Southern Silver Intersects 2.7 metres Averaging 599g/t Ag, 16.9% Pb and 10.2% Zn (1530g/t AgEq) at Cerro Las Minitas; Updates Progress on Oro Project

Southern Silver Exploration Corp. (TSX.V: SSV) (“Southern Silver”) reported today on further assay results from the Mina La Bocona target on the Cerro Las Minitas project, Durango, Mexico. These latest drill results are from the North Felsite chimney, an area located approximately 400 metres to the northwest of the La Bocona and Mina Pina shafts along the eastern side of the Cerro.

Leave a Reply