Tocvan Drills 47.3 meters of 0.75 g/t Au from Surface in Step-out South of the Main Zone Also Drills 7.6 meters of 1.7 g/t Au and 7 g/t Ag at New 4-Trench Extension Target

Calgary, Alberta – TheNewswire – July 8, 2021 – Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce results for the next six drill holes from its Phase II drill program (the “Program”) at the Pilar Gold-Silver Project in Sonora, Mexico. A Phase II drill program has concluded with over 3,500 meters of reverse circulation (RC) drilling in twenty (20) drill holes. Results for six drill holes are included in this release, highlighted by drill hole JES-21-47 which returned 47.3 meters at 0.75 g/t Au and 5 g/t Ag (0.80 g/t AuEq). Seven (7) drill holes from new target areas are pending assay results.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s