Levon to Complete Resource Infill Drilling to Test a Starter Pit Scenario

http://www.levon.com/s/news-releases.asp?ReportID=784809

Levon Resources Ltd. (“Levon” or “the Company”) (TSX Symbol: LVN; OTCQX: LVNVF) announces that it plans 5,000m (28 core holes) in close spaced, infill drilling within the Cordero Felsic Dome portion of the 2014 Cordero resource (the “2014 Resource“), to test for near surface, high grade mineralization within the modeled open pit containing the 2014 Resource, calculated by Independent Mining Consultants (“IMC“) (news release of October 20, 2014) (Figure 1). Preparations for the drill program are being completed for an April 2017 start up.

In mid-2013, Levon acquired the 16 hectare Aida claim in the centre of the 2012 Cordero resource (news release of July 10, 2013) and grid drilled the claim. IMC then updated the 2012 Cordero resource to include the Aida drill results and produce the 2014 Resource. The 2014 Resource has yet to be delineated by drilling and is open to expansion around most of its perimeter, (Figure 1) and at a depth within the modeled pit (news release of September 3, 2014).

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s