Prime Mining Reports Results Including 8.95 gpt Au and 74.5 gpt Ag over 4.5 Metres and 1.96 gpt Au and 63.6 gpt Ag over 18.7 Metres from Ongoing Drilling at Los Reyes

VANCOUVER, British Columbia, April 06, 2021 (GLOBE NEWSWIRE) — Prime Mining Corp. (“Prime” or the “Company”) (TSX-V: PRYM, OTCQB: PRMNF, Frankfurt: A2PRDW) is pleased to release additional positive results from its ongoing 15,000-metre Phase 1 drill program at its wholly owned Los Reyes gold-silver project in Sinaloa State, Mexico (“Los Reyes, or the “Project”). Currently, 5 diamond drills are active until the commencement of the rainy season in August 2021. The results announced today include initial core assay results from the Zapote-South, Noche Buena and San Miguel East deposits, which are three of eight known deposits that comprise the current mineral resource at Los Reyes. Thirteen drill holes are being reported on, including eight holes from Zapote-South, four from Noche Buena and one from San Miguel East.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s