Tocvan Ventures Drills 94.6 meters of 1.6 g/t Au, including 9.2 meters of 10.8 g/t Au and 38 g/t Ag in Expansion Drilling at Pilar Gold-Silver Project Sonora, Mexico.

Tocvan_090221

Calgary, Alberta – TheNewswire – February 9, 2021 – Tocvan Ventures Corp. (CSE:TOC) (CNSX:TOC.CN) (“Tocvan” or the “Corporation”) is pleased to announce results form its maiden drill program (the “Program”) at the Pilar Gold-Silver Project in Sonora, Mexico. A Phase One drill program was completed in December of 2020 totalling 1,505 meters of reverse circulation (RC) drilling in nine (9) drill holes. Results for all nine drill holes are included in this release, all drill targets were step-outs of historic drill holes within the Main Zone.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s