Alio Gold Intersects 2.03 g/t au Over 48.2 Metres at Ana Paula

2018-04-04-NR-AP-2nd-Surface-Drilling-Results-FINAL

VANCOUVER, British Columbia, April 04, 2018 (GLOBE NEWSWIRE) — Alio Gold Inc (TSX:ALO) (NYSE AMERICAN:ALO) (“Alio Gold” or the “Company”), is pleased to provide the results of the second and third drill hole from its surface drill program at its 100% owned Ana Paula project in Guerrero, Mexico. The 3,800 metre surface diamond drill program was initiated in January 2018 and consists of six drill holes of 600 to 700 metres each targeting the complex breccia extension below the proposed open-pit.

Leave a Reply