based on realized mill throughput of the San Rafael ore, achievable future mining rates and current metal prices.

San Rafael is expected to deliver average annual production of 1 million ounces of silver, 50 million pounds of zinc and 20 million pounds of lead over a 6 plus year mine life at negative all-in sustaining costs based on current reserves and metal prices. The project is expected to have an IRR of greater than 100%, generate substantial free cash flow and provide a step change in the Company’s cash cost and all-in sustaining cost profile in 2018.

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY SECOND QUARTER PRODUCTION OF 5,696 GOLD OUNCES AND 397,670 SILVER OUNCES MAINTAINING 2017 ANNUAL OUTLOOK

Click to access GRC-2017-07-17-1.pdf

COLORADO SPRINGS – July 17, 2017 – Gold Resource Corporation (NYSE MKT: GORO) (the “Company”) reports preliminary production results for the second quarter ended June 30, 2017 of approximately 5,696 ounces of gold, 397,670 ounces of silver and significant base metals. Gold Resource Corporation is a gold and silver producer, developer and explorer with operations in Oaxaca, Mexico and Nevada, USA. The Company has returned $110 million to shareholders in monthly dividends since commercial production commenced July 1, 2010, and offers shareholders the option to convert their cash dividends into physical gold and silver and take delivery.
Preliminary second quarter production at the Company’s Aguila Project totaled approximately 5,696 ounces of gold, 397,670 ounces of silver, 294 tonnes of copper, 1,207 tonnes of lead and 4,176 tonnes of zinc. Through the first half of 2017, the Company’s preliminary production numbers total approximately 12,443 ounces of gold, 825,560 ounces of silver, 514 tonnes of copper, 2,134 tonnes of lead and 6,820 tonnes of zinc.