Monarca Minerals Reports Completion of Phase 1 Exploration Drilling at San Jose Project and Preliminary Results Including 4.07 G/t Au over 3.0m

Toronto, Ontario–(Newsfile Corp. – November 9, 2021) – Monarca Minerals, Inc. (TSXV: MMN(“Monarca” or the “Company”) is pleased to announce that it has completed its Phase 1 San Jose exploration RC drilling program with 4,640.6m completed in 15 drill holes. Assay results from 7 of these drill holes are shown below in Table 1 and indicate significant Au, Ag, Cu, Pb and Zn mineralization, with the remaining assay results still pending from the laboratory.

Leave a Reply