During the 44th week of the year (November 1st to November 7th, 2021), at least 29 press releases were announced by companies working in Mexico, with nine reporting resources and developments, seven informing on exploration results, six communicating production and financial results, three announcing financial issues, three disclosing deals and corporate issues, and one discussing social issues. ON MEXICO ISSUES, no relevant news. ON EXPLORATION, In Sonora, Aztec Minerals and its JV Kootenay approved a 5,000m RC drill program at its Cervantes project, Canuc added two new mining concessions to its San Javier project, and Ranchero Gold provided an update on its Phase 1 drill program at its Santa Daniela project. In Chihuahua, Kootenay released results from three drill holes collared at its Columba project. In Durango, Silver Wolf engaged Terraquest to conduct a high resolution aeromagnetic, radiometric and matrix electro- magnetic geophysical survey on its Ana Maria property. In Zacatecas, Almadex completed a field program implemented to refine targets at its Las Lajas project. In Jalisco, Almadex reported that it has conducted IP geophysics at its San Pedro project. In Guerrero, Pantera Silver informed that it has completed all the reports and requirements needed to apply for a drill permit for its Nuevo Taxco project. ON MINING, Americas Gold and Silver announced that its Cosalá operation in Sinaloa has been re-started and all workers have been re-called. First Majestic announced Q3, 2021 production and financial results from their Mexican operations. Golden Minerals presented Q3, 2021 production and financial results from its Rodeo mine in Durango. Mexus announced revenue of $128K for the month of October from its Santa Elena mine in Sonora. Minera Alamos reported that it has made an initial delivery of gold doré from its Santana mine in Sonora. Torex reported Q3, 2021 production and financial results from its El Limon-Guajes Mine Complex in Guerrero, and provided full year 2021 production guidance. ON FINANCING, Aztec Minerals closed the first tranche of a private placement for gross proceeds of CAD $1M (Cervantes project, Sonora). One World Lithium closed a first tranche of a non-brokered private placement for gross proceeds of $765,221 (Salar del Diablo project, Baja California). Southern Empire announced its intention to undertake a non-brokered private placement for gross proceeds of up to $1M (Pedro Gold project, Durango). ON RESOURCES AND DEVELOPMENT, Altaley announced that it has hired MGA Contratista Minera at its underground mining contractor for its Tahuehueto mine in Durango. Azucar Minerals reported that a mineral chemistry porphyry vectoring study has identified a new target area for a possible central porphyry system to its the El Cobre project, Veracruz. In Baja California, Comet released results from eight drill holes collared at its Santa Teresa project. Fabled reported results from one hole collared at its Santa Maria project in Chihuahua. Mithril announced drill results from its Copalquin project in Durango. Silvertone commenced a 2,200m drilling program at its Peñasco Quemado project in Sonora. Tarachi reported positive metallurgical results from its Magistral Tailings project in Durango. Vizsla released results from its ongoing resource focused drilling program from its Panuco project in Sinaloa. GR Silver provided an update on its 2021 drilling program at its Plomosas project in Sinaloa. ON DEALS AND CORPORATE ISSUES, Candelaria Mining announced that it will commence trading on the OTCQX Best Market (Caballo Blanco project, Veracruz). Kootenay Silver and Kootenay Resources announced completion of spin-out transaction (Columba project, Chihuahua). Monumental Gold received approval from TSX to acquire from Discovery Silver the Jemi rare earth elements project in Coahuila. ON SOCIAL RESPONSIBILITY, Discovery Silver produced its first Environmental, Social and Governance (ESG) report (Cordero project, Chihuahua).
ON MEXICO ISSUE
No relevant news.
ON EXPLORATION
Aztec Minerals Corp., and its JV Kootenay Silver Inc., approved a 5,000m RC drill program, consisting of 22 holes, at its Cervantes project in Sonora. This Phase 2 drill program is expected to commence in this month and plans to test the main four targets: California, California Norte, Jasper, and Purisima East. “The primary objectives of the two phase 2021 exploration program are to better define the open pit, heap leach gold potential of the porphyry gold oxide cap at California, evaluate the potential for deeper copper-gold porphyry sulfide mineralization underlying the oxide cap, test for north and west extensions of the California mineralization at California North and Jasper, and assess the breccia potential of Purisima East”.
Canuc Resources Corporation added two new mining concessions to its San Javier project in Sonora. The new concessions acquired by staking are contiguous and cover extensions of one of the Company’s principal exploration targets.
Ranchero Gold Corp., provided an update on its 13 holes, 3,000m Phase 1 drill program, at its Santa Daniela project in Sonora. The current drill program is planned to test three low-sulphidation epithermal targets: La Colmena, La Cascada, and X-Structure. To date, only 360m have been completed in two holes.
Kootenay Silver Inc., released results from three drill holes collared at its Columba project in Chihuahua. Significant drill intercepts were encountered in holes CDH-21-110 with 269 g/t Ag, 0.3% Pb, and 0.8% Zn over 55m, including 453 g/t Ag, 0.6% Pb, and 1.4% Zn over 29.9m, including 650 g/t Ag, 0.9% Pb, and 2.3% Zn over 17.8m, and including multiple mineralized intervals varying from 100-1,915 g/t Ag, 0.1-5.4% Pb, and 0.1-9% Zn in widths from 0.3-2.5m; hole CDH-21-109 with 100 g/t Ag, 0.05% Pb, and 0.1% Zn over 31m, including 193 g/t Ag, 0.1% Pb, and 0.2% Zn over 14.56m, including 294 g/t Ag, 0.1% Pb, and 0.4% Zn over 7.11m, and including multiple mineralized intervals varying from 167-592 g/t Ag, 0.1-0.2% Pb, and 0.1-1% Zn over widths of 0.7-2.31m; and hole CDH-21-108 with 57 g/t Ag, 0.02% Pb, and 0.1% Zn over 166m, including 98 g/t Ag, 0.03% Pb, and 0.1% Zn over 77m, including 328 g/t Ag, 0.1% Pb, and 0.5% Zn over 11m, including 504 g/t Ag, 0.2% Pb, and 0.7% Zn over 5.9m, including 1,100 g/t Ag, 0.5% Pb, and 2% Zn over 1m, and including additional mineralized intervals varying from 124-331 g/t Ag, 0.1-0.2% Pb, and 0.2-0.6% Zn over widths of 0.5-1.5m.
Silver Wolf Exploration Ltd., engaged Terraquest to conduct a high resolution aeromagnetic, radiometric and matrix electro- magnetic geophysical survey on its Ana Maria property, Durango. A total of 1,800 line kilometers will be flown over the entire property which consists of 9 mining concessions encompassing 2,549 hectares.
Almadex Minerals Ltd., completed a field program implemented to refine targets at its Las Lajas project in Zacatecas, prior to a first pass diamond drill program planned for later this year. Las Lajas consists of a banded epithermal vein system and was staked by the company during a regional exploration program.
Almadex Minerals Ltd, reported that it conducted IP geophysics at its San Pedro project in Jalisco, and has identified high chargeability responses that were not tested by the past drilling efforts. A drill program is currently underway at this project. Almadex and previous operators carried out surface sampling, geophysics, and drilling at the project. Historical reports include results of 55 sample reconnaissance rock chip sampling program which returned gold values from below detection to 12.4 g/t Au (averaging 0.44 g/t Au) and 0.07 to 2,490 g/t Ag (averaging 71.0 g/t Ag), and one RC hole including 1.65 g/t Au and 19 g/t Ag over a length of 6.08m.
Pantera Silver Corp., informed that it has completed all the reports and requirements needed to apply for a drill permit for its Nuevo Taxco project. The company filed a Manifiesto de Impacto Ambiental (MIA) and an Estudio Técnico Justificativo (ETJ) with SEMARNAT. The Company is completing final preparations for drilling in anticipation of receiving a drill permit before the end of November.
ON MINING
Americas Gold and Silver Corporation announced that its Cosalá operation in Sinaloa has been re-started and all workers have been re-called. The milling rate is expected to ramp out in tandem with mine production with a goal of processing 1,800 tonnes per day. Cosalá has over 20K tonnes of ore ready to be processed and approximately 20 loads of existing concentrate were shipped in late October. “Initial production will be focused on the main Zone consisting of high-grade Zn areas fully developed before the illegal blockade to maximize near-term free cash flow”.
First Majestic Silver Corporation announced Q3, 2021 production and financial results from their Mexican operations. Figures by mine are shown in the table below: