Gold Sales From Production at Mexus’ Santa Elena Mine To Occur By Year End; Production Targets Being Met

Mexus_08122020

CABORCA, Mexico, December 7th, 2020 (GLOBE NEWSWIRE) — Mexus Gold US (OTCQB: MXSG) (“Mexus” or the “Company) announced that the sale of gold from production at its Santa Elena mine located near Caborca, MX is expected to occur by December 31st. This sale will represent the first 15 days of production from the company’s newly completed heap leach pad. In addition, Mexus continues to blast hole drill on both vein #2 and the Julio vein at the mine site which coincides with a build out of a drill program guiding production through 2021.

Leave a Reply