Mexus.- Gold Being Produced At Mexus’ Santa Elena Mine; Production From The Recently Completed Heap Leach Pad

Mexus Gold US

CABORCA, Mexico, November 30th, 2020 (GLOBE NEWSWIRE) — Mexus Gold US (OTCQB: MXSG) (“Mexus” or the “Company) is pleased to announce that leaching has commenced on its recently completed 250,000 ton leach pad. Leaching of vein 2 mineralized material is under way and returning values of .32 to .42 gpt Au in solution. Flows are expected to reach .6 gpt Au in solution by December 16th. Future production drilling on vein 2 and the Julio quartz vein continues. Mexus CEO Paul Thomspon Sr. added that gold production by year end should reach 225 oz.
Solution returning to the pregnant pond

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s